An open shelf tall cabinet looks simple on a drawing. It is a floor-to-ceiling box with shelves, and most buyers assume that specifying the width and a finish settles it. In practice the details that decide whether the unit works on site are decided much earlier: which room it sits in, what will be stored on it, how deep the wall build-up leaves it, and who is going to lift it into place. This article walks through the project information we need from you to configure a Santerson Open Shelf Tall Cabinets unit that arrives ready for your opening.
Start with the room, not the cabinet
Our Open Shelf Tall Cabinet belongs to the Tall Cabinets collection and is specified most often for residential bathroom projects, where it takes the place of a built-in cupboard in a corridor, ensuite or shared family bathroom. The same tall-cabinet logic also appears elsewhere in the range: Santerson Utility Tall Cabinets for household storage, and Santerson Corner Tall Cabinets where the useful height is trapped in a corner. Tell us the room first, because humidity, traffic and what you store there all change the specification.
A bathroom unit that holds towels and bath products behaves differently from one next to a basin that will be splashed daily, and differently again from a linen store in a hallway. In villa work we usually mix the two: open bays for things used every day, closed doors for stock you do not want on display.
The dimensions we need before production
These cabinets are made to measure, so the numbers must come from your finished condition rather than a structural drawing. Please confirm:
- Finished height and floor level. Floor-to-ceiling means the slab-to-ceiling dimension after tiling, screed and any ceiling build-up. Give us the height at the left edge, centre and right edge; on site these rarely match.
- Depth of the recess and of the unit. The clear opening is not the cabinet depth. Note pipework, boxing, radiators or a door reveal that reduces usable depth.
- Shelf count and spacing. Send a list of what goes on each shelf — folded towels, tall bottles, baskets — so we set the fixed shelves where they belong.
- Opening direction and adjacent units. Whether the cabinet stands alone or butts into a vanity or wardrobe affects the side finish and the plinth detail.
If you are ordering tall cabinets for several bathrooms in one project, send the room-by-room schedule in one file. Identical heights across rooms reduce both cost and on-site error; where they differ, we produce each unit to its own opening.
Materials and finish in a wet room
Material and finish options are selected per project. For bathroom locations the questions we ask are practical: will the lower shelves sit in a splash zone, is the room mechanically ventilated or only window-vented, and does the unit stand against an external wall? Board choice, edge treatment and surface finish are then matched to that environment rather than picked from a sample board alone.
For visual consistency across a villa or apartment package, we match the cabinet carcass and shelf edges to the finishes already chosen for your built-in furniture, so the tall cabinet reads as part of the same joinery package instead of an item bought separately.
How much open shelving you can live with
Open shelves are fast to use and make a narrow bathroom feel wider, but everything on them is visible and needs dusting. A useful rule we apply on residential projects: keep the bays between eye height and reach height open for daily items, close the bottom bay below knee height, and reserve the top bay for stock you access monthly. Where a project calls for display rather than storage, Santerson Open Display Units carry the same made-to-measure logic in living areas.
Lighting, shelves and accessories decided at the drawing stage
Recessed shelf lighting changes the cabinet build: channels, cable routes and a driver location must be drawn before the panels are cut. Our Santerson Integrated Cabinet Lighting is specified together with the cabinet so the fixings and electrical requirements match the design, and matching shelving accessories — dividers, baskets, adjustable shelf pins — are fixed in the same order rather than added later by a site carpenter.
Delivery, handling and installation on site
A tall cabinet is the item most often damaged at delivery, because it is long, heavy and has to be turned in a stairwell. Measure the lift, the stair landing and the bathroom door before we decide whether to ship the unit assembled or as panels for on-site assembly. We handle logistics and door-to-door delivery by sea, air and rail with customs paperwork prepared, and installation and after-sales support covers on-site fitting, inspection and snag resolution.
Two site conditions to settle early: whether the wall behind can take a fixed unit or needs a floor-mounted frame, and where the skirting and tiles stop. These decide the scribe and plinth detail, and getting them wrong is the most common reason a tall cabinet looks "not quite right" once installed.
A short checklist before you send an enquiry
- Room name, finished floor-to-ceiling height at three points, and clear recess depth
- Storage list per shelf, plus the number of open bays versus closed doors you want
- Finish reference from your joinery or tiling schedule
- Whether integrated lighting is required, and where power will be available
- Access route to the room: lift dimensions, stair turns, door widths
- Quantities per unit type, so identical heights can be grouped in one production run
Where the open shelf tall cabinet fits with the rest of the tall-cabinet range
If a project needs more than an open bay, the same made-to-measure approach covers the alternatives. Santerson Glass Front Tall Cabinets put glass where you want to see contents but keep dust off them, and Santerson Integrated Appliance Tall Cabinets are built around appliance dimensions, ventilation and electrical requirements. Mixed projects often combine open bays with closed doors in one run; the schedule above is what we need either way.
How we support the specification from here
SANTERSON has been manufacturing furniture and building materials since 2008 and supplies project packages that combine bathroom fixtures, built-in joinery, lighting and finishes from one production base. Send us your drawings or a room schedule and we will return the cabinet configuration, material and finish proposal, and a delivery plan for the units you need.
Talk to our project team about tall cabinets, vanities and bathroom joinery for your next villa, apartment or hospitality project. Send your room schedule to the SANTERSON project team and we will confirm dimensions, materials and a delivery plan for each unit.