A glass shelf quote rarely fails on price alone. It fails on the details that were never written down: which opening the shelf sits in, what it has to carry, how the glass is finished at the edges and how it will be fixed to the wall. If you are specifying Santerson Glass Shelves for a bathroom or another interior area, the request for quote (RFQ) is where those details get settled. The more specific your RFQ, the more comparable the prices you receive and the fewer surprises at installation.

Start with the room and the quantity

Before any dimension, state where the shelves are going and how many sets. This bathroom range is made to measure for each project, so a single villa bathroom, a guest suite repeated across floors and a full guest-room floor are quoted on different terms. Include:

  • The room or area, and whether the setting is residential, hospitality or commercial.
  • The number of shelves or shelf sets, and whether units must be identical across rooms.
  • The destination city and delivery terms you want quoted (for example door-to-door or port delivery).
  • Your target installation window, so production and freight can be planned around it.

Give the dimensions that actually matter

Made-to-measure sizing is standard on this range, so send measurements rather than a catalogue size. For each location we need the clear width and depth available, the finished shelf level or levels, and the height between shelves if you are stacking more than one. Note anything that interrupts the run: wall tiles with a relief edge, a mirror above the shelf, a vanity light, a towel rail, a shower screen, or a corner return. If the shelf must sit flush with a tile line or a niche, say so and mark it on the drawing.

A simple sketch per location, even a hand drawing with measurements photographed and attached, removes most of the back-and-forth.

State what the shelf has to carry

Load is the specification that changes the build. A shelf holding folded towels behaves differently from one carrying glass bottles, a ceramic basin-side tray or decorative stone objects. In your RFQ, describe the intended use and the heaviest single item you expect on the shelf, then ask us to confirm the glass specification and load limit for that use. Glass specification, load limits and installation requirements are confirmed per project on this collection, so treat them as items to be agreed in writing before order confirmation, not as fixed catalogue numbers.

If children or guests will lean on the shelves, or if the fitting is in a high-traffic hotel bathroom, mention it. That information affects both the glass build and the fixing method.

Specify the glass look and the edge details

Finish and layout can be specified to suit each space, so name them explicitly instead of leaving them to be matched later:

  • Glass look — clear, tinted or frosted — matched to the mirror and cabinet fronts in the room.
  • Edge treatment — polished, eased or shaped corners — and whether any cut-outs are needed for brackets or fixtures.
  • Bracket, support and fixing style, including the metal finish so it matches taps, frames and other ironmongery in the room.
  • Whether the shelf must coordinate with other items from the same fit-out, such as mirrored cabinets or shelving accessories already on your schedule.

Describe the wall and the installation conditions

Glass shelves are only as good as the substrate behind them. Tell us what the wall is made of — solid masonry, stud partition with lining, tiled substrate, or a panelled system — and whether there is insulation, waterproofing or concealed pipework behind the fixing line. Confirm who is installing on site: your contractor, or our team under installation and after-sales support. If you are ordering a wider fit-out from us as a one-stop furniture and building materials supplier, say which other items share that wall, because fixing points for shelves, cabinets and screens have to be coordinated before anything is drilled.

Ask for the same line items in the quotation

To compare quotes properly, ask every supplier to price the same breakdown. A useful quotation shows:

  • Unit price per shelf or set, with the confirmed size, glass build and finish written against each line.
  • Packaging and freight cost to your destination, plus the shipping method quoted — sea, air or rail — under logistics and door-to-door delivery.
  • Spare brackets, fixings and any replacement glass panel you may want held on site.
  • The lead time for production and the estimated transit time, stated separately.
  • What is covered after delivery and how a replacement panel is ordered if one is damaged on site.

Where you need non-standard sizes, finishes or branding, our custom and OEM service covers bespoke material finishes and textures as well as prototype work, so note these requirements in the RFQ rather than raising them after the order is placed.

A short checklist to paste into your enquiry

ItemWhat to write
Location and quantityRoom, setting type, number of shelves or sets, whether units repeat
DimensionsClear width, depth, shelf levels, spacing, obstructions, sketch attached
Load and useIntended contents, heaviest item, traffic level — then request confirmed glass specification and load limit
FinishGlass look (clear, tinted or frosted), edge treatment, cut-outs, bracket and metal finish
Wall and fixingSubstrate type, tiles or panelling, concealed services, who installs
Commercial termsDelivery destination and method, lead time, spares, after-sales scope

Send that information with your drawings and the specification can be confirmed before an order is placed, instead of being settled on site. For an enquiry on a current project, contact our team through the contact page and include the room schedule along with your measurements.