A swim spa quotation is rarely a single number. When you send an enquiry about Outdoor Swim Spa WS-PC05ST-S, the price that comes back depends on how the unit will be installed, what electrical supply is available on site, and which water-treatment and heating equipment you want included. The more of that information you give us in the first message, the faster we can return a quotation you can actually build a budget around.

Start with the model reference, then confirm the size

WS-PC05ST-S sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry lists the shell at 5000 × 2400 × 1470 mm, which is the first thing we check against your site plan: a 5 m footprint has to clear decks, boundary setbacks, service access and, for a project, any lifting route to the position where it will sit.

Tell us whether the unit will be installed above ground on a slab or deck, partly recessed, or set into a surround. Each option changes the packaging plan, the handling equipment needed at delivery and whether additional structural support is required around the perimeter.

The specification we quote against

To avoid confusion between similar models in the same family, here is what the catalogue page for this model shows. We will confirm every line item with you before production.

ItemCatalogue entry
ModelWS-PC05ST-S
Dimensions5000 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4 pcs
Total power6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two points matter for the quotation. First, the swim training system is what separates this unit from a plain plunge pool: if your client wants lap swimming rather than soaking, say so, because it drives both the pump selection and the power figure. Second, the water pump is not listed on this catalogue page, so we specify it together with you instead of assuming a default. Never read the total power figure as your final electrical load — heating options change it.

Options that change the price

Our catalogue lists these optional accessories for this range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each one against the configuration you choose.

  • Heating: a heat pump or a conventional heater determines running cost and the electrical supply required. Tell us the target water temperature and how many months a year the spa is used.
  • Water treatment: ozone is shown as a feature on this model. If you also want UV sterilisation or sand filtration, we quote it separately and check whether it fits the plant space.
  • Insulation and steps: relevant for year-round outdoor use and for accessibility, especially in hospitality settings.
  • Control system: confirm how many control points you need and where they will be located.

If the space calls for a different footprint or outline, our Customizable Shape Outdoor Spa covers customised shapes — square, round, oval and curved — with an acrylic shell and structural reinforcement for gardens, terraces and leisure areas. Send drawings early if you are considering that route, since it affects the engineering review before quotation.

Site and services information we need

  • Location and delivery address, including whether the site is a private residence, a villa development or a hotel/resort project.
  • Electrical supply: voltage and phase available on site, plus who supplies the electrician for final connection. Total power figures must be matched to your supply, not the other way round.
  • Structural support: slab or deck load capacity, and whether drainage or a plant room is provided.
  • Access for delivery: crane or forklift access, gate widths, and any lift in an apartment or rooftop installation.
  • Timeline: required on-site date, so we can align production and shipping.
  • Quantity: single unit or multiple units across a project. Batch orders are quoted differently.

For projects that combine the swim spa with other scope, our one-stop furniture and building materials supply covers design consultation, material selection, manufacturing, project management and handover, so the spa can be coordinated with the rest of the fit-out instead of arriving as an unrelated package.

Delivery, installation and after-sales scope

We arrange freight forwarding by sea, air and rail with the customs paperwork, packaging and container loading plans that go with it, and door-to-door delivery to the site address you give us. Import terms, duties and transit times are confirmed case by case for each destination, so we state them in the quotation rather than as a general promise.

On arrival, installation, inspection and snagging are part of our installation and after-sales support. Warranty coverage, spare parts and maintenance arrangements depend on the configuration you order, so we set them out in writing with the quotation. If your team will handle installation locally, tell us at the enquiry stage and we will supply connection requirements and technical guidance instead.

Related models worth comparing before you commit

If 5 m is longer than your terrace allows, or the layout needs a separate relaxation area, compare these first:

Questions buyers ask us at quotation stage

Can I get a price from the model number alone?

We can give an indicative figure, but a firm quotation needs the configuration list — heating, treatment, insulation, steps — plus the delivery address and electrical supply. That is what prevents a change order after production starts.

Is 6.55 kW my total electrical requirement?

That is the catalogue power figure for the listed features. Heating equipment and any added treatment are not included in it, so we confirm your on-site supply before finalising the specification.

Do you supply spare parts for jets, pumps and controls later?

Yes, and we list them with the quotation so replacement items match what was actually installed rather than a generic part number.

Send us your enquiry. Include the model reference WS-PC05ST-S, your site photos or drawings, the electrical supply available, and your required on-site date. Our team replies with a specification sheet and quotation for the exact configuration. Contact details are on our contact page.