A request for quote that only lists a product name and a quantity usually comes back with a price that does not match the site. For Santerson Decorative Fixtures, which are made to the dimensions, finish and layout of each project, the specification you send is what determines whether the quotation is comparable across suppliers and whether production can start without a second round of questions. The checklist below covers what a purchasing officer or contractor should put in writing before asking for a price.

1. The fixture type and where it will be installed

State the item by its catalogue name and, if you have already shortlisted one, link to it: wall sconces, vanity lighting, or towel warmers and rails are configured differently, so a single line such as "bathroom accessories, 40 lots" cannot be quoted accurately. Then say which room or zone each fixture serves, and whether the fitting sits inside a wet area, next to a basin, or in a dry part of the bathroom. That information drives the electrical specification and the fixing detail before production can be confirmed.

2. Dimensions and interface conditions

These products are supplied to project-specific sizes, so send measured dimensions rather than a standard size you hope will fit. For each fixture type include:

  • overall width, height and projection, plus the clear opening or panel size if the fitting is recessed
  • the substrate it fixes to — tiled wall, plasterboard, timber battening, stone or a vanity carcass — and the finished wall line after tiling
  • where services terminate: cable outlet position, water supply and waste positions for any item that connects to plumbing
  • clearance needed for doors, drawers, mirror cabinets and vanity tops to open without fouling the fitting

If a fixture has to coordinate with joinery from the same custom furniture and interior products manufacturer, say so in the same RFQ. Integrated cabinet lighting is built into the carcass, so its driver location, cable route and switch position have to be resolved together with the cabinet drawing, not after both orders are placed.

3. Finish, material and matching schedule

Give the finish by name and by sample reference, and list every item that has to match: tapware, mirror frames, cabinet handles, profiles and other metalwork on the same floor. Where a project uses several bathroom typologies, provide a finish schedule that ties each fixture code to one room type. A finish described only as "gold" or "matte black" invites substitution; a reference from your approved sample board does not.

4. Technical and compliance information you must supply

We quote to the specification you confirm, so send the technical conditions instead of asking us to assume them:

  • supply voltage and frequency for the destination country, and whether drivers or transformers are included or supplied locally
  • switching and control method — wall switch, dimmer, motion sensor or a building control system — and where the control device sits
  • lamp or module requirement if your specifier has fixed one, including colour temperature and any output level from the lighting schedule
  • the local electrical and plumbing requirements that apply to the installation, which your local engineer or installer confirms. We do not certify a fitting as compliant with a code we have not been given; state the standard you need it assessed against.

5. Quantities, room breakdown and phasing

Send quantities by room type and by building block, not one total for the whole project. A villa renovation of four bathrooms and a hotel floor with twenty identical ones are quoted and packed differently. If delivery has to follow construction sequence, set out the phases with dates and the quantities per phase, so production and packing can be planned around them.

6. Packaging, delivery terms and destination

Include the delivery address, the port or site, and the Incoterms you want priced — FOB, CIF or door-to-door. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail together with customs paperwork such as commercial invoices, packing lists and certificates of origin, but duties, import conditions and final-site access are specific to each destination and should be confirmed for your project. Also state packaging requirements from your principal contractor: individual cartons labelled by room number, protective crating for glass items, or consolidated pallets for a container you are sharing with other trades.

7. Drawings, schedules and supporting documents to attach

  • reflected ceiling and elevations showing each fixture position, dimensioned from fixed lines
  • the room schedule or bill of quantities that the quotation has to answer line by line
  • finish sample references or approved photographs of what was signed off at mock-up
  • for integrated items, the carcass or joinery drawings they attach to
  • your company name, project name, contact person and the date the quotation is required by

8. What a complete specification gets you back

When the RFQ carries fixture type, dimensions, interface conditions, finish references, electrical and plumbing requirements, phased quantities and delivery terms, the reply can be compared supplier to supplier on the same basis. As part of our custom and OEM service, we produce these items to the confirmed drawing and finish schedule, and as a one-stop furniture and building materials supplier we can carry the fixtures alongside the vanities, cabinetry, wall panels and sanitaryware for the same bathrooms, which removes duplicated measurement between separate orders. Where a project needs it, our installation and after-sales support covers on-site fitting, inspection and snags; warranty terms and response times should be confirmed in writing for your project rather than assumed.

Before you send it

Read the RFQ against one question: could a factory start production from this document without asking what we meant? For decorative fixtures, where almost every dimension and finish is chosen per project, that single test decides whether you receive a firm price or an estimate that changes when the first drawing query comes back.