Sliding storage panels rarely get specified until a project is well under way — usually when the drawings show a wall that has to do two jobs at once. In a hotel guest room it hides the minibar, the luggage bay and the television behind one flush surface. In a villa it closes off a study alcove, a wardrobe run or a media niche without breaking the joinery line. When a Santerson Sliding Storage Panel wall is specified properly, it reads as architecture rather than furniture. When it is specified carelessly, you inherit track tolerances, panel overlaps and finish mismatches on site.
The checklist below follows the order we work in on hospitality and villa fit-outs, from scope definition through to handover.
1. Define the wall's job before you choose a panel
Start with what sits behind the panel, not with the panel itself. Sliding storage panels in our Integrated Storage Walls collection are configurable systems: layout, dimensions, material and finish are set per project, so the internal zoning has to be resolved first.
For each wall, record:
- the items being concealed — television, minibar stock, linen, luggage, bathroom amenities, cables
- access frequency: daily housekeeping reach versus once-a-season storage
- clearance behind the panel for doors, drawers, sockets and service hatches
- whether the wall finishes floor to ceiling or stops at a reveal, cornice or adjacent unit
A guest-room wall that hides a television behaves differently from a villa media wall with speakers and cabling behind it. Where the panel also has to slide past a screen, our Sliding Panel TV Systems are usually the closer starting point, because the panel travel and the display recess are resolved as one detail.
2. Match the system to the opening type
Three related systems cover most of the work on a hospitality or villa package, and mixing them up is the most common specification error:
- Integrated storage panels — flush, made-to-measure wall storage where the panel is part of the built-in run.
- Closet sliding panels — wardrobe and closet fronts, where track loading, hanging clearance and hardware duty matter more than the decorative surface.
- Partition sliding systems — room-dividing panels, where the opening dimension, track support and panel weight drive the build-up.
In a hotel corridor suite or a villa open-plan living space, the same finish may be needed across all three. Specify them together in one schedule so the veneer, lacquer or laminate and the edge detailing are drawn from a single batch of decisions.
3. Set dimensions from site survey, not from drawings alone
Sliding panels fail on tolerance far more often than on appearance. Take site-verified dimensions for width, floor-to-ceiling height and floor level before production is released, and confirm the opening dimension with the track layout rather than assuming a nominal module.
For each wall in the schedule, confirm:
- finished floor level and whether screed or flooring is installed before the track
- panel count, overlap and parking position when the panels are open
- the structural support available above the opening for top-mounted tracks
- reveal depths where panels disappear into a pocket
Because these systems are made to measure, this survey step is what keeps a villa project in Sydney or Melbourne and a hotel floor in the same package consistent. Where our interior design service is engaged, space planning, drawings and production coordination run off the same surveyed dimensions.
4. Choose finishes for the traffic they will actually carry
A hotel panel is cleaned daily by housekeeping and knocked by luggage carts; a villa panel is cleaned weekly and judged up close. Specify accordingly, and state the finish in the submittal rather than leaving it to a sample number.
Typical decisions we handle through custom and OEM manufacturing:
- matte or textured surfaces for high-touch guest rooms, where fingerprints and cleaning agents are the design problem
- veneer and wood-tone surfaces for villa living areas, coordinated with Santerson Full Height Storage Walls and adjacent cabinetry
- glass and mirrored fronts where a closet panel also has to work as a dressing surface
- integrated lighting inside niches, with the electrical feed shown on the drawing before the panel is cut
Ask for a physical sample of the exact finish in the panel thickness you are ordering. A lacquer that reads well on a door sample can look flat once it spans a floor-to-ceiling panel under downlights.
5. Confirm hardware, track and movement
The mechanism is where the specification usually gets thin. For each wall, confirm with the supplier:
- track type — top-mounted, floor-guided or recessed — and who supplies it
- hardware duty against panel weight and daily cycle count in a hotel setting
- soft-close, push-open or handleless edge detail, and how the panel is grabbed
- spare hardware to ship with the order for future maintenance
In hospitality the cycle count is the deciding factor. A villa closet panel may open a handful of times a day; a housekeeping-serviced guest room panel sees more, and its hardware should be specified for that duty from the start instead of swapped after snags.
6. Order it as part of the fit-out package
Sliding storage panels sit at the boundary between joinery, wall finish and electrical work. Ordering them inside a single turnkey project package removes the coordination cost of separate suppliers — cabinetry, wall panels, lighting, flooring and fixtures arrive against one production schedule.
That matters most on overseas delivery. Our logistics covers freight by sea, air and rail with customs paperwork and door-to-door delivery, and installation support covers site fitting and inspection. Panels are heavy, oversized items; they travel far better when packed to the same schedule as the rest of the joinery than when shipped as a late variation.
What to send us to get a workable quotation
Send the wall elevation, the surveyed opening dimensions, the intended contents behind the panel, the finish reference and the room type. With those five items we can return a layout with panel count, track arrangement and material build-up for review — and flag any detail that needs site verification before production.
Santerson has manufactured furniture and building materials since 2008 for hotel, villa and office projects. To discuss a storage wall or sliding panel schedule for your project, contact us and we will start from your drawings.