A quote that lists only a model name and a unit price is not a quotation — it is an invitation to argue later. If your project includes media or living-room joinery from our range, the line item worth interrogating is the Santerson Open & Closed Combo Units, a configurable TV and media unit that mixes open shelving with closed storage. Because it is made to measure rather than stocked, everything that sets its price and its fit has to be written down before two suppliers can be compared on anything at all.

Why this category produces vague quotes

Open-and-closed combination units sit in our TV Cabinets / Media Units collection alongside Santerson Freestanding TV Cabinets and glass-front media units. They are not a fixed catalogue item with one set of dimensions: layout, overall size, material and finish are specified per project. That is exactly why two quotes for "one combo unit" can differ by a wide margin without either supplier doing anything wrong. Before you read a price, confirm that the quote describes the same object you are buying.

Check 1: the dimensions are drawn, not described

Start with the size. A combo unit is specified as an overall width and height plus a bay layout, so ask for an elevation drawing showing overall width, height and depth, together with the internal dimensions of each compartment. A quote that states only a nominal length tells you nothing about shelf spans, the height reserved for the screen recess, or whether the closed section will clear skirting or a wall-mounted bracket. On our side we produce made-to-measure sizing, so the drawing — not the product name — is what we manufacture against.

Practical test: send the same room elevation to two suppliers and compare the drawings they return. If one has quietly reduced the closed section to hit a price, you will see it on paper long before it appears on site.

Check 2: where the open part ends and the closed part begins

The whole point of an open-and-closed combination is the balance between display and concealment, so the quote should split the unit into bays and state which are open shelves, which are doors or drawers, and which are open display niches. Specify shelf thickness and whether shelves are fixed or adjustable; a line that says "open shelving" without a fixing method is incomplete. If your design borrows from an integrated wall rather than a standalone cabinet, the equivalent items are Santerson Mixed Open & Closed Storage and Storage & Display Combo, and the split should be described in the same way.

Check 3: substrate, finish and edge treatment named separately

"Custom finish" is not a specification. A usable quote names the panel substrate, the surface material, the colour or grain reference, and how edges are handled — edge banding, a lacquer wrap or a solid lipping. Our Custom & OEM Service page lists bespoke material finishes and textures, so we can work to a project standard, but the standard has to be stated in writing. For living rooms the same finish language applies across Santerson Mixed Open & Closed Systems and closed modular units, so ask for one finish schedule that covers every joinery item in the dwelling instead of a separate description per product.

Practical test: request a physical finish sample with the quotation, not after it. A grain and sheen decision taken from a screen is where most variation claims on a joinery package start.

Check 4: ironmongery listed by function

Doors and drawers are where a media unit is judged in daily use, so the quote should itemise hinges, soft-close mechanisms, drawer runners and the opening method — handleless profile, push-to-open or a visible pull. State the weight and size of each door as well; if you prefer concealed doors elsewhere in the same wall, Santerson Handleless Concealed Doors are made to measure with their own frame and finish notes, and they should appear as their own line rather than being absorbed into the cabinet price.

Check 5: the television recess, cables and any lighting

A media unit has to serve the equipment inside it. The quote should show the size of the recess reserved for the screen, whether the fixing behind it is timber-backed or steel-backed, how cables drop from that recess into the closed section, and where power outlets sit. If the design includes lighting, treat it as a separate technical line: Santerson Integrated LED Media Units show how integrated lighting is built into these units, and the quotation should record where the driver sits, what cable is provided and how the circuit is switched. Where the wall itself carries the screen, ask for the same detail on Santerson Integrated TV Panels or a sliding panel TV system, because the mechanism and clearances change what the joinery has to allow.

Check 6: load, span and fixing assumptions

Ask what each open shelf is expected to carry and over what span. Long unsupported shelves sag under books and display objects, and the fix — an intermediate support, a thicker panel or a shorter span — costs far less to specify at quotation stage than to correct on site. For anything wall-mounted, including Santerson Wall Mounted Media Walls and Floating TV Units, the quote should state the fixing method and what wall build-up it assumes. That assumption belongs to your local builder, so put it in writing and have them confirm it.

Check 7: what is excluded, and how site measurements happen

Read the exclusions before you read the total. Typical gaps are on-site measurement, wall preparation, skirting removal and reinstatement, electrical first fix, and packing out an out-of-plumb wall. Our project workflow runs from design consultation and space planning through material selection, manufacturing, project management and handover, so we can coordinate those interfaces — but only if they appear in the scope you signed. Confirm who measures the opening, when, and after which trades have finished.

Check 8: packaging, freight and delivery terms stated per unit

Made-to-measure joinery travels badly if it is packed as one lump. The quote should state panel-by-panel packing, the number of crates or cartons, total volume and weight, and the delivery terms that apply to your site. Our logistics and door-to-door delivery service page describes freight forwarding by sea, air and rail with customs paperwork and container loading planning; ask which documents come with a joinery shipment and who signs for damage at unload.

Check 9: installation sequence and the snag list

Ask how the unit is installed, by whom, and whether installation falls inside the quoted price. A combination unit normally arrives as modules that are assembled and fixed on site, which means it needs a clean, level wall to sit against. Our installation and after-sales support page lists on-site installation, inspection and snagging, spare parts and ongoing maintenance; ask which of those are included in your price, what is inspected at handover, and how a snag is raised. That way the definition of "complete" is agreed in advance rather than argued at the end of a programme.

Check 10: one schedule, one revision trail

Finally, insist that the quotation be issued as a numbered schedule: unit reference, drawing number, finish code, ironmongery list, lighting notes, packaging data and exclusions, each with a revision date. When you change a shelf or move a door, the change should come back as a reissued line, not a text message. That single habit removes most disputes on a joinery package, and it applies equally to a standalone combo unit and to a full-height wall built from Santerson Full Height Storage Walls.

If you are pricing joinery for a villa or apartment package, send us the room elevation and the finish standard you are working to. We will return a schedule in that format — dimensions, substrate, ironmongery, lighting, packaging and exclusions stated line by line — so your comparison against other furniture and building materials suppliers is a comparison of like for like.

SANTERSON — furniture and building materials manufacturer, Foshan, China. Enquiries: PHILLIP, +86-13928214007 (phone/WhatsApp), santerson@qq.com.