A frosted glass aluminium frame wardrobe reads simply on a drawing: an aluminium carcass, a translucent door panel, a run of shelving behind it. On site it is one of the last items to arrive and one of the first things a client judges. If the opening is not finished, the floor level is wrong, or the panels land before the trades who fit them have been booked, the whole bedroom handover slips. This guide walks through how we sequence measurement, production, freight and installation so the wardrobes go in once, and go in clean.

Why frosted glass and aluminium change the delivery conversation

Our Frosted Glass Aluminum Frame Wardrobes are made to measure, with the finish, layout and dimensions specified for each space. That flexibility is the point of the product, but it also means nothing on site can be approximate. A made-to-measure unit has no tolerance for a wall that moves out of line because a plasterer skimmed it late, or a ceiling that drops to take an air-conditioning duct.

Two characteristics of this product drive the schedule:

  • Glass panels travel as fragile cargo. Frosted door panels are packed separately from frames and hardware, with corner protection and interleaved padding. They need a flat, dry staging area at the destination — not a pavement, and not a shared loading bay where other trades stack materials on top of them.
  • Framed glass needs a rigid opening. The aluminium frame carries the door hinges and the sliding track. If the wall or floor it fixes to is not plumb and level, the doors bind, and no amount of adjustment at the hinge solves a bowed reveal. That is a trade-coordination problem, not a wardrobe problem.

Step 1: Lock the opening before production starts

We build from dimensions you confirm, so the sequence on your side matters more than the transit time. Before we release an order to production, we need four things settled.

  • Final floor and ceiling levels. Finished floor height, including any screed, underlay or tile build-up, plus the true ceiling height at both ends of the run.
  • Set-out of adjacent services. Skirting, light switches, downlights, curtain lines, air-conditioning grilles and door swings that interact with the wardrobe doors. Frosted glass is forgiving about what sits behind it but unforgiving about a handle striking a switch plate.
  • Wall construction. What the frame fixes into — masonry, stud partition, or a plasterboard wall that needs noggins added before it is closed up. This has to be decided while the wall is still open.
  • Interior layout confirmation. Hanging heights, drawer banks, shelving bays and any internal lighting. Once the panel cut list is issued, moving a shelf bay means re-cutting panels.
A rule we apply on residential projects: measure twice — once at first fix to confirm the set-out, then again after finishes are complete for the final dimensions. On apartments and villas where several bedrooms are furnished in one package, that single step prevents most of the rework we see.

Step 2: Decide who receives the goods, and when

Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, export paperwork, packaging and container loading plans, shipment tracking and delivery to the site address. What we cannot decide on your behalf is whether that site address is ready to receive the cargo.

Before we book the sailing or the flight, confirm these four points with your builder or project manager:

Question to settle Why it decides the shipping date
Is there covered, dry storage on site? Glass panels and hardware should not sit outdoors. If storage is unavailable, delivery must be timed to the installation window rather than to the port arrival.
Can a delivery vehicle reach the loading area? Narrow residential streets and basement areas with low clearances change the last-mile vehicle. Split consignments are often easier than one large drop.
Which other trades are on site that week? Wardrobes fit after painting, flooring and electrical rough-in are complete, but before final cleaning and handover.
Who signs for the consignment? A named recipient inspects cartons for damage at delivery and reports it immediately, which is what makes a replacement or claim workable.

Step 3: Group the wardrobes with the rest of the joinery

Wardrobes rarely travel alone. On a bedroom fit-out you are usually ordering built-in furniture as a set: wardrobes, sideboards, floating shelves and sometimes vanity units. Shipping these together means one customs clearance, one delivery and one installation visit instead of three. It also means finishes are specified in a single pass, so the aluminium frame tone is matched to the drawer fronts rather than reconciled after the fact.

If you want frames, handles or timber-look finishes aligned with other cabinetry in the property, raise it at quotation stage rather than after production begins. Our custom and OEM service covers bespoke finishes and textures, prototyping and brand-specific detailing, which is where those matches get settled.

Step 4: Book installation into the programme, not after it

Our installation and after-sales support covers on-site fitting, inspection with a snag list, warranty coverage and spare parts. The planning point is that installation has to appear in the construction programme as a task with a start date and prerequisites — not as something added once the boxes have landed.

The installation sequence we work to:

  • Prerequisites closed out. Walls painted or wallpapered, flooring laid and allowed to settle, skirting fitted, electrical positions fixed and tested, ceiling line complete.
  • Frames first, panels last. Frames are levelled, fixed and checked for square. Glass doors go on at the end of the visit so they are not struck repeatedly while other adjustments are made.
  • Adjustment after fixing. Door alignment, soft-close and sliding-track adjustment happen once the frame is fixed in place — an empty frame out of level reads differently from a loaded one.
  • Snag walk with the client or agent. Both sides sign off against the same list, so anything outstanding becomes a short punch list rather than a reopened job.

Step 5: Plan for what happens after handover

Frosted glass shows fingerprints and edge marks far more readily than a painted board, so the care note that travels with the wardrobe matters as much as the fitting. Two points worth passing to whoever maintains the property:

  • Clean frosted panels with a soft cloth and a mild solution. Abrasive pads and harsh glass cleaners leave a haze that cannot be reversed.
  • Keep the hardware schedule for the project. Hinges, runners and replacement panels are ordered against the confirmed specification, which is why we keep that record on file for each order.

A short checklist to send to your site team

  • Confirm finished floor and ceiling levels before panels are cut.
  • Decide the wall fixing detail while partitions are still open.
  • Agree a delivery window that has storage available, not just a date.
  • Name the person who inspects and signs for cartons.
  • Place installation in the programme after painting, flooring and electrical work.
  • Book the snag walk before the site is cleaned and locked.
If you are specifying framed glass wardrobes for a villa, apartment or hospitality fit-out and want the delivery and installation sequence worked out alongside the product itself, send us the drawings and the site programme. We will confirm dimensions, packaging and an installation window against them — contact SANTERSON to start that review.