A swim spa sits between a pool and a spa, which is exactly why its specification slips so easily. The shell arrives as one delivery, but the power supply, the deck opening, the drainage route and the equipment access panel are all built by other trades around it. Getting Outdoor Swim Spa WS-S06CT-L onto a villa terrace or a resort garden therefore takes a short list of measurements and decisions, exchanged early enough that the civil works can be shaped around the unit rather than the other way round.
Start with the shell envelope, not the picture
The catalogue entry for this model lists an overall envelope of 6670 × 2380 × 1400 mm. Those three numbers do most of the planning work. The length and width decide whether the unit passes through gates, side passages and lift openings on its way to the terrace or courtyard; the depth decides excavation for a semi-recessed installation, the height of any surrounding retaining wall, and the water line relative to the finished deck level.
Treat the catalogue envelope as the shell, and add working space around it. A unit dropped into a fixed opening with no clearance cannot be levelled, and its pumps, filters and control system cannot be reached later. For a fully recessed installation, we ask for the finished excavation dimensions, the deck finish build-up, and where the equipment compartment will sit relative to a walkable surface.
| Catalogue item | Value shown on the product page |
|---|---|
| Model | WS-S06CT-L |
| Catalogue dimensions | 6670 × 2380 × 1400 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump / filter pump | 1 pc / 1 pc |
| Jet total | 31 pcs |
| LED lights | 4 |
| Total power | 8.35 kW |
The figures above are transcribed from the catalogue entry for this specific model, and they describe a configuration. Other variants in the same family carry different lengths and feature sets — the WS-S06CT entry, for example, lists a shorter shell and omits the temperature-setting feature shown here. When two models look similar in photographs, the specification table is what distinguishes them.
Electrical input: send the load, not just a socket location
The total power listed for this configuration is 8.35 kW. That number goes to the project electrician before cable sizes and distribution boards are fixed, because a swim spa load behaves differently from general lighting or outlet circuits: it runs long heating cycles, and it sits outdoors where protection and earthing arrangements are set by local regulations rather than by us.
What we need from your side is the available supply at the unit location — phase, voltage and frequency — together with the electrician's chosen circuit arrangement. We confirm the equipment included in the selected configuration and its electrical requirements; the local contractor confirms compliance with the applicable wiring rules and obtains whatever approvals the site requires. Splitting that responsibility clearly at quotation stage is what prevents a finished deck from being reopened.
Configuration choices change the bill of materials
The catalogue lists options across this range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one has a footprint and a service consequence, so the list should be settled before production rather than after.
- Heat pump and insulation — determine how the unit holds temperature through cooler nights, and whether the installation is in a mild or cold-climate location.
- UV sterilization and sand filtration — decide where the media, backwash route and drain connection sit; a drain needs to exist before the deck is poured.
- Steps and access — affect the deck edge detail and the entry position relative to loungers and shade structures.
- Swim training system and jets — 31 jets and one swim unit in this configuration set the pump duty; if a project needs a longer swimming channel, an extended model such as the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool may fit the plan better than a compact shell.
Site conditions that decide how the unit is delivered and set
Access is the item most often discovered late. Please send photographs of the route from the delivery vehicle to the final position, plus the clear width and height of gates, passages and any overhead obstruction, and confirm whether a crane or forklift can reach the area. For rooftop or upper-level terraces, the structural engineer's allowable load needs to be settled before the shell is manufactured.
The surrounding package matters too. Where the spa sits next to aluminium sling sun loungers with adjustable backrests or a pergola, deck levels and shade positions should be drawn together with the spa outline so that drainage falls and equipment access survive the final layout. As part of our turnkey solutions for villa, hospitality and office projects, we coordinate these adjacent items on the same drawings and the same shipment, which keeps one party accountable for the outdoor zone as a whole.
What a complete enquiry looks like
A specification-ready request for this model usually arrives with: the site plan and elevation showing the intended position; finished deck levels and finish build-up; access route photographs and measurements; the available supply at the unit location; the option list chosen from the catalogue; and the project's target installation window. With those inputs we can confirm the configuration, the included equipment and the electrical requirements, and move into production coordination.
Our custom and OEM service covers bespoke finishes and configurations where a project has a specific design intent, and logistics and door-to-door delivery handles the freight documentation for international sites. Installation support and after-sales service are arranged per project, with terms confirmed in writing for each order.
All dimensions, quantities and power figures quoted above are transcribed from the catalogue entry for WS-S06CT-L and describe that configuration. Confirm the final specification, included equipment and electrical requirements against your selected configuration before ordering. Site works must comply with the regulations applicable at the project location.