Vanity lighting is one of the small line items that causes the most rework on bathroom fit-out projects. It sits between three trades — joinery, electrical and tiling — and it is usually specified late, after the vanity carcass and mirror have already been fixed to the wall. Procurement teams do not need to become lighting designers. They do need a document set that lets the supplier, the electrician and the site foreman work from the same information.
What makes vanity lighting different from other bathroom lights
A ceiling downlight is specified on its own. A vanity light is specified against a piece of furniture: its width has to relate to the basin and mirror, its height has to clear the tapware splash zone, and its fixing centres have to land where the cable was actually run. When the vanity order and the lighting order are placed with different suppliers, nobody owns that interface until someone stands in the room holding a tape measure.
That is why we recommend treating the vanity, mirror and vanity lighting as one package on the purchase order. Where the joinery and the light come from the same manufacturer, the fixing detail, the finish match and the delivery date travel together instead of being reconciled on site.
The eight items to record for every vanity light
For each bathroom type in the project — guest, master, ensuite, powder room, staff or common bathroom — one row per fixture. Keep it as a spreadsheet that travels with the drawing set.
| Field | What to write down |
| Room and fixture code | Match the drawing reference exactly, for example ENS-01 / VL-A, so the electrician's first-fix schedule and your purchase order use one language. |
| Vanity it belongs to | Vanity type, overall width, basin position (left, right, centred), countertop material and thickness. A 1200 mm double vanity and a 900 mm single vanity rarely take the same light. |
| Mirror or mirror cabinet | Height, width, frame detail and whether the mirror already has its own light source. This decides whether you need a wall light above, sconces at each side, or nothing at all. |
| Mounting dimension | Finished floor to the centre of the fitting, and the horizontal fixing centres. State which surface the fixing goes into: timber stud, framing ply, tile over substrate or masonry. |
| Electrical point | Where the outlet box sits relative to the vanity centreline, whether the circuit is switched at the door or on the fitting, and whether a driver is inside the fitting or remote. |
| Photometric request | Ask for lamp output (lumens), connected load (watts) and colour temperature from the supplier's current specification sheet. Record what they actually quote rather than assuming a value carried over from a previous project. |
| Bathroom zone and enclosure | Note the position of the fitting relative to the basin, shower enclosure and bath. Ask the supplier to confirm the ingress protection rating and suitability for that position on your layout. |
| Switching and control | Dimming method, driver compatibility with the project's switch plate range, and any occupancy or night-time scene requirement in hotel guest rooms. |
Two more columns save time later: a sample reference number and an approval date. Vanity lighting is frequently value-engineered out of the electrical package and pushed back in as a decorative item, which resets the clock on approvals nobody was tracking.
Specifications to request from the supplier, not assume
Product imagery is not a specification. Before you place the order, ask for the data sheet that goes with the exact configuration you are buying, and check these points:
- Lamp output and connected load for the fitting as built, including any integral LED module.
- Colour temperature and, if the project uses a mixed range, how consistent the batches are between rooms.
- Ingress protection rating and the wet-area positions the fitting is rated for.
- Dimming behaviour and which drivers or switchgear it has been tested with.
- Serviceability: whether the LED module or driver can be replaced, and by what access route once the fitting is on the wall.
- Finish code and the matching codes for mirror frames, tapware and cabinet hardware in the same room.
If a supplier cannot give you these numbers for the configuration you are quoting, that is a finding to record on the comparison sheet — not something to fill in with a typical value.
How custom vanity lighting removes site problems
Standard fittings are made to standard widths. Custom vanities are not. When the joinery is made to measure, a fixed-width light either overhangs the carcass or leaves an awkward gap on one side. Our wall sconce and lighting accessory ranges are offered with project-specific sizing, material and finish selection, so the fitting can be dimensioned to the mirror and vanity rather than the other way round.
The same logic applies where the light is built into the joinery itself. Integrated cabinet lighting needs the driver location, cable route and heat path decided during carcass design — after the cabinet is manufactured, there is no clean way to add it. For guest rooms where storage and reflection are combined, an LED mirror cabinet can replace a separate mirror and wall light with one item on the schedule.
Where the brief calls for a decorative piece rather than task lighting, that decision belongs in the same document too. A sculptural decorative LED sconce for a bathroom vanity area changes the fixing detail and often the circuit, so it should be approved with the joinery drawings, not selected from a catalogue at handover.
Coordinating the package across trades
The single most useful line in your document is the sequence. Write down who confirms what, and by when:
- Joinery supplier issues vanity elevations with the mirror zone and any light channel marked.
- Electrical contractor marks the first-fix outlet positions on those same elevations, not on a separate lighting layout.
- Tiling sets out the tile joints against the fixture centreline where the fitting lands on a tiled wall.
- The sample fitting is checked against the installed vanity and mirror before the batch is released for production.
On multi-unit work, one mock-up bathroom settles every question above at once: mounting height, glare into the mirror, driver access, and whether the finish reads correctly against the tapware under the project's ambient lighting. That mock-up sign-off should be a named milestone with a date.
If you are assembling bathroom fixtures for a villa or hotel project, send us the vanity elevations and the electrical layout together. We will confirm fitting sizes, finishes and mounting details against your drawings before production starts — see bathroom fixtures for hotel projects or contact our project team.