Outdoor Swim Spa WS-115EⅩ-U is a long-shell swim and hydrotherapy unit in our configurable range, with catalog dimensions of 5280 × 2200 × 1250 mm. It is a sensible starting point for a villa terrace, resort deck or private training area. But when a project team puts it into the specification sheet, the real question is rarely whether this model works on its own. It is what sits beside it: a shorter unit with different pump and lighting counts, a longer hydrotherapy-and-relaxation layout, or a spa shaped to an awkward corner. This article sets out how we compare those options and which questions decide the choice.
What WS-115EⅩ-U actually gives you
The Outdoor Swim Spa WS-115EⅩ-U is listed at 5280 × 2200 × 1250 mm, with a jet total of 24 pieces, two water pumps and one filter pump, two LED lights, one control system and a catalog total power figure of 9.65 kW. The features shown on the page are water jets, LED lighting and ozone.
Read those numbers as catalog figures for the standard configuration, not as a fixed specification. Equipment count and electrical load change with the options you select, and the site lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as optional accessories. Availability and compatibility vary by model, so the configuration we quote is always confirmed line by line before production.
Two close alternatives in the same series
The fastest way to judge an alternative is to compare like with like. Within the 115 series, two models sit either side of the EⅩ-U and show how much one shell length can shift the equipment package.
| Item | WS-115EⅩ-U | WS-115AⅩ-U | WS-115FⅩ |
|---|---|---|---|
| Catalog dimensions (mm) | 5280 × 2200 × 1250 | 3880 × 2200 × 1250 | 5000 × 2200 × 1250 |
| Jet total | 24 pcs | 23 pcs | 24 pcs |
| Water pump | 3 pcs | 4 pcs | 1 pc |
| Filter pump | 1 pc | 1 pc | 1 pc |
| LED lights | 2 pcs | 1 pc | 4 pcs |
| Swim training system | Not listed | Not listed | 1 set |
| Total power (catalog) | 9.65 kW | 11.85 kW | 8.05 kW |
| Features shown | Water jets, LED lighting, Ozone | Water jets, LED lighting, Ozone | Water jets, LED lighting, Ozone, Swim training system |
The shorter WS-115AⅩ-U loses roughly 1.4 m of shell, and its catalog power figure is higher than the longer EⅩ-U because the pump count differs. That is the trap in cross-model comparison: a bigger unit is not automatically the heavier electrical load, and a smaller footprint does not automatically mean a simpler plant room. The WS-115FⅩ sits between the two in length, shows four LED lights and lists a swim training system as part of its shown features.
Model suffixes also matter. In this series the same base model appears with and without an extra character, and the equipment shown differs between them — the FⅩ listing above includes a swim training system, while the AⅩ-U listing does not. When you request a quotation, name the full model code exactly as it appears on the page.
When to look beyond the standard rectangular shell
Two other product directions are worth putting in front of the client when the site condition or the programme is unusual:
- A long swim channel plus a separate relaxation area. The Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool pairs an extended swimming channel with a dedicated hydrotherapy zone, which suits clients who want lap-style exercise and seated jet therapy in one installation rather than choosing between them.
- A shaped shell instead of a rectangular one. The Customizable Shape Outdoor Spa supports square, round, oval and curved forms in an acrylic shell with structural reinforcement. This is the route when the terrace has a curved edge, a column in the way, or a design language that a rectangular box would break.
For category-level comparison, the Swimming Pools and Swim Spas section lists the full range side by side, which is usually where a specifier starts before narrowing to two or three candidates.
The questions that settle the decision
- Deck load and access. A filled shell of this size is a structural conversation with the engineer, not just a purchase. Confirm the deck or slab can carry it, and confirm the delivery route and lifting method to the terrace before production starts.
- Electrical supply. The catalog power figure is a starting point for the electrical design. Confirm supply capacity, protection and the routing of cables with your electrician against the confirmed configuration, not against a catalogue page.
- Which options are in scope. Heat pump, insulation, UV sterilisation, sand filtration and steps each change both price and plant space. Decide them before ordering so the quotation and the site preparation match.
- Who installs and who maintains. Our service covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover — alongside freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, and door-to-door delivery. Warranty terms, response times and local installer arrangements should be confirmed for your specific project rather than assumed from marketing copy.
- What else is on the same order. A swim spa rarely arrives alone. Poolside outdoor furniture — loungers, dining sets and pergolas in aluminium frames, rope weave and wicker — can be specified from the same range, coordinated by one supplier.
Send us the model code you are considering, the site photos and the dimensions you are working with, and we will put a written configuration — equipment list, options and power requirement — in front of you for comparison. As a China-based manufacturer of furniture and building materials serving villa, hospitality and office projects, SANTERSON supplies the swim spa alongside the rest of the outdoor and interior package.
WhatsApp / phone +86-13928214007 (PHILLIP) · santerson@qq.com