Wooden sliding doors sit in an awkward place on most project schedules. They are not a stock item you can swap out at the local merchant, yet they are rarely specified early enough to be treated as long-lead joinery. When they come from an overseas manufacturer, the specification has to be locked down before the opening is framed and the track is fixed — otherwise the door arrives for a rebate that no longer exists. This guide covers how to specify Santerson Wooden Sliding Doors with an overseas factory, what to confirm at each stage, and where projects usually go wrong.

What the product actually is

Santerson Wooden Sliding Doors belong to the sliding doors range within the site's windows and doors category. The catalogue describes them as made-to-measure residential wooden sliding doors, with three configurable dimensions of choice: size, material and finish, and a layout tailored to each project. That is the whole point of buying from a manufacturer rather than a distributor — the door is cut for your opening, not adjusted on site to fit one.

The same configurability runs across related products in the range. Santerson Flush Sliding Doors are specified the same way, with finish, layout and dimensions set per space. If your design intent is a door that reads as part of the wall rather than an object hung on it, that is the variant to ask about; if you want the panel and hardware visible as a design feature, the standard wooden sliding door is the better starting point.

Where the opening is really wide — a room divider, a closet run, a media wall — a door alone may be the wrong answer. Santerson also makes Wooden Sliding Panels and Wooden Sliding Door Wardrobes, built to the same made-to-measure logic. Specifying a door where a panel system is needed, or the reverse, is one of the more common ordering errors in this category, so decide the function first and let the product follow.

What to confirm before you send an enquiry

A manufacturer cannot price a sliding door from a photograph. Have these settled before you write, or the first round of correspondence is wasted:

  • The opening, not the door. Give the finished structural opening width and height, plus the floor finish build-up — screed, adhesive, tile or engineered board thickness. A few millimetres of difference in finished floor level changes the bottom clearance and can leave a panel dragging.
  • Which side the door travels to and where it stacks. Confirm wall space at the stacking end, including skirting, switches, radiators and any dado lighting that sits in the panel's path.
  • Track type and load path. Top-hung or bottom-rolling is a decision you make, not one the factory guesses. It depends on what is above the opening — stud wall, masonry, steel lintel or a ceiling void.
  • Finish intent. Timber species or substrate, stain or paint colour, gloss level, and whether the two faces of the panel need different finishes. Send physical colour references where you can; screen colours are not specifications.
  • Quantity and phasing. A single door for one villa is handled differently from a repeated set across an apartment scheme, where identical units have to match unit for unit.

How the process with an overseas manufacturer usually runs

SANTERSON describes itself as a China-based furniture and building materials manufacturer and one-stop supplier, operating since 2008, with offices listed in China, Vietnam, Singapore and South Africa. For a doors enquiry the practical value of that structure is not the office list — it is that the same team handling your joinery also handles cabinetry, wall panelling, flooring and lighting on the same project, which matters when a door has to match something else.

The workflow the site sets out runs through consultation, design and planning, production, logistics, installation and after-sales. In practice for sliding doors, that means:

  1. Design and prototyping. The custom and OEM service covers bespoke sizes, material finishes and detailing, with 3D modelling and prototyping listed among the services. Ask to see the drawing of your actual door — elevation, hardware position, track section — before anything is cut.
  2. Detail confirmation. This is where you sign off dimensions and finish. Everything after this point costs money to change.
  3. Production and quality control. Confirm what gets inspected before packing, and how panel pairs are matched for grain and colour if your design calls for it.
  4. Packing and shipping. The logistics service covers freight by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, container loading and door-to-door delivery. Sliding panels travel flat and need edge protection; ask how the panels are packed and how hardware is separated from leaves.
  5. Installation and after-sales. The site lists on-site installation, inspection and snags, spare parts and maintenance support. Whether that reaches your site depends on location and project, so confirm it in writing for your address rather than assuming the service description covers you.

Matching doors to the rest of the fit-out

The strongest reason to buy doors from a furniture manufacturer is consistency. A whole-house project rarely needs one timber product; it needs a wardrobe front, a kitchen, a sideboard and a door that all read as the same scheme. The mid-century modern whole-house custom furniture project on the site shows how far this goes: entry storage, living room sideboard, integrated bay-window cabinet and bed platform, plus a customised barn door for the bathroom, all in one warm wood tone with hidden pull-free handles.

If your sliding door has to disappear into panelling, ask about integrated door and paneling and the wider wall panel systems at the same time as the door. Specifying them together means one drawing set, one timber order and one colour batch — specify them separately and you are matching two production runs after the fact.

What to write into the purchase specification

Before payment, make sure your document trail states the following. It protects both sides and removes most of the arguments that arise on delivery:

  • Finished opening dimensions for every unit, with a tolerance stated rather than assumed
  • Panel construction, substrate and face material as named — not "oak look" or "walnut effect"
  • Finish system and colour reference, with the gloss level recorded
  • Track, hanger and hardware make and model, load rating, and whether they ship with the doors or separately
  • Delivery terms, destination, and who handles customs clearance at each end
  • What is inspected before shipment, and how damage in transit is documented on arrival

Material grades, timber species options, hardware suppliers and current production capacity change with the factory's sourcing. Treat anything you read on a product page as a starting point and get the specification confirmed for your order in writing.

Checklist before ordering

  • Decide function first: door, sliding panel system or wardrobe front
  • Survey finished openings with floor build-up included
  • Choose the track type against the actual structure above the opening
  • Send colour references, not screen shots
  • Approve a drawing of your door before production starts
  • Specify doors and panelling together if they must match
  • Confirm delivery terms and installation scope for your site, in writing

If you are specifying made-to-measure wooden sliding doors for a villa, apartment or hospitality project, send the drawings and quantities to SANTERSON — enquiries go to santerson@qq.com or WhatsApp +86-13928214007 (PHILLIP), and the contact page states a response within 24 hours during Monday–Saturday business hours.