High gloss sliding door wardrobes look simple on a drawing: two shiny panels that slide past each other. The quotation, however, is where projects go wrong. Two enquiries with the same room dimension can produce very different prices and very different results, because almost every part of the unit is selectable. Before you ask for a firm price, it helps to know which decisions actually belong to you as the buyer and which ones the factory needs from your drawings.
1. Door finish: gloss level, colour and how the panel is made
Start with what you can see. Within our catalogue the sliding format is offered in several surface families, and each one behaves differently once it is installed under bedroom lighting: High Gloss Sliding Door Wardrobes for a plain reflective panel, Mirror Sliding Door Wardrobes where one or both panels are mirrored, and Two Tone Sliding Door Wardrobes when you want to break up a wide run of doors. If the same gloss look also appears on the kitchen or vanity in the same project, tell us early - matching a wardrobe panel to a cabinet door across two product families is a specification decision, not something to fix on site.
For colour, send a reference rather than a name. A paint code, a sample chip, or a photograph of an existing surface all give us something to work against; a word such as "white" does not. Where an exact match matters, we confirm the sample before production runs.
2. Carcase material and interior layout
The doors get the attention, but the carcase decides how long the unit lasts and how much you can store. Tell us which substrate and board thickness you want specified in writing, and what the interior is for: hanging rails only, a mix of shelves and drawers, a section for luggage, or space reserved for an ironing board or safe. Our Combination Modular Wardrobes approach is useful here - it lets you split a long wall into zones with different internal depths and shelf heights instead of forcing one layout across the whole run.
Send your storage inventory with the enquiry: how many metres of short hanging, how many of long hanging, how many drawers per person, and whether anything oversized needs to fit. That single list changes shelf positions far more than any style choice does.
3. Sliding hardware and the wall it hangs from
Sliding wardrobes fail on three things: track quality, panel weight, and a wall that is not square. When you brief us, give the finished floor level and the finished ceiling height, not the structural dimensions, and say what the floor covering is - tile, engineered timber, carpet - because the bottom track sits on top of it. Flag any skirting, bulkhead, air-conditioning duct or light cove that the door has to clear.
Then state the panel weight you are expecting. A full-height mirrored panel and a full-height gloss panel load the runners very differently, and the track, hangers and buffers should be chosen for the heavier case. We also need to know whether the wall can take a top-fixed track; if it cannot, say so in the first message and we will design around a floor-supported solution instead.
4. Sizes, tolerances and site conditions
These units are made to measure, so the dimension sheet matters more than the finish sheet. For each opening send width, height and depth at three points along each direction - out-of-square walls are common and a single measurement hides the problem. Note obstructions, electrical sockets, switches and any skirting you want removed rather than scribed around.
Decide now whether the unit runs floor-to-ceiling or stops below an existing cornice. That decision affects the reveal, the track housing and how the installer finishes the top edge, and changing it after production starts is expensive.
5. Customisation beyond the standard range
If your project needs something outside the published options - a bespoke handle profile, an integrated lighting channel, a curved end return, or a finish that matches joinery elsewhere in the building - raise it during enquiry rather than after the drawing is signed off. Our Custom Furniture Design and Prototyping service covers bespoke material finishes and textures, prototyping before series production, and OEM or private-label work for developers who are fitting out several units to the same detail.
6. Documentation, packing and handover
Finally, agree on paperwork. Confirm which drawing revision is the production reference, how panels are labelled and packed so the right door goes to the right bedroom, and who inspects on site. Our Furniture Installation and After-sales Support covers installation, inspection and snag lists, so decide in advance what counts as a completed wardrobe: doors aligned and running freely, soft-close functioning, no edge damage.
A short checklist for your next enquiry
- Finished floor and ceiling heights, plus width/height/depth measured at three points
- Door finish family and a physical colour reference, not just a colour name
- Carcase substrate and edge treatment stated in writing
- Storage inventory: hanging metres, drawers, oversized items
- Panel weight expectation and whether the wall can carry a top track
- Obstructions: skirting, bulkheads, ducts, sockets, cornices
- Named drawing revision as the production reference
- Agreed snag criteria for handover
Bring those eight items to us and the quotation you receive will be comparable line by line - with your other suppliers, and against your own budget. Send the drawings and the storage list first; the finish conversation is much shorter once the numbers are fixed.