A rendered image of a wardrobe tells you almost nothing you need to decide. What decides it is a physical sample and a written proposal that states, in plain words, what the doors are made of, how the carcass carries them, how the glass is edged and hung, and what has been left out of the price. If you are specifying Glass & Acrylic Combination Wardrobes for a villa or apartment package, the comparison exercise below is the one worth insisting on before you place an order.
What you are actually comparing
A combination wardrobe mixes two door families in one run: acrylic panels, usually in a high-gloss or matte finish, and glazed doors — clear, frosted, bronze or smoked — set into a frame. The visual logic is easy to read. The commercial risk sits underneath it, because the two materials behave differently on site and are quoted on different assumptions.
Acrylic reads as a flat, deep colour with a reflective surface. It is unforgiving of a poor substrate and of an edge that does not sit flush. Glass shows everything behind it and depends on the frame section, the hinge geometry and the clearance between leaves. Two quotations can look identical in a rendering and differ by a whole door system.
Step 1: Request samples that match your specification, not the brochure
Ask each supplier for a sample set built to the finish you have actually specified. A generic acrylic chip from a colour card is not evidence of what will be delivered.
- A full acrylic sample showing the face, the edge treatment and the substrate behind it — not an offcut mounted on board.
- The glass you have chosen, in the selected tint, with the actual edge finish and any surface treatment.
- The frame or profile section used for the glazed leaves, cut so you can see wall thickness and how the glass sits in the rebate.
- Hardware as quoted: hinges, handles or handleless profiles, soft-close fittings, and any integrated lighting fitting shown on the drawing.
Mark each sample with the supplier name, the quoted finish code and the date. Within a week you will know which of them matches your drawings and which is a decorative substitute.
Step 2: Put both quotations on one comparison sheet
Rebuild every proposal into the same table before you read the prices. Differences that disappear in a formatted PDF become obvious in a row-by-row sheet.
| Line to compare | What a complete answer looks like | What a vague answer usually hides |
|---|---|---|
| Carcass board and thickness | Named board type, thickness, grade and edge sealing on visible surfaces. | A board described only as "standard panel" — substitution risk at production. |
| Door construction | Whether the acrylic leaf is a single pressed panel or a post-formed edge; how the glazed leaf is assembled. | Two suppliers quoting different door builds at the same price per linear metre. |
| Glass specification | Tint, thickness, tempering status, edgework and how the leaf is retained. | "Glass door" only — cost moved to a variation later. |
| Furniture and internals | Drawer boxes, shelf spans, hanging rails, tall units and any integrated lighting itemised separately. | A single "internals included" line with no quantities. |
| Finishes on show | Frame colour, handle or profile finish, hardware brand or model reference. | Colour names that match no sample you hold. |
| Site conditions excluded | Wall flatness, floor level, skirting removal, electrical first-fix for lighting. | Assumptions buried in small print until installation day. |
Step 3: Read the drawing before the price
A proposal without a dimensioned elevation is not comparable. Ask for room-by-room elevations, with overall width and height per unit, door lay and opening direction, drawer stack heights, shelf positions and any recess or return.
- Check that glazed and acrylic leaves appear in the same run at the same height — a mismatch of a few millimetres across a mixed run stays visible for years.
- Check clearance where doors meet a wall, a corner or an adjacent unit, especially on hinged combinations.
- Check that lighting positions are drawn against the internals, not added later as an accessory line.
Made-to-measure work is only as good as the survey behind it. If one supplier quotes from your plan alone and another has taken site dimensions, you are comparing two different scopes — the second quotation may be higher and still cheaper overall.
Step 4: Test how each supplier handles a change
Change one thing deliberately — swap two acrylic leaves for glazed leaves, or move a drawer stack — and ask both suppliers to reissue. Their response tells you more than their opening price.
- Does the revised quotation arrive with updated drawings, or only a new number?
- Is the change priced transparently, so you can see what the glass leaf costs against the acrylic leaf?
- Do they flag the consequence — a longer production window, different hardware, a minimum order on a special finish?
Combination wardrobes are almost never ordered exactly as first drawn. A supplier who handles revisions cleanly saves more than the gap between two opening prices.
Step 5: Check packaging, delivery and installation scope
Glazed leaves travel badly if they are packed like panels. Ask how the glass is crated, whether leaves ship loose or pre-hung, and who carries the risk of transit damage.
- Packaging method for glazed leaves, and the process if a leaf arrives damaged.
- Whether panels are labelled per room and per unit so the run can be assembled in sequence.
- Who installs, who inspects after installation, and what is signed off at handover.
If your project is overseas, this section also covers freight mode, customs paperwork and delivery to the site door. Confirm each item in writing for your specific project rather than relying on general service descriptions.
A practical comparison checklist
- Samples received to the specified finish, with edge and substrate visible.
- Glass tint, thickness and edgework named on both quotations.
- Carcass board type, grade and thickness stated.
- Dimensioned elevations attached, door lay and internals drawn.
- Hardware specified by model, including soft-close and any integrated lighting.
- Excluded site works listed explicitly.
- Packaging method for glazed leaves described.
- Delivery scope, installation responsibility and handover inspection defined.
- Revision pricing available on request, itemised by leaf type.
Product configurations, dimensions and finishes are specified per project. Confirm the exact specification, materials and applicable terms for your own project before ordering; nothing in this article is a guarantee of performance, compliance or delivery time.
Send us the room elevations and the finish you are specifying, and we will return a quotation with drawings, a sample list and an itemised breakdown by door type.
Contact PHILLIP · Email santerson@qq.com · Phone/WhatsApp +86-13928214007 · Contact page