Wall finishes are one of the last items a buyer signs off and one of the first things a client notices. When you send a decorative wall panel for interior home decoration into a project, the difference between a smooth order and an expensive rework usually comes down to how much of the finish your procurement brief actually describes. A short paragraph about "feature panelling" is not enough to price, produce or install anything.
The 2227 line sits in our Ceiling / Wall Panels range and is positioned for interior wall renovation: a panel offered in a variety of textures and colors so that minimalist and more decorative schemes can both be served from the same wall family. Its product page lists light weight, moisture resistance, easy installation, reduced labor and custom specifications as the working advantages, and states that it suits interior residential and commercial projects. That is exactly the kind of finish a procurement brief has to translate into instructions a factory can act on.
1. Fix the room list before you fix the panel
Start with the spaces, not the surface. For a home project, the wall that normally gets specified first is the background wall in the living room, followed by bedroom feature walls and any hallway or study wall that carries joinery. Each of those rooms asks different questions: does the wall need to sit behind a television with cable routing, does it run into a wardrobe front, does it meet a window reveal, is there a radiator or a switch plate in the field of the panel?
Write the room list as a table in your brief. One row per wall: room, wall reference from the drawing, net area to be covered, and what the panel has to coordinate with. This single table prevents the most common dispute on site, which is not the color of the panel but the fact that nobody decided where the last board stops.
2. State the finish family and what it must imitate
Decorative panels are chosen for an effect, so describe the effect in words your supplier can match. Our interior panel range covers surfaces that read as wood, stone, fabric and plain textured finishes, and separate lines exist if you want a three-dimensional relief wall or a configurable textured panel system with made-to-measure sizing. In the brief, name the look you are after, then attach a reference image and a target color range.
Where the design intent is closer to natural stone or marble than to a printed laminate, say so explicitly and ask which panel in the range delivers that surface. The stone and marble panel option in our paneling systems is specified per project for finish, layout and dimensions, which makes it easier to match a large-format look across a wide wall without visible repetition.
3. Give dimensions, thickness and edge treatment as instructions
Custom specification is listed as an advantage of this product family, so use it rather than hoping standard boards will fit. For every wall in your table, record the overall run, the storey height at that point, and whether you want a vertical or horizontal layout. Then state the panel thickness you expect and how the edges are resolved: a shadow gap, a trim profile, a butt joint into plaster, or a mitred return at an external corner.
Do not leave corners and reveals to the installer's judgment. If a wall returns around a window or meets a ceiling bulkhead, ask for the detail you want in writing and request that the supplier confirm whether those pieces are cut and finished in the factory or trimmed on site. Panels described as easy to cut and install on site still need a decision about who does the cutting and how offcuts are accounted for.
4. Describe the substrate and the fixing method
A decorative panel is only as good as the wall behind it. Your brief should state what the substrate will be at handover — plasterboard, existing painted plaster, brick, or a battened frame — and who is responsible for making it flat and dry before panels arrive. Light weight reduces the load on a wall, but it does not correct a bowed surface.
Ask the supplier to confirm the fixing method for your substrate: adhesive, mechanical fixings, or a battened subframe, and whether the choice changes the finished wall build-up by a few millimeters. Those millimeters matter where panels meet flooring, architraves and doors, because an added subframe shifts reveal depths and cabinet returns.
5. Set the moisture and use expectations honestly
Moisture resistance is listed as an advantage of these interior panels, which is why they are chosen for hallways, bedrooms and living rooms where a wipe-clean surface matters. Interior wall renovation is the stated application for this product family, so treat external exposure and any location with sustained direct water contact as a separate specification question rather than assuming the interior panel covers it.
Put the intended use in plain language in the brief — "living room background wall, dry interior, occasional cleaning with a damp cloth" — and ask the supplier to confirm suitability for that use rather than assuming it. If you need fire performance, impact resistance or a specific cleaning regime, request it as a question and get an answer per project; do not copy wording from a brochure into your purchase order as though it were a tested result.
6. Order samples and a mock-up wall
Nothing in a brief replaces seeing the panel at the actual viewing distance under the actual lighting. Request physical samples of the selected surface, and for any wall over a few square metres ask for a small mock-up: one panel section fixed the way it will be fixed on site, with the edge detail you specified. A mock-up exposes joint behaviour, sheen under artificial light, and how the texture reads from two metres away.
Record what was approved on the mock-up — surface reference, layout direction, joint width, edge profile — and attach a dated photo to the brief. That record becomes your acceptance standard when the delivery arrives.
7. Specify quantity, sequencing and packaging
State quantities as net area plus a wastage allowance you agree with the supplier, and ask them to confirm how panels are packed for international freight. Panels described as lightweight and easy to handle still arrive damaged if corner protection is inadequate, so packaging detail belongs in the brief alongside the delivery address and the access conditions at site.
Then sequence the wall finish against everything that touches it: electrical first fix, joinery, flooring, lighting. A background wall that carries a television or concealed shelving needs its cable routes and backing battens decided before panels are cut. Our wall panel systems are specified together with the storage and media units they sit behind for exactly this reason.
8. Name one accountable supplier for the whole finish package
Wall panels rarely arrive alone. A home or villa package normally carries cabinetry, doors, flooring and lighting alongside the wall finish, and every interface between those trades is where errors appear. Working with a one-stop furniture and building materials supplier means the panel, the joinery it meets and the screens or partitions nearby can be coordinated from one production schedule instead of reconciled on site by three different vendors.
As a China-based manufacturer covering building and construction materials alongside furniture, SANTERSON supports this route through custom/OEM work, project coordination, door-to-door logistics and installation support. For buyers, the practical benefit is a single point of contact for wall finish questions from drawing stage to handover.
A short brief template you can copy
Before sending an enquiry on this product, make sure your document answers these points: room and wall reference; net area and layout direction; surface effect required with a visual reference; panel thickness and edge treatment; substrate type and who prepares it; fixing method to be confirmed by the supplier; intended interior use and cleaning regime; sample and mock-up approval record; quantity with agreed wastage allowance; packaging and delivery conditions; and the interfaces with joinery, flooring and lighting.
A brief that answers those ten points prices accurately, produces once, and installs without arguments. A brief that says "decorative wall panels to designer's selection" does none of them. If you are assembling a wall finish package for a villa or residential project, send us the wall schedule and we will confirm the panel specification, dimensions and fixing details for each space.