An enquiry for a swim spa often arrives with a single sentence: "please quote the WS-SP600." A responsible manufacturer cannot price that shell on its own. Two identical cabinets can carry different pump sets, different sanitation options and very different freight arrangements, and the difference lands in the quotation. Below is the information our engineering and sales team works from when an outdoor swim spa enquiry comes in, written so that a purchaser, builder or project manager can send one complete message instead of five rounds of email.

Start with the site dimensions, not the model number

The catalogue entry for this model lists a cabinet of 5900 × 2500 × 1600 mm. Those figures tell you what leaves the factory; they do not tell you whether it fits your site. Tell us the clear opening you have to work with — the width of the side gate or driveway, the turning radius at the corner, and the finished level of the pad where the spa will sit. A unit that clears a 2500 mm doorway in plan view may still fail to make the right-angle turn beside an existing wall.

Send us a simple sketch or a set of site photographs with dimensions marked on them, and say whether the spa is going onto an existing slab, a new pad, a terrace deck or a recessed pit. Recessed and semi-recessed installations change both the access panels you need and how the plant is reached for servicing.

Tell us how the spa will be used

The same footprint serves very different purposes, and purpose drives equipment. A villa owner who wants daily lap swimming needs the swim training system running at a comfortable current for their height and stroke. A hotel or resort spa pool is judged on jet layout, seating depth and how many bathers share the water at once. A rehabilitation or hydrotherapy application puts the emphasis on water temperature stability and on where jets are positioned relative to the seated position.

  • Private residence, resort, gym, clinic or development amenity
  • Expected daily bather load, and whether children or older users are regular swimmers
  • Primary use: lap swimming, hydrotherapy massage, or a mixed swim-and-spa arrangement
  • Whether the water will be used year-round or seasonally

This matters commercially as much as technically. A shared amenity pool usually needs a larger filtration duty cycle and a more robust sanitation option than a family spa used by two people.

Confirm the equipment package line by line

The captured specification for WS-SP600 shows a control system, a swim training system, one filter pump, six jets, four LED lights and a total power figure of 9.35 kW, with water jets, LED lighting, ozone and the swim training system listed as the features shown for this configuration. The water pump is not listed in that captured specification for this model, which is exactly why we ask before quoting rather than assuming.

Item to confirmWhy it changes the price
Control systemInterface type and number of control points set the cabinet wiring scope.
Swim training systemCurrent output determines pump sizing for genuine lap swimming.
Water pump and filter pumpFiltration duty cycle depends on water volume and bather load.
Jet count and layoutThe catalogue figure of six jets is a baseline; jet zones are reconfigured for therapy or massage use.
LED lightingNumber, colour control and whether lighting is zoned.
Ozone and optional UV sterilisationSanitation package, and a common requirement for commercial pools.
Heat pump and insulationRunning cost and how the spa behaves in cool or cold climates.
Sand filtrationAlternative to cartridge filtration; changes plant space and maintenance.
Steps and accessEntry style, and whether it is fixed or integrated into the deck.

If you are comparing our quotation against another supplier's, check that both quotations describe the same package. A lower price frequently reflects a smaller pump, fewer jets or a sanitation option left out rather than a better deal on the shell.

Send the electrical and services information early

Electrical mismatch is the most common cause of delay on this product category. Please provide:

  • Supply voltage, phase and frequency at the installation point — single-phase or three-phase
  • The available breaker size and the distance from the main distribution board to the spa
  • Whether a dedicated circuit can be run, and who is responsible for that run in your contract
  • Local requirements for protective devices and earthing, as set by your own licensed electrician or authority
  • Water supply, drainage route and whether any water softening or iron removal is present on site

The catalogue power figure applies to the configuration it was recorded against. Once options are added or removed, we restate the load for the actual build and issue the wiring requirement with your quotation, so the electrician works from the same numbers as the factory.

Specify finish, colour and any custom work

Where a project calls for a shape or cabinet detail outside the standard catalogue — a curved spa pool, a different shell colour, or a cabinet cladding that matches surrounding decking or wall finishes — send us the reference images, the finish sample or the drawing you are working to. Our custom and OEM service covers bespoke finishes and configuration changes, and we will tell you plainly which requests are straightforward and which would compromise the structure or the plant access.

If the spa is part of a wider package — poolside loungers, a pergola or shade structure, outdoor dining, cabinetry for an adjacent changing room — say so in the first message. Coordinating finishes across the outdoor area is far easier while everything is still on paper, and it is one reason buyers use a one-stop furniture and building materials supplier rather than sourcing each element separately.

Set out delivery, access and responsibility

A swim spa is bulky freight, so the logistics questions belong in the enquiry, not after production. We arrange sea, air and rail freight with customs paperwork and door-to-door delivery through our logistics service, but the quotation depends on:

  • Destination port or city, and whether delivery goes to site or to a warehouse
  • Your preferred Incoterms, and who is acting as importer of record
  • Crane, forklift or manual carry needed at the arrival point, and clear height restrictions on site
  • Any storage arrangements if the building is not ready when the spa arrives

Import duty rates, local electrical code and pool safety requirements are set by the destination jurisdiction. We work to them as advised by your local consultants; we do not certify compliance on their behalf, and we recommend you confirm those obligations with a licensed local professional before ordering.

What a complete enquiry looks like

A usable message for this model usually contains: the site sketch with clear access dimensions and pad level; intended use and daily bather load; the equipment items you want confirmed or changed against the catalogue configuration; voltage, phase and available breaker size; finish or customisation references; destination city, preferred Incoterms and arrival arrangements; and your target date for the spa to be in the water. With those six blocks we can return a specification sheet and a priced quotation without another round of questions.

Before you send an enquiry, decide which one requirement is non-negotiable — the swim current, the jet layout or the installation footprint. That single answer shapes the rest of the package and keeps the quotation comparable with any alternative you are evaluating.
Send your requirements for a written specification and quotationSANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, covering design consultation, custom and OEM production, freight and door-to-door delivery, installation support and after-sales service. Share your site dimensions, intended use and electrical details, and we will confirm the equipment package and price for the configuration you need.