A wardrobe that arrives made to measure can still fail on site if the room was never prepared for it. Before a Classic Paneled Solid Wood Wardrobe is loaded into a container, the installation plan should already answer four questions: what the wall and floor will actually support, which clearances the panelled doors and drawers need to swing and pull out, how the unit meets the ceiling and skirting, and who signs off each stage. Written as one page for the site team, the joinery supplier and the fitter, that plan is what keeps a made-to-measure order from becoming a site problem.
Start with the room survey, not the drawing
Made-to-measure sizing only works when the dimensions supplied are the dimensions on site. A solid wood wardrobe is unforgiving of an out-of-square wall or a floor that falls away along its length, so the survey should record more than length, height and depth.
- Floor level along the full run. Note high and low points, plus the finished floor level relative to any threshold, so plinth packing can be designed rather than improvised.
- Wall plumb and square. Record the deviation at each end of the run. That figure decides whether scribing panels are needed and how deep a shadow gap will read on site.
- Skirting, architrave and cornice. Decide early whether these are removed, cut back or worked around with a scribe; it changes both the carcass drawing and the painting trade's sequence.
- Ceiling line and services. Mark downlight positions, sprinkler heads, air diffusers, curtain rails and any recessed lighting that has to sit inside or above the carcass.
- Obstructions and access. Switches, sockets, radiator tails, door openings and the route from the lift or front door to the bedroom all belong on the survey sheet.
Ask for the survey drawings back with dimensions in one unit throughout, and check that the same finished floor levels appear on the architectural set. A mismatch found after production has started is the most expensive correction in a joinery package.
Fix the door swing and interior layout before ordering
Panelled doors carry their weight through hinges, and the classic moulded profile needs clearance from handles, bedheads and the opposite wall. Confirm the opening direction of every door against the room layout, then check what happens when it is fully open.
- Hinged doors against neighbours. Check handle-to-handle distance where two runs meet at a corner, and handle-to-wall where a door closes onto a return.
- Drawer and tray pull-out. Internal drawers, pull-out rails and any drawer-focused wardrobe layout need their full extension clear of furniture and flooring edges.
- Corner access. In an L-shaped corner wardrobe, state which carcass is fixed first and how the return unit is reached once the fitter starts.
- Interior configuration sign-off. Hanging heights, shelf spans, lighting positions and any integrated cabinet lighting should be shown on one approved interior elevation, not left to site decisions.
Material and finish choices belong in the same document. Finish options and timber species are specified per project, so the plan should name the selected door profile, paint or veneer colour, ironmongery model and hardware supplier for each elevation, with a signed sample reference where a colour has been approved by eye.
Plan delivery, storage and sequencing
Long carcass panels and solid doors travel well but store badly. The installation plan should say how the consignment reaches the room and where it waits.
- Route check. Measure lift doors, stair turns and corridor widths against the largest single panel on the packing list.
- Storage conditions. Keep panels flat, off the floor and out of wet trades' path. Solid wood and applied mouldings take on moisture and warp or stain if left in an unventilated room during plastering and painting.
- Trade sequence. Decoration, flooring and skirting should be complete at the wardrobe line before fitting begins; electrical first fix should already match the approved interior elevations.
- Packing list against drawings. Each crate labelled to its elevation lets the fitter confirm that doors, carcasses and hardware arrived together rather than in two shipments.
Set out the fitting method and the sign-off
Write the fixing method into the plan so nobody has to invent it on site: how the carcass is packed and anchored to the wall, whether a bridging or scribing panel closes the gap to an out-of-plumb wall, how the plinth is fixed and trimmed, and how doors are adjusted after hanging. Then state who inspects what.
- Level and line. Carcass checked level along the run and plumb at both ends before any fixing is loaded.
- Door alignment. Gaps even top to bottom, doors closing without touching mouldings, self-closing hardware behaving as specified.
- Finish protection. Touch-up carried out on site with the approved finish, edges and scribed joints clean, no residue on flooring or skirting.
- Snag list and handover. A short written snag list with named responsibility and target dates, closed out before final acceptance. Our installation and after-sales support covers on-site fitting, inspection and snag closure, spare parts and replacement, and ongoing maintenance.
What to send us with your enquiry
A complete enquiry shortens the gap between drawing and delivery. Send the survey dimensions in one unit, the finished floor levels, a marked-up plan of obstructions and services, the interior layout you want, and the finish direction you are working to. Where a project needs a different profile, size or finish from our standard range, our custom and OEM service covers bespoke dimensions, material and finish selection and prototyping before production.
Wardrobes are only one line in a villa or apartment fit-out. Where cabinetry, doors, wall panelling, flooring and lighting are ordered as part of one one-stop furniture and building materials package, levels, reveals and colour lines can be coordinated across trades instead of reconciled on site. Send your drawings and the room survey and we will return a proposal, quotation and confirmed specification for each wardrobe run.
SANTERSON — furniture and building materials manufacturer, China. Phone / WhatsApp: +86-13928214007 (PHILLIP). Email: santerson@qq.com