A materials schedule is the document that keeps a whole project honest. It lists every finish and fitting room by room, so the design intent survives from the first mood board to the last delivery note. Interior doors are where schedules usually start to drift, because a door appears in three places at once: as a drawing detail, as a line on a bill of quantities, and as something a joiner has to reconcile with the wall next to it. This article walks through how to carry Santerson Modern Slim Frame French Doors through a whole-project materials schedule, using the room-by-room structure that project teams already work with.
Why slim frame doors need their own line in the schedule
Standard hinged doors often slip through a schedule unremarked, because a site team can absorb small variations on the day. A full-height glazed pair with a narrow sightline cannot be treated that way. The opening, the floor finish level and the adjoining wall build all have to agree before anything is ordered.
In our catalogue, Santerson Modern Slim Frame French Doors sits in the French Doors collection and is specified per project: made-to-measure sizing, material and finish options, with dimensions and selected specifications confirmed for each project. That configurability is exactly what a schedule should capture, rather than leave to be settled during construction.
The columns that carry the detail
A door line usually carries a code, a room reference and a size. For slim frame doors, add four more fields so the entry can be quoted, ordered and checked against what arrives on site.
| Schedule field | What to record | Why it matters at ordering stage |
| Opening size and threshold level | Width, height, finished floor levels either side of the opening | Made-to-measure sizing is set from these figures; a changed floor level changes the frame |
| Leaf layout and glazing | Number of leaves, hinge hand, glazing type and pattern | Determines hardware sets, and which rooms can be released for production first |
| Frame and finish reference | Finish name, texture and the sample or drawing reference the team approved | Keeps the door finish consistent with Integrated Door & Paneling work in the same room |
| Package and delivery reference | Which container or shipment phase the item belongs to | Glazed doors want a protected, later delivery than hard finishes, so they do not sit on site waiting |
Where a project also uses Santerson Arched French Doors, give the two door types separate codes even if they appear in adjacent rooms. Different head details mean different setting-out dimensions, and a single shared code is how the wrong pair ends up on a delivery note.
Grouping doors with the rest of the package
Doors ordered in isolation arrive in isolation, and then need their own inspection, their own storage and their own installation visit. Grouped into one procurement package with the joinery and panelling they sit against, they are set out once, against the same drawings.
This is one reason a villa or hospitality fit-out is easier to coordinate through a one-stop solution than through separate suppliers: doors, panelling, cabinetry and finishes are produced against a single set of confirmed dimensions. For projects that need non-standard sizes or finishes, the custom & OEM service covers bespoke material finishes and textures alongside custom furniture design and prototyping, so a door finish specified in the schedule can be matched to the joinery around it.
Sequencing doors into delivery and installation
Once every door line carries its own code, dimensions and finish reference, the remaining scheduling decisions become mechanical. Confirm which rooms are released for production first, then align those releases with the shipment plan; logistics and door-to-door delivery covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, so each door package can be booked against a named delivery phase instead of one bulk arrival.
Leave the final check for the site stage. Installation and after-sales support includes on-site installation, inspection and snag resolution, which is where door leaves are adjusted to the finished floor levels recorded in the schedule.
A short checklist before you issue the schedule
- Each door type has its own code, even where two types sit in one room.
- Opening sizes are stated against finished floor levels, not structural slabs.
- Finish references point to an approved sample or drawing, not a colour name alone.
- Made-to-measure items are flagged so nothing is ordered off a nominal size.
- Delivery phases are named per package, with glazed items protected and staged.
Doors read well in a schedule when they can be quoted, ordered and inspected from the line alone. If you are assembling a materials schedule for a villa or hospitality project, send us the door section and the room drawings, and we will price them against the rest of the package.