A swim spa that is eight metres long has to be decided in millimetres, not in mood boards. Before a deposit is paid on Outdoor Swim Spa WS-130AⅭ-U, the buyer is really placing an order for four separate things at once: a shell that has to clear gates, driveways and site boundaries; a set of pumps and controls that has to match the supply available on the property; water treatment that has to run unattended; and a delivery, crane or rigging plan plus a warranty route that works from another country. The questions below are the ones worth having answered in writing before the order is confirmed.

1. Does the length suit the site, or only the drawing?

The catalogue entry for this model lists 8000 × 3000 × 1400 mm. Treat those numbers as the starting point for a site check, not as clearance figures. Two measurements decide whether the order is workable: the access route from the delivery vehicle to the final position, and the finished footprint with working space around it.

  • Access: what is the narrowest point between the delivery vehicle and the final position — gate width, side setback, overhead wiring, a pergola beam? An eight-metre shell rarely turns on a tight suburban block, so ask what the delivery crew can actually reach.
  • Clearance: leave room at the equipment end for the pump and filter compartment to be opened, and room at one long side for a lid that lifts or slides. A spa that fits the deck but cannot be opened cannot be serviced.
  • Structure: who signs off the load path — the suspended deck, the slab thickness, the footing? On villas and rooftop terraces this is normally a local structural engineer's job, not the manufacturer's.

Ask the supplier to confirm whether the shell arrives as one piece or in sections for this configuration. That single answer changes the crane hire, the site access plan and often the price of installation more than any option on the specification sheet.

2. What is actually included in the base unit?

The same 8000 mm length appears across several variants of this range, and the difference between them is usually what sits inside the cabinet rather than the shape of the shell. In the published specification for WS-130AⅭ-U the swim training system is not listed, while other models in the series show it as an included feature. If your plan depends on swimming against a current every morning, that has to be settled before ordering, because a retrofit current unit is a different job from a factory-fitted one.

Request a line-by-line inclusions list for the exact model code on your quotation, and ask what is deliberately excluded. Jet counts, pump counts and light counts are easy to read off a page; what matters at handover is whether each item is fitted, wired and tested, or supplied loose in a crate.

3. Is the electrical supply on site enough, and who supplies it?

The specification for this model shows a total connected load of 11.85 kW, with four water pumps, one filter pump and five LED lights. That figure is the equipment load, not the whole installation: a heat pump added later, an automatic cover, or a longer cable run all change what the board has to carry.

  • Ask which supply voltage and phase the quoted unit is built for, and confirm it matches the property.
  • Ask for the recommended breaker rating, cable size and maximum run length from the main board.
  • Ask what the local electrician is responsible for, and get that boundary in writing before shipping.

If a heat pump or insulation package is under consideration, price it into the first order. Adding heating after the spa is set on its plinth usually means lifting the unit again.

4. How is the water kept clean with the least chemical work?

Ozone is listed as a feature on this model. That is a sanitising aid, not a replacement for filtration and periodic disinfection, and it is worth asking the supplier to describe the intended maintenance routine in plain terms: filter cycle length, how often the filter element is cleaned, what dosing is still expected, and what happens to the ozone generator when it reaches end of life.

Optional items catalogued for this range include UV sterilisation and sand filtration. Ask which options are compatible with this specific model code, how each one changes the running load, and what spare parts will be available in your country two or three years from now.

5. Who delivers it, sets it down, and answers later?

Ordering a swim spa from an overseas manufacturer is normal practice for villa and resort projects, but the delivery terms decide whether the process feels smooth or expensive. The service pages on this site describe Furniture Logistics and Door-to-door Delivery and Furniture Installation and After-sales Support. Confirm in writing, for your address specifically, what each of those covers: which port or kerb the unit lands at, whether the final lift onto the plinth is included, who inspects the goods on arrival, and how a claim is raised.

  • Ask which Incoterms apply to your quotation and what sits outside them.
  • Ask for the packing list and container plan before shipping, so you can check access on delivery day.
  • Ask how spares are sent — a jet, a pump or a control board that ships as a single parcel is very different from one that has to ride along with a full container.

Company-scale figures and service-response claims on supplier websites are marketing statements until they appear in your contract. Ask for the specific warranty period, what it excludes, and the named contact who handles after-sales for your order.

6. Can the specification be changed before production?

This model sits in a configurable range, so it is reasonable to ask what can still be altered after the order is placed: jet layout, cabinet finish, insulation package, steps, control placement, lighting colour. Ask when the drawing freezes and what a change costs after that point. If you are furnishing a whole property, it is usually cheaper to coordinate the swim spa with a Turnkey Villa Furnishing package — outdoor furniture, paving, loungers and shading — than to buy each element on its own schedule.

What the specification sheet states for WS-130AⅭ-U

ModelWS-130AⅭ-U
Catalogue dimensions8000 × 3000 × 1400 mm
Control system1 set
Water pumps4 pcs
Filter pump1 pc
Jet total23 pcs
LED lights5
Total power11.85 kW
Features shownWater jets, LED lighting, Ozone

Figures above are transcribed from the catalogue entry for this model and describe the standard configuration. The swim training system is not listed in the published specification for WS-130AⅭ-U; other models in the same 8000 mm series show it as a feature. Confirm included equipment, electrical requirements and available options for your configuration before ordering.

Take those six answers to a site meeting with the deck builder and the electrician present, and the quotation stops being a product purchase and becomes a buildable plan. Send the model code, your site photographs and the available supply details through the WS-130AⅭ-U product page, and ask for a written inclusions list against them.