A flush hinged door looks finished only when the surface, edge and opening details are agreed in writing before production starts. Because these doors are made to measure for each project, the difference between a clean wall line and an awkward site problem usually comes down to what the buyer confirmed on the purchase order — not to what the installer managed to correct on the day.

Santerson Flush Hinged Doors sit within our Hinged Doors collection for residential door projects. Finish, layout and dimensions are specified per project, with made-to-measure sizing and a choice of material and finish options. That flexibility is the selling point, and it is also why the specification has to be precise. The checklist below covers what we ask buyers to sign off before a flush hinged door order enters production.

1. The surface finish itself

Painted, laminated or wood veneer — each behaves differently on site and each needs a different confirmation step. Painted surfaces depend heavily on the colour system used at our factory matching what your painter will work with on site, so we agree the colour reference rather than a descriptive name such as "off white". Veneered doors are graded by species, cut direction and grain layout; a wood veneer hinged door ordered without a note on grain direction can arrive with the grain running the wrong way relative to the adjacent joinery.

  • The exact colour or finish reference, quoted from a physical sample number rather than a screen preview.
  • Gloss level — matte, satin or high gloss — because sheen changes how visible fingerprints and wall scuffs are in a hallway.
  • For veneer: species, cut (plain or quarter), grain layout across the set, and whether the door leaf and the surrounding paneling must match an existing batch.
  • Which faces are finished. A door that meets a wall on one side still needs both faces specified if it can ever be opened against a different room.

2. Edge detail and how the leaf meets the wall

This is where flush doors earn their reputation, and where vague drawings cause the most rework. Confirm whether the leaf is required to sit proud of the wall face or recessed, and which direction it opens. Then confirm the reveal — the shadow gap between leaf and frame — and keep that dimension identical across every door on the floor plan, including doors from other collections.

  • Opening direction and hinge side for every single opening, marked on a door schedule rather than described in an email.
  • Whether the same finish wraps the edge of the leaf, or the edge is a contrasting material.
  • The gap width you expect around the leaf, and whether that gap continues through the frame or stops at it.
  • Handleless operation versus a recessed pull. If you want a clean face, say so early — the routing has to be built into the leaf, not cut on site.

3. Hardware to confirm with the door, not after it

Hinges, closers and locks change what the leaf can carry and where material has to be removed. Specify them together with the door so the pre-machining is done in the factory.

ItemWhat to confirm
HingesType, finish and load rating for the leaf height and weight you have specified; concealed hinges need to be named at order stage, not on site.
Lock and strikePrivacy, office or passage function; whether a strike plate is visible or concealed in the frame.
Closer or damperWhether one is required at all, and if so where it can be housed without breaking the flush line.
Handle or pullFinish, projection, and whether the leaf needs a routed pocket to keep the face flat.
Threshold and floor levelFinished floor levels for each opening, so the undercut and swing clearance are correct on the final floor covering.

4. Dimensions that must come from site, not from the drawing

Made-to-measure only works if the numbers are taken at the right moment. Opening widths and heights should be recorded after the floor screed, wall boards and final finishes are in place, or clearly noted as pre-finish dimensions with the build-up stated. We produce to the figures you confirm, so a door ordered against an unfinished opening will need site adjustment.

  • Width and height at three points each — top, middle, bottom — and report the actual variation rather than an average.
  • Wall build-up thickness at the opening, because it determines the frame detail and how the finish line closes.
  • Finished floor level relative to the sill line for every opening.
  • Whether adjacent openings are aligned to a common head height across a corridor.

5. Coordinating doors with the rest of the fit-out

Flush doors rarely stand alone. In villa and apartment work they are usually specified alongside wardrobes, wall paneling and skirting, and the visual quality depends on how those elements meet. Decide early whether the door finish continues into the panelling so the opening disappears, or whether it reads as a separate element.

If the goal is a wall that reads as one surface, look at flush wall aligned doors and flush interior doors in the same specification, and confirm that skirting stops at the frame rather than running across it. Where a corridor mixes collections — for example a hinged door next to a flush sliding door — put both on one schedule so the reveals and finishes match.

Ordering note: material, finish, dimensions and hardware for our doors are confirmed project by project. The specification you approve on the order is what we manufacture, so a signed door schedule with sample references attached prevents almost every dispute at handover.

6. What arrives on site, and how it is protected

Ask for the packing list to state leaf, frame, architrave or panel, and hardware as separate line items, so a shortage is obvious the day the container is opened. Doors should be packed flat or upright with edge protection, and stored flat in dry conditions before hanging — veneered and painted leaves are the ones most often damaged by standing wet plasterwork around them.

As part of our turnkey scope we handle production, packaging and container loading, door-to-door delivery, on-site installation and after-sales support. That means the same team can be given the door schedule at the start of a project and be accountable for how the openings look at handover.

Frequently asked questions

Can I order one flush hinged door as a sample before the full set?

Yes, and for larger projects it is a sensible step. A single leaf lets you check colour, sheen, edge detail and reveal against your own wall build-up before the remaining doors are scheduled.

Do you supply the frame and finishing details with the leaf?

The door set — leaf, frame and the relevant finishing detail — is specified together for each project. Confirm on the schedule which components are included for every opening so nothing is assumed at delivery.

What if my openings vary more than expected once plastering is done?

Send the measured variation with photographs before production. Small adjustments can be built into the frame detail; larger ones change the door size, and it is cheaper to change a drawing than to re-manufacture a leaf.

Confirm your finish details with us. Send your door schedule, opening measurements and finish references through our contact page, and our project team will return a specification for review before production begins. SANTERSON supplies doors, joinery and fit-out products for villa and apartment projects, with design coordination, custom/OEM manufacturing and door-to-door delivery handled under one scope.