A glass open wardrobe sits between two familiar bedroom fit-outs. It has the visible, styled character of an open rail and shelving system, but it still needs the same dimensional discipline as a closed built-in. That is where enquiries usually stall: drawings arrive with a room length, a wish list of finishes, and no agreed way to describe what sits between them. The result is a quotation that cannot be compared, or production starting on numbers nobody signed off.
The measurements below are the ones our workshop uses when a glass open wardrobe moves from a concept image to a made-to-measure order. Send them with your drawings and we can quote, detail and build against the same reference.
Start With the Room, Not the Wardrobe
Open wardrobes are usually built into an alcove, run along one wall, or form a partition between a bedroom and an ensuite. Each route puts different demands on the frame, so record the shell before talking about doors and finishes.
| Input to record | Why it matters for glass open wardrobes |
|---|---|
| Overall run length at three heights (floor, mid, ceiling) | Walls are rarely the same width top to bottom. Three readings tell us whether the frame needs a scribe or packer line rather than an assumed straight run. |
| Finished floor level and where the floor finish will stop | Glass open wardrobes read best when the base is set out against a completed floor. A pending screed or threshold changes the height we build to. |
| Clear height, plus the depth of any ceiling rebate, coving or shadow gap | Determines whether the carcass stops below the ceiling or is detailed to meet it, and where glass edges are protected. |
| Wall construction and fixing points | Tie-in to masonry, stud partition or an existing built-in changes bracket type and load path. Share this before we set out hanging rails and tall bays. |
| Obstructions: skirting, architraves, sockets, switches, sprinkler heads, light plates | Each one is a cut-out or an offset in the frame. Marked on the drawing, they cost nothing; found on site, they delay handover. |
| Adjacent finishes: flooring, wall panel, stone, carpet | Tells us how the side panels and glass edges should be trimmed and which trades close the joint. |
The Wardrobe Dimensions We Need to Price and Build
With the shell captured, set out the unit itself. Our freestanding open wardrobes and wall-mounted versions follow the same logic: made-to-measure sizing, material and finish options, and a layout tailored to the project.
- Bay widths. Give each bay's clear opening width rather than one total. Glass panels are cut and edged per bay, so the split drives both cost and how the run reads in the room.
- Total depth and usable depth. Note the overall depth you want, then confirm whether hanging garments must clear the front edge. That single question decides rail position and shelf projection.
- Vertical zoning. State hanging heights for long garments and short garments, drawer bank height, shelf spacing, and any tall bay for luggage or seasonal items.
- Frame profile and colour. Aluminium frame sections come in different widths and finishes. A slimmer sightline looks lighter but changes how glass is seated, so the profile choice belongs on the drawing.
- Glass type and tint for every opening. Clear, bronze, grey, frosted or ribbed glass each behaves differently under bedroom lighting. Specify per bay if they vary across the run.
- Edge and hardware detail. Edge treatment, handle or handleless fronts, pull profiles, and soft-close fittings where drawers are used.
- Lighting. Recessed shelf strips, vertical channel lights or a top-lit bay: note the fitting type, driver location and switching so we can pre-lead the carcass.
Project Inputs That Change the Specification
Beyond the numbers, four project facts shape what we recommend. They are quick to state in an enquiry and save a revision round.
How to Send the Information
A workable enquiry bundle looks like this:
- Room drawings with the three height readings and marked obstructions.
- An elevation per wall, showing bay widths and vertical zoning.
- A finishes schedule: frame profile and colour, glass type per bay, carcass board and surface.
- Quantities by room type, plus the required delivery sequence for phases.
- Any reference images, with a note on what you want taken from them and what you want changed.
Our custom furniture design and prototyping service works directly from that bundle, including finish sampling before full production. Where a project needs the wider package — joinery, wall panelling, flooring, lighting and bathroom fixtures from one supplier — our villa furniture and interior fit-out supplier service keeps setting-out drawings, production batches and shipping in a single programme.
Send the drawings and quantities with your project location, and we will return detailed dimensions, a finishes schedule and a quotation you can compare line by line. Confirm final dimensions and selected specifications for each project before production begins.