A sliding panel TV wall looks simple on a drawing: two or three panels on a track, a screen behind them, and a clean finished surface in front. In a hotel lobby, a serviced-apartment show suite or a corporate lounge, it is one of the hardest built-in elements to coordinate, because the panels have to travel over an opening that also carries power, signal cabling, ventilation and sometimes a fireplace surround. When buyers search for suppliers of Santerson Sliding Panel TV Systems, they are usually comparing something much broader than a product code — they are comparing how a factory handles made-to-measure wall systems, and how much of the coordination they are willing to take off your team.

This guide sets out what to ask, what evidence to expect back, and where quotations for the same wall can differ by a wide margin. It is written for procurement managers, contractors and interior practices specifying media walls for commercial work.

1. Confirm you are comparing the same system

The Media & TV Walls range contains several configurations that are easy to confuse in a bill of quantities. Sliding panel systems sit alongside Santerson Integrated TV Panels, where the screen is fixed within a decorative panel, and Santerson Full Height Media Walls, which run floor to ceiling with storage. Where the wall must also close off storage rather than only a screen, Santerson Sliding Storage Panels in the Integrated Storage Walls range is usually the closer starting point.

Before comparing prices, put each quotation against the same three questions:

  • Does the supplier quote the panel face only, or the full assembly — subframe, track, hangers, bump stops, skirting return and any recess for the screen?
  • Is the opening behind the panels dimensioned around your actual screen size, including its bracket projection and the clearance needed for service access?
  • Are finishes quoted as a named material and colour from an approved sample, or described generically as "wood veneer" or "matte lacquer"?

Two quotations that look identical on a line item often differ in exactly these three places. Ask for the assembly to be drawn, not just listed.

2. Check how far the specification can actually be changed

Configurable wall systems are sold on flexibility, but flexibility has limits that matter in commercial work. The product pages for these systems state that finish, layout and dimensions can be specified to suit each space, with made-to-measure sizing available — which is the baseline you should expect from any supplier handling this category.

What separates one supplier from another is what happens at the edges of that flexibility:

  • Non-standard heights and rebates. Hotel ceilings rarely match a catalogue module. Ask whether an odd ceiling height changes only the price, or pushes the item into a different product family with different hardware.
  • Mixed materials on one wall. A lobby wall may combine a panelled section with stone or marble surfaces. Confirm that one supplier can produce and finish both, so the joints land in one workshop rather than on site between two trades.
  • Integrated services. Lighting inside display niches, cable routes behind the screen, and remote-control access all have to be resolved before panels are made. Ask which of these the supplier coordinates in-house and which stay with your electrical contractor.

SANTERSON works as a one-stop furniture and building materials supplier, so wall systems are produced alongside the joinery, panelling, doors and finishes that surround them. For a single feature wall that matters less; across a floor of guest rooms or a suite of meeting rooms, sourcing built-in elements from one factory reduces the number of parties arguing over tolerances on site.

3. Ask for the drawings and the sample, not the brochure

A supplier handling made-to-measure work should be able to show three things before you commit: a dimensioned elevation of your wall, a section through the track showing how the panel hangs and where the reveal falls, and a physical finish sample. If only rendered images are offered, treat the quotation as provisional.

Useful evidence to request:

  • Shop drawings issued for your approval, with panel dimensions, opening sequence and hardware noted on the drawing itself.
  • A written confirmation of the substrate behind each finish, since commercial panels are handled far more than domestic ones.
  • Hardware make and load rating for the hangers and track, matched to the weight of the finished panel rather than stated in general terms.
  • Photographs or case references of comparable walls already delivered — SANTERSON publishes project work at its project cases pages, including villa and hospitality fit-outs in Australia.

Do not accept performance claims you cannot trace. Acoustic separation, fire rating and hardware cycle life are frequently quoted loosely for sliding wall products; if these matter for your building, require test documentation for the exact configuration being supplied, or specify them yourself and ask the supplier to confirm compliance.

4. Compare the coordination, not just the unit rate

Imported joinery fails on site in predictable ways: panels arrive before the screed is dry, the recess is set out 15 mm out of square, or nobody told the electrician where the screen sits. The supplier's workflow is therefore part of the price.

SANTERSON describes a six-stage route for project work — consultation, design and planning, production, logistics, installation and after-sales — with custom & OEM service covering bespoke finishes and prototyping, and logistics and door-to-door delivery covering freight, packaging and container loading. Ask any supplier you are comparing to state the same stages in writing, and to answer four specific questions:

  • Who takes final site dimensions, and at what point in the programme? Re-measure after wall finishes are set, not from architectural drawings alone.
  • Which party is responsible for the subframe and for setting out the opening?
  • How are panels packed and numbered, and is there a marked installation sequence for the crew?
  • What happens if a panel is damaged in transit — replacement lead time, and who covers fitting costs?

Answers given as "we will support you" are worth nothing. Ask for names, stages and lead times, and put them into the purchase order.

5. Watch the specification traps that inflate variation orders

  • Screen not fixed at order stage. Panel heights and the position of any handle cut-out depend on the screen and bracket. Lock this before production.
  • Track detail unresolved. Recessed, surface-mounted and ceiling-fixed tracks give different reveals and different floor finishes around them. Decide with the flooring supplier in the same meeting.
  • Finish mismatch across batches. Veneer and textured laminates vary between production runs. Order a full wall, plus a spare panel, from one batch.
  • Access left out. Behind-panel equipment still needs servicing. Specify which panels are removable and how.

Putting it together

Comparing suppliers of sliding panel TV systems is mostly an exercise in normalising the quotation: same assembly, same hardware, same finish reference, same site responsibilities. Once the scope matches, the difference between factories shows up in whether they draw the wall before making it, and whether they coordinate the surrounding joinery or leave you to stitch three trades together.

For a project enquiry, send the elevation, the screen schedule and your finish preference, and ask for a dimensioned shop drawing with the hardware schedule attached. SANTERSON can be contacted directly through the contact page, and enquiries are handled by the project team.

Product dimensions, panel materials, track hardware and electrical provisions for these configurable systems are confirmed per project; final specifications should be verified against approved shop drawings before production.