A partition sliding system looks simple on a drawing: two or three panels, a track, a pocket in the wall. In production it is one of the less forgiving items in a fit-out, because the opening, the structure above it and the panel build all have to agree before the first panel is cut. If you are specifying Santerson Partition Sliding Systems for a villa, apartment or hospitality room, the following points are worth closing out in writing before manufacturing starts.

1. The opening, measured from the finished floor and finished wall

Sliding panels are built to the clear opening, not to the nominal dimension on a plan. Before production, confirm which surfaces the measurement refers to: finished floor level or structural slab, finished wall face or stud line. A floor build-up of screed, adhesive and stone or timber changes a height that was already tight, and the panel cannot be trimmed back the way a door can.

Send us the width and height at three points across the opening rather than one number, together with the wall construction on both sides. If the panels are meant to disappear into a pocket, the pocket depth has to be agreed at the same time — it is a framing job, not something the joinery can absorb later.

2. Track type, running gear and how the panels stack

The track decides how the system behaves for years, so fix it before the panel design is signed off. Confirm whether the track is ceiling-mounted or floor-mounted, whether it is exposed or recessed into a header, and how many panels run on how many tracks. A two-panel bypass and a three-panel stacking arrangement need different structural support above the opening.

Also settle the daily-use details: soft-close or plain runners, bottom guide or floor track, handle style, and whether a lock is required for a bedroom or bathroom application. These parts are visible in use and are the items owners notice first when something sticks.

3. Panel construction and finish

Our Wooden Sliding Panels are made to measure, so the panel build needs to be stated rather than assumed. Confirm the substrate and the surface — laminate, lacquer, veneer or a painted panel — and the edge treatment on both faces, since sliding panels show their edges every time they move. Where a full-height panel meets a low ceiling, an over-panel to the soffit is usually the neater solution, and it has to be drawn in advance.

If the partition sits alongside other joinery, match the finish at specification stage, not on site. Our team can work from your drawing, reference photo or existing sample so the panel colour and grain line up with wall panel systems, wardrobes and doors supplied in the same package.

4. What sits above and beside the opening

A header or pocket framing carries the track load, so confirm who supplies and installs that frame. In a masonry wall the fixing method differs from a stud wall, and a timber stud wall may need noggins at runner height. This is exactly the kind of interface that causes delay when it is left unassigned between trades.

Where acoustic separation or glass matters, tell us at enquiry stage rather than after order confirmation. Acoustic Sliding Panels and Glass Sliding Panels are separate configurations with different framing, sealing and safety requirements, and the surrounding structure has to be prepared for them.

5. Packaging, delivery and who installs

Long panels travel badly in mixed containers. Confirm panel lengths against door widths, lift sizes and stair turns at the destination, and confirm whether the shipment goes palletised with other goods or as dedicated joinery crates. Tell us the site access early so the packing matches the route the panels will actually take.

Then decide who fixes the track and hangs the panels: your local contractor or our installation support. Both are workable, but adjustment on site should be planned for, since a sliding system is set up after the surrounding finishes are complete.

A short pre-production checklist

  • Clear opening width and height at three points, with finished levels identified
  • Pocket depth and framing responsibility confirmed in writing
  • Track type, mounting method, panel count and stacking direction agreed
  • Runners, guides, handles and lock specified
  • Panel substrate, surface finish and edge detail approved with a sample
  • Header framing and fixings assigned to a trade
  • Acoustic or glass requirement declared before order confirmation
  • Site access, packaging and installer confirmed before production starts

Send us the drawings, photographs or a reference image of the opening, and we will confirm the configuration, hardware list and lead time for your project. As a manufacturer of furniture and building materials, we can also produce the matching wardrobes, doors and wall panelling in the same finish, so the partition reads as part of the joinery rather than an add-on.