A design brief for a hotel or apartment kitchen usually arrives as a mood board, a set of door elevations and a colour code. What it rarely contains is the information a factory needs to build cabinetry that fits the room, survives guest use and arrives on site in the right sequence. Turning that brief into custom built-in kitchen cabinets that can actually be quoted, produced and installed is a documentation task before it is a manufacturing task — and it decides whether the enquiry you send comes back with a usable price or a string of questions.
SANTERSON has supplied furniture and building materials to project clients since 2008, and kitchen cabinetry sits within our interior fixtures range alongside wardrobes, vanities, wall panelling and doors. The enquiries that move fastest share the same structure. Below is the information set we work from on hotel and apartment cabinetry packages, and what each item changes on the production side.
1. Fix the scope before the finish
A brief that says "kitchen cabinets, white gloss, 60 apartments" cannot be quoted. What can be quoted is a set of unit types repeated across a defined number of rooms, with the interfaces to walls, floors and appliances resolved. For each room type in the project, send:
- A dimensioned layout — overall wall lengths, ceiling height, positions of doors, windows, risers, sockets and any existing services that cannot move.
- Unit breakdown per room: base units, wall units, tall units, corner treatment, island or breakfast bar if applicable.
- Appliance schedule with model references and cut-out dimensions, including built-in ovens, hobs, extractors, dishwashers and refrigerators.
- Room count per type. Repeat quantity is what makes a project price, not the design itself.
If your drawings are still at concept stage, say so. Our design team works from space planning through to production coordination, and an early package lets us flag dimension conflicts while they are still cheap to change rather than after tooling.
2. Specify the cabinet box, not only the door
Design briefs describe doors; factories build carcasses. Two kitchens that look identical in a rendering can differ substantially once panel type, edge treatment and load-bearing shelf spans are set. Our built-in cabinetry is supplied with customisable sizes, panel materials and surface finishes, together with matching hardware — hinges, drawer slide rails, support legs and connecting brackets — so the specification should state:
| Specification point | Why it matters for a project order |
|---|---|
| Door style | Flat panel, handleless, shaker and veneer options are all in our range; the profile affects cost, cleaning and how the kitchen reads against the rest of the interior joinery. |
| Surface finish | Matte, high gloss, acrylic, lacquer, melamine and wood veneer behave differently under hotel lighting and under frequent cleaning. Specify sheen and colour reference, ideally with a physical sample approval step. |
| Panel and edge | Panel choice and edge banding determine how the units hold up in humid kitchen zones and how edges look after years of guest or tenant use. |
| Hardware grade | Hinge and runner quality is the main driver of service calls in rental and hotel kitchens. Matching hardware is available on request, so state whether soft-close, push-open or standard fittings are required. |
| Internal layout | Drawer-focused storage, pull-out corner units, tall pantry cabinets and integrated appliance cabinets change both price and installation time. Decide per room type rather than project-wide. |
3. Match the cabinetry to the rest of the joinery package
In apartment and hotel work, kitchen cabinets are rarely ordered alone. The same wall planes continue into wardrobes, vanities, media walls and concealed doors, and a colour that reads correctly on a cabinet door can look different on a full-height wardrobe panel in the same corridor light. Ordering cabinetry together with the surrounding interior fixtures keeps veneer matching, finish batches and delivery sequence under one coordination process. Our project work includes full-house custom cabinetry and built-in storage packages, where wall units, wardrobes and vanity tops are produced against one set of approved samples.
4. Set the delivery and installation logic in the enquiry
Cabinetry that arrives complete but out of sequence becomes storage cost on site. State in the enquiry:
- Destination port or site address, and whether you need door-to-door delivery or port-only terms.
- Phasing — by building, floor, block or room type — if handover is staged.
- Container loading preference and any site access limits on package size, which affect how units are packed flat or assembled.
- Whether installation support is required. We provide on-site guidance, inspection and snag resolution as part of project delivery, and details can be confirmed for your specific site before order.
We handle freight by sea, air and rail with the associated customs documentation, so an enquiry that includes your destination and target programme dates allows us to propose a realistic production and shipping sequence rather than a generic lead time.
5. What a complete enquiry looks like
Where the brief is still open, our Custom & OEM Service covers design development, prototyping and material selection from wood, metals, engineered stone and laminates, which is often the faster route for a first kitchen concept on a new apartment or hospitality scheme.
Send your cabinetry drawings for a project quotation
SANTERSON — furniture and building materials manufacturer, one-stop project supplier. Send layouts, room counts and finish references and we will return an itemised price with production drawings for approval.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiry page: https://www.santerson.com/contact/