A request for quote that only states a model name and a quantity usually comes back with a price and nothing else useful. For outdoor swing benches, the difference between a workable quotation and an unusable one is almost always detail: which seating size, which roof treatment, which frame finish, how many units per zone, and where the goods have to arrive. The checklist below follows the way we quote the polycarbonate hardtop outdoor swing bench collection for villa terraces and resort gardens, so your first enquiry can be answered with a real number instead of another round of questions.
Start With the Collection You Are Actually Buying
The hardtop swing family replaces the usual fabric canopy with a polycarbonate roof. In our product copy, that change is meant to avoid the ageing, tearing and water pooling that fabric tops develop, and it gives the bench a perforated metal backrest that reads as contemporary rather than rustic. The roof can be tilted to change the shading angle, cushions are removable for cleaning or storage, and the range is offered in two seating sizes.
State which of those variants you need, and how many of each. A terrace with two seating bays and a pool deck with four will quote very differently, and mixed sizes across zones should be listed separately rather than added together as one quantity.
The Eight Items a Complete RFQ Should Contain
| Item | What to write down |
|---|---|
| 1. Item and quantity by zone | Model or reference image, seating size (2-seater or 3-seater), quantity per location, and the room or area name for each block of units. |
| 2. Frame finish | Coating type and colour reference for the metal frame. Give a RAL code, a sample photo from your existing joinery, or the finish used on other outdoor items in the same project. |
| 3. Roof transparency | How clear or how tinted you want the polycarbonate panels, and whether all units share one setting or if shaded and open zones differ. |
| 4. Cushion specification | Fabric type, colour or pattern, and the number of cushion sets per unit. Ask for spare covers if the project budget allows; cushions are the part that rotates out first. |
| 5. Site conditions | Floor or deck surface, whether the swing sits on a slab, timber deck, pavers or lawn, and any fixing requirement your engineer or contractor has set. |
| 6. Delivery terms | Delivery address, port or door, Incoterms you want priced, container or consolidated shipment preference, and the latest date goods can land for your programme. |
| 7. Project context | Villa, resort, hotel garden or clubhouse; new build or fit-out; and whether other outdoor furniture is being bought at the same time so pieces can be coordinated. |
| 8. Your decision path | Who signs off samples, who approves colour, and whether a physical sample or first article is required before volume production. |
Specify the Customisable Points Clearly
Frame finish, cushion pattern and roof transparency can all be adjusted to match a project's styling. That flexibility is useful only when it is specified, so put each of those three decisions in the RFQ as its own line rather than burying them in a covering email.
If your design has already fixed the palette elsewhere on the project — the pergola overhead, the pool loungers, the external joinery — send that reference with the enquiry. Coordinating finishes across outdoor furniture is straightforward when the references arrive at quotation stage, and awkward when they arrive after production has started.
For hospitality work, also state whether units across guest zones must be identical or whether a feature specification is acceptable in one or two locations. Mixed specifications reduce cost in some layouts and raise it in others, and the supplier cannot advise properly without knowing which you are weighing.
Ask for a Quotation That Can Be Compared
If you are tendering more than one supplier, ask each quotation to break the price into the same parts. A comparable quote for this collection should separate:
- unit price by seating size, at the quantity you requested;
- the cost of any non-standard finish, tinted roof panel or bespoke cushion specification;
- packing method and the cube or container plan, so freight can be checked independently;
- freight under your stated Incoterms, with the delivery point named;
- production lead time and what starts it — deposit, approved sample, or approved drawings;
- what is covered after delivery, in writing, including how replacement parts such as cushion sets and roof panels are supplied.
A single all-in number tells you nothing about where a cheaper offer became cheaper. Once the parts are separated, differences in steel thickness, coating specification, panel quality and freight terms become visible.
Common Gaps That Delay a Quotation
- No seating size stated. Two-seater and three-seater units are different products, and a quantity without a size cannot be priced.
- Colour named in words only. "Grey" or "bronze" means something different to every factory. Give a code or a reference sample.
- Delivery address missing. Freight is a real share of the landed cost on bulky outdoor items, and door delivery to a regional resort site is not priced like port delivery to a capital city.
- No programme date. Without a required-on-site date, production scheduling cannot be confirmed, and an early quotation may already be out of date when you are ready to place the order.
- Site conditions left out. Fixing details on a cantilevered terrace or timber deck affect what the supplier should recommend and whether additional hardware appears later as a variation.
What Happens After You Send It
With those details in place, the normal sequence is straightforward: we review the specification, confirm anything ambiguous, and return a priced proposal with lead time and packing data. From there you approve samples or first-article finishes, then production and shipment follow. As a one-stop furniture and building materials supplier, we can also quote the seating, shading and hard landscaping items around the swing bench in the same package, which keeps finish coordination inside one specification instead of several.
Our custom and OEM service covers bespoke finishes and flexible order quantities where a project needs something outside the standard range, and logistics and door-to-door delivery can be arranged with the paperwork handled on our side. Terms, transit arrangements and after-sales coverage are confirmed per project in writing rather than assumed from a catalogue.
Send This Before You Send the RFQ
- Seating size and quantity for every zone, listed separately.
- Frame finish reference (code or sample), roof transparency, cushion fabric and colour.
- Surface the benches will sit on, plus any fixing requirement from your engineer.
- Delivery point, Incoterms to be priced, and required-on-site date.
- Whether samples or first article are needed before volume production.
Send your quantities, finish references and delivery point to SANTERSON and we will return a broken-down quotation for the hardtop swing collection, including lead time and packing data. Contact details are on our contact page.
SANTERSON is a China-based furniture and building materials manufacturer supplying villa, hospitality and office projects, with outdoor furniture collections for terraces, pool decks and resort gardens.