A double basin countertop sits at the crossing point of three trades: joinery, stone and plumbing. That is exactly why a quote request for one often takes longer than it should. Send the wrong information and you get a price that later has to be rebuilt around new dimensions, a different basin type or a changed waste position. The checklist below shows what to send so the quotation for a Santerson Double Basin Countertop comes back usable the first time.
Start With the Room, Not the Product
The double basin countertop in our Countertops & Basins collection is made to the dimensions of the room it is going into. Finish, layout and size are specified per project rather than ordered from a fixed size list. Before any pricing conversation, send the measured wall length, the room drawings or as-built plans, and a photograph of the wall where the unit will sit, including the existing waste and water supply positions if this is a renovation.
Two bathrooms in the same development rarely share identical plumbing. Sending the plumbing position early avoids the most common rework: a countertop drilled for basins at one spacing while the wastes sit at another.
The Six Details That Decide the Price
| Detail to supply | Why it matters for the quotation |
|---|---|
| Overall length, depth and thickness | Sets the slab area, the substrate build-up and how the unit is supported at the join between basins. |
| Basin type | An undermount basin, an above-counter vessel basin and an integrated basin each need a different cut-out, edge profile and tap-hole arrangement. See Santerson Undermount Basin and Santerson Vessel Basin (Above Counter). |
| Basin spacing and clearance from each end | Drives tap-hole positions, mirror centring and the elbow room each user gets at the basin. |
| Stone or surface material and edge profile | Material choice and edge detail change both the unit price and how the piece is handled in transit. |
| Tap, waste and overflow specification | Hole count and diameter must match the mixers and wastes you intend to install. |
| Quantity and site location | Bulk quantities for an apartment or villa package price differently from a single piece, and destination sets the freight line in the quote. |
Countertop Only, or Vanity Unit As Well
Decide early whether you are quoting a countertop alone or the full vanity below it. A Santerson Double Vanity brings drawer configuration, door style and internal storage into the same drawing, while an Santerson Integrated Countertop Vanity merges the basin and top into one moulded surface, which removes drilling tolerance questions altogether. Specifying all of it in one enquiry lets us check heights, plinth depth and service clearances across the whole assembly instead of reconciling two separate orders later.
If the wider bathroom fit-out is still open, sending the tile schedule, mirror selection and lighting layout alongside the countertop enquiry gives a fuller picture. Our Interior Design Services cover space planning, furniture layouts and 3D renderings, so a drawing can be produced from your plans before anything is cut.
What We Send Back
- A quotation broken down by unit, material and any custom fabrication, so you can see what each line covers.
- A production drawing showing overall dimensions, basin centres, tap holes and cut-outs for your approval before manufacture begins.
- Confirmation of the finish samples you have selected, matched against the sample or reference you supplied.
- A freight option for the destination — sea, air or rail — with door-to-door delivery arranged through our logistics and door-to-door delivery service.
Where the design needs a bespoke size, material or branding treatment, it is handled through our custom and OEM service. Tell us the quantity band you are working to when you enquire, because minimum order quantities differ between a made-to-measure single piece and a repeat production run.
Checklist Before You Hit Send
- Room drawings or measured photographs of the installation wall
- Overall length, depth and required thickness
- Basin type and the exact basin model, if one is already chosen
- Basin centres from the wall and from each other
- Mixer and waste specification, including overflow requirement
- Material and edge profile, with a sample reference where possible
- Quantity per unit type and the delivery address or port
- Any on-site installation support you need at handover
Send us your drawings
Email your plans, dimensions and quantity to santerson@qq.com, or reach the team on WhatsApp at +86-13928214007. If you are sourcing the countertop as part of a villa or hotel fit-out, our turnkey project solutions cover design coordination, production, freight and installation under one point of contact.