A quotation for an outdoor swim spa is only as useful as the brief behind it. Two buyers can ask for the same model and receive prices that differ by a wide margin, because the shell size is only one line in the package. Pumps, jets, control options, heating, filtration, insulation, access and freight all sit underneath it. If your request for quote states the model but leaves those items open, you will get an estimate you cannot compare with anyone else's.
Below is the information we need from a purchaser to price Outdoor Swim Spa WS-125AⅢ-U properly, and what you should expect to see returned in writing.
1. Confirm the model and the shell it refers to
Name the model exactly as printed on the catalogue page. For this unit the catalog dimensions are 5500 × 2300 × 1350 mm, which is what we will base foundation, access and crane or forklift questions on. Then confirm you want the -U variant rather than the standard WS-125AⅢ. The two shells share the same external footprint, but the equipment fitted inside them does not match line for line: the WS-125AⅢ-U record shows 4 water pumps and 23 jets with a listed total power of 11.85 kW, while the WS-125AⅢ record shows 1 water pump, 20 jets and a swim training system at a different total power figure. That difference changes electrical work, running cost and price. If your project needs swim training, say so in the RFQ — it is not interchangeable between these two listings.
2. State the equipment list you are actually buying
The catalog entry for this model shows water jets, LED lighting and ozone as fitted features, plus one control system and one filter pump. Treat that as a starting point, not a fixed specification. The options we quote against include additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. Tell us which of these you want included, and which you plan to source locally, so the quotation reflects the real delivered scope rather than a base price with everything added later.
For heating specifically, give us the installation location and how the spa will be used through the year. A heat pump sized for a resort pool in a warm coastal site is not the same as one specified for a villa that runs the water at therapy temperature in winter. We need your target water temperature and the season of use to quote the right unit.
3. Give the electrical and site conditions
The listed total power for this configuration is 11.85 kW, so supply capacity is a real constraint, not an afterthought. Please include in the RFQ: available supply (single or three phase), local voltage and frequency, the distance between the main switchboard and the spa, and whether a dedicated circuit and protective device arrangement have already been planned. Also tell us who is doing the electrical connection. We will confirm the equipment's electrical requirements for the configuration you select; your local contractor handles compliance with local wiring rules and any permits, which vary by country and council.
On the site side, send a plan or photographs of the intended position, the finished floor level, whether the spa will be recessed, on a plinth or free-standing, and how a 5.5 m shell reaches that position — gate width, driveway, crane or forklift access. Where the spa sits relative to drainage matters as well: we need to know how overflow, backwash from a sand filter and seasonal draining will be handled.
4. Specify finishes and any integration work
Cabinet cladding, step arrangement and lighting colour are all quotable choices. If the spa is being built into a deck or matched to an exterior palette, send the finish reference and the deck detail early, because cladding and framing are made to suit. Where a project also calls for surrounding hard landscaping, wall cladding or poolside furniture, we can price those in the same package — see our building and construction materials range and the wider product catalogue. Grouping them into one purchase order simplifies shipping, but list each item separately in the RFQ so unit prices stay visible.
5. Set the commercial and logistics terms you need
A usable quotation should state: unit price per configuration, options priced individually, packing and container loading arrangement, port of loading, freight basis and Incoterms, insurance, estimated transit window, and what is excluded. Tell us the destination port or delivery address, your preferred Incoterms, and your required site date — then let us confirm production scheduling against it rather than assuming a lead time in advance. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork such as commercial invoices, packing lists and certificates of origin, and shipment tracking; import duties and local taxes remain for you to budget with your broker.
For villa and hospitality projects that need more than the spa itself, our turnkey solutions cover design coordination, production, logistics, installation and after-sales support as one scope. If you want that, say so in the RFQ and we will quote the swim spa inside a project package instead of as a standalone item.
6. Ask for these items back in writing
- A configuration sheet listing pumps, jets, control system, lighting, ozone and any options quoted, matched to the model name you requested.
- Total connected power and the electrical preconditions for that configuration.
- Dimensioned drawings showing the shell, steps, plant access and service access points.
- Separate prices for base unit and each option, with a stated validity period.
- Packing list outline, container plan, Incoterms, insurance basis and excluded items.
- Warranty scope, spare-parts availability and the support route after handover.
If any of those six are missing, the quotation is incomplete — request them before you compare prices between suppliers.
A short RFQ template you can copy
Project name and location · Model: Outdoor Swim Spa WS-125AⅢ-U, 5500 × 2300 × 1350 mm · Quantity and delivery address or port · Required options from the list above · Target water temperature and months of use · Supply: single or three phase, voltage, distance from switchboard · Installation method: recessed, plinth or free-standing, with access route described · Drainage arrangement · Finish references and any integration detail · Preferred Incoterms and required site date · Whether surrounding materials or furniture should be included in the same quotation.
Send that to us and you will receive a configuration we can both check line by line, instead of a single number that hides the differences. The SANTERSON team can confirm equipment, electrical requirements and freight for your specific site — contact us with your drawings and we will price the exact build.