A laser cut metal screen can carry the whole first impression of a hotel reception, yet on most fit-out programmes it arrives later than planned and gets ordered in one lump that nobody has measured against the actual wall. The result is predictable: panels that do not line up with the ceiling grid or lighting, finishes that clash with the joinery beside them, and a change order at the worst possible moment. This guide walks through how we break a screen project into quantities and coordinate it with everything around it, using our Custom Laser Cut Metal Screen - Decorative Partition for Hotel Reception as the working example.

Start with the wall, not the pattern

The pattern is the fun part and the last thing we settle. Before it, three site dimensions decide everything: the clear run of wall or floor-to-ceiling height the screen must span, the position of fixed elements you cannot move (reception desk, door openings, service outlets, light coves, sprinkler heads), and how the screen terminates at each end — into a wall return, a glass partition, or free-standing in an open plan.

Send us the marked-up drawing or even a measured photograph with dimensions written on it. From that we can tell you quickly whether your run wants a single fixed panel per bay or a multi-panel configuration with frames between panels. For wide feature walls, a multi-panel build is almost always easier to transport, handle on site and replace later than one oversized sheet.

How the quantity is calculated

We quote laser cut screens by panel, sized to the opening each panel fills, not by square metre of raw sheet. That distinction matters when you are comparing supplier quotations: one vendor pricing per square metre and another pricing per fabricated panel will look wildly different for the same wall.

Here is how we normally split a reception screen into quantities:

ItemWhat you confirmWhy it changes the count
Fixed panelsWidth and height of each bay between fixed elementsEach bay is one panel. Splitting a long run into more bays adds frames but reduces handling risk.
Frame / profilePerimeter framing plus any intermediate mullionsFrame length follows the total cut perimeter, so more, smaller panels means more linear metres of profile.
Cut panel count per design variantWhether one pattern repeats across all panels or the design changes at a columnEach distinct pattern is a separate cutting file and setup, so keep variants to what the design genuinely needs.
Return and edge piecesCorners, wall returns, reveal depthsOften missed in first counts. A 90° return at the end of a feature wall is a separate fabricated piece.
Spare panelsNumber of publicly exposed panels in high-traffic areasFor lobby screens we discuss spares with you up front, so a damaged panel later does not require a new production run.
Fixings and substrateWall build-up: masonry, plasterboard stud, steel frameDetermines anchor type and whether noggins or backing need to be added by the site contractor before we deliver.
Practical sequence: measure and mark on site first, issue a shop drawing with panel boundaries numbered, then order. Quantities signed off against an unnumbered elevation are the most common cause of panels arriving that nobody can place.

Coordinating the screen with adjacent products

A reception screen never sits alone. It touches ceiling, floor, wall finish and lighting, and each junction needs an agreed decision before production starts.

Ceiling and lighting

The hollow pattern only reads well if light passes through or across it. Agree with the electrical contractor whether the screen is front-lit, back-lit or lit from a cove, and where the fitting sits relative to the panel face. If your ceiling design uses metal ceilings, fix the ceiling line and the screen head height on the same drawing — our Aluminum Ceiling Panel range and Aluminum U Baffle Ceiling are frequently specified in the same lobby, and both are made to size, so the junction detail has to be settled rather than improvised on site.

Floor and wall finishes

For floor-standing screens, decide whether the screen sits on the finished floor or is set into a reveal. That decides the panel height you order. Where the screen meets stone, tile or wall panelling, coordinate the trim detail with the same supplier where possible — see our Wall Panel Systems and Decorative Metal Profiles, which cover the edge and transition pieces that stop a metal screen from butting straight into plaster.

Joinery and reception desk

If the screen forms the backdrop to a bespoke desk or cabinetry run, share both drawings together. Metal finish and timber tone are decided as a pair, and the desk footprint sets where the first screen panel starts.

Finish selection: keep it consistent across the project

Our screens are made from stainless steel with a choice of surface treatments — brushed gold, matte black and antique bronze are the finishes we produce most often for reception applications. Corrosion resistance and easy cleaning are the reasons hotels keep specifying metal rather than timber or MDF in these high-touch positions.

Two rules that save rework:

A worked quantity example

Say a boutique hotel reception has an 8.4 m feature wall behind the desk, 3.1 m clear height, with a door opening at one end and a plasterboard stud wall behind. A workable breakdown:

  • Six fixed panels across the main run, each framed, sized to the bay between structural and desk-setout lines rather than evenly divided.
  • One narrower panel at the door side, detailed as a full-height piece with an integrated frame so the opening reads deliberately.
  • Perimeter and intermediate framing in the same finish as the panels, ordered by total linear length from the shop drawing.
  • One cutting file for the repeating pattern, one variant at the feature end if the design calls for it — not six variants.
  • Backing confirmed with the site contractor: noggins set out to the panel line positions before the plasterboard is closed up.

That is a quantity list a site team can actually build against, and it is what we produce from your drawing once dimensions are confirmed.

Ordering sequence on a real programme

Screens sit late in the finishes sequence but must be ordered early, because the cutting files depend on decisions owned by other trades. Our usual order of work with a project team:

  • Design intent and reference image — send us a drawing, photo or mood board; we fabricate to exact dimensions.
  • Site measurement and shop drawing issue for your approval, with panels numbered on the elevation.
  • Finish sample approved under site lighting conditions.
  • Production, then packing arranged so panel sequence matches the numbered elevation on delivery.
  • Installation on site with inspection and snag list, coordinated through our installation and after-sales support.

Because we also arrange freight and door-to-door delivery, the panels can be delivered to site rather than left at a port with the rest of your consignment to clear separately — worth putting on one purchase order when you are also buying one-stop furniture and building materials for the same floor.

Common quantity mistakes we see on enquiries

  • Ordering by total wall area instead of panel-by-panel, which hides the framing and edge pieces that make up real cost.
  • No dimension for the top junction, so panels arrive short of a raked ceiling.
  • Pattern scaled from a small reference photo without checking whether the motif still reads at panel size.
  • Finishes specified room by room by different designers, then discovered to be incompatible across the lobby.
  • No backing detail agreed with the wall contractor before the screen is manufactured.

What to send us for an accurate quantity and quotation

  • Marked-up elevation or CAD/PDF of every wall the screen touches, with dimensions.
  • Location of fixed elements: desk, doors, outlets, lighting, sprinklers.
  • Wall build-up and any performance requirement for that position.
  • Preferred finish, plus the finishes of adjacent joinery, metal ceilings and profiles.
  • Target site date, so we can sequence production against your other fit-out items.

FAQs

Can the pattern be copied from a photograph I already have?

Yes. Send the reference and we re-draw it as a cutting file sized to your panels. A photograph gives us the motif; your panel dimensions set the scale, so the pattern is rebuilt rather than traced at whatever size the image happened to be.

Do you make screens to floor-to-ceiling height in one piece?

It depends on the storey height, transport route and access to the room. We advise panel splits based on your site dimensions and lift or stair constraints, since a split with a frame in the same finish is far less visible than a panel that cannot get through the door.

Can the screen be installed against an existing finished wall?

Yes, subject to the substrate being able to take the fixings. We confirm anchor type from your wall build-up; where a new stud wall is going up, adding backing at the panel lines before closing it saves time and cost on site.

What surface treatments are available?

Brushed gold, matte black and antique bronze are the treatments we produce most often for hospitality screens. Send your design intent and we will advise which suits a specific touch-heavy position.

Planning a reception screen and want the quantities worked out against your drawings? Contact SANTERSON with your elevation, wall build-up and target site date, and we will return a panel-by-panel breakdown, shop drawing and quotation for the full metal partition scope.