A glass pocket door looks simple on a drawing. It disappears into the wall, so nobody thinks about what holds it, how deep the cavity is, or what happens when the opening has to be finished after the frame is already in place. That simplicity is exactly why custom pocket doors go wrong: the manufacturer only builds what the paperwork says, and if the paperwork is thin, the door arrives as a guess.
Our Santerson Glass Pocket Doors are made to measure for residential projects, with the finish, layout and dimensions specified per space. Below is the information we need from an architect, builder or project buyer to turn a marked-up plan into doors that fit on the first visit, plus what we send back at each stage.
Start with the wall, not the door
A pocket door is a wall assembly before it is a door. The leaf travels into a cavity, so the wall has to be built around the opening you specify rather than the other way round. Tell us early:
- The structural situation at the opening — new build or an existing wall being altered, and whether the wall is load bearing.
- The finished wall thickness on both faces, including plasterboard, render, cladding or tile buildup, not just the stud depth.
- The clear opening width and height you want once floors and finishes are complete, with the floor finish level marked.
- Where skirting, architrave or a flush detail will run, and whether the reveal is expected to match the wall plane.
Pocket doors are ordered against finished dimensions. Send us the dimension at the point of handover, with the finish build-up listed separately, so we can allow for it instead of you trimming on site.
Specify the glass and the frame as separate decisions
The leaf and the frame age differently, and they are chosen for different reasons. Give us both sets of instructions.
| Element | What to state in the brief |
| Glass | Clear, frosted, smoked or ribbed; fully glazed or part glazed; and whether privacy or light transfer matters more in that room. |
| Frame | Frame colour or finish, profile width, and whether the frame should read as a design feature or sit quietly against the wall. |
| Handle and hardware | Recessed pull or surface handle, lock or no lock, and any accessibility requirement for the grip. |
| Threshold | Flush floor track or surface track, and whether the same detail continues into an adjoining room. |
If you have a finish schedule from the joinery package, send it. Pocket doors in a villa are usually specified alongside glass sliding doors and built-in wardrobes, and matching the frame profile and glass across those items is what makes the interior read as one scheme rather than several purchases.
Send drawings that show three things
A single elevation is rarely enough. What we need, at minimum:
- A plan showing opening position, wall thickness and the pocket side, so the cavity direction is unambiguous.
- An elevation with clear opening dimensions, leaf overlap and the finish line of the wall.
- A section or detail note at the head and floor, particularly where a ceiling reveal, cornice or tiled skirting interrupts the frame.
Where a room has more than one pocket opening, mark each one with a unique reference and keep that same reference on your schedule, our quotation and the delivery labels. Numbered openings are the cheapest way to avoid a door being sent to the wrong level.
Tell us what sits behind and beside the pocket
The cavity is competing for space with everything else in the wall. Flag it before we lock dimensions:
- Pipework, ducting, trunking or back boxes for switches positioned inside the pocket zone.
- Radiators, mirrors, wall-hung basins or cabinetry fixed to the same wall.
- Insulation, acoustic batts or fire-rated requirements stated by your specifier — send the requirement text rather than a summary, so we can confirm what the assembly supports.
This is where site experience matters. If a service clashes with the pocket, it is far cheaper to move the pipe in the drawing stage than to open a finished wall later.
Confirm quantities, phasing and access before production
Made-to-measure doors are cut once. Alongside dimensions, we need the project shape around them:
- Total quantity per opening reference, with any spares you want held.
- Whether the doors ship in one consignment or in phases by floor or building.
- The delivery address, port of discharge and whether your Incoterms put inland transport with you or with us.
- Lift capacity, stair widths and storage on site — a full-height glazed leaf needs a route from the truck to the opening.
Our logistics and door-to-door delivery service covers freight booking, packaging and container loading, customs paperwork and shipment tracking. Tell us your port and delivery address early so the packing spec matches the route rather than being decided at the end.
What we return to you, and in what order
For a custom pocket door enquiry, our process follows the same steps as the rest of our project work — design and specification confirmation, then production:
- A review of your drawings against the opening dimensions you have listed, with any clash or ambiguity raised in writing.
- A quotation showing each opening reference separately, so substitutions and omissions are visible rather than buried in a lump total.
- Confirmation of glass type, frame finish, hardware and track before we release to production.
- Packing list by opening reference, so the fitter on site can match each leaf to its wall.
If your team is coordinating doors with other built-in items from the same fit-out, our custom and OEM service handles material and finish matching across wardrobes, panelling and doors in one production run. That reduces the number of suppliers chasing each other over reveal sizes.
Before you send the enquiry
Attach your door schedule, the plan and elevation for each pocket opening, the finish build-up note for the wall, and your required delivery window. If any dimension is still provisional, say so on the drawing rather than sending a rounded number — we will hold that line as unconfirmed instead of designing to it.
Common brief gaps we see on pocket door projects
The opening dimension is given rough-to-frame only.
Rough opening and clear opening are not the same number. Send both, plus the finish thickness, so the leaf size and wall buildup can be checked against each other.
The pocket side is never marked.
A door can pocket left or right. Marked on the plan, this takes one arrow; discovered on site, it means rebuilding the cavity.
Glass is chosen from a photo.
Send the glass type by name and confirm whether the same glass appears elsewhere in the project. Photos shift colour between screens; a named specification does not.
Hardware is left until after production.
Recessed pulls need a cut in the leaf. Decide the handle at the drawing stage, together with whether the room needs a lock.
Related products in the same package
Where a project calls for a pocket door that reads as plain wall when closed, Classic Pocket Doors and Santerson Wood Veneer Pocket Doors are specified on the same made-to-measure basis, with finish and layout set per space. Mixed glass and veneer leaves across one floor plan is normal — just keep the frame profile and track detail consistent so the different leaves still belong to one design.
If you have drawings for a residential project and want the pocket openings quoted opening by opening, send the schedule, plans and elevations with your required delivery window. We will check them against the openings and come back with a specification we can both sign off before production starts.