Planning the international delivery of a made-to-measure built-in starts long before the container is booked. A Santerson Wall Mounted Media Wall looks simple on a drawing: a panelised backdrop, a recess for the screen, some open shelving and closed storage. On site it is one of the most coordination-heavy elements in a living room, because it has to arrive undamaged, fit a wall that was built by somebody else, and leave space for cables, ventilation and access. This guide walks through how we plan an international project order from the first site measurement to handover, so buyers, contractors and interior firms know what to prepare at each stage.
Before the order: lock the wall, not just the look
Our Wall Mounted Media Walls are made to measure for each project. Finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size, which is exactly why the pre-order information matters more than the surface sample. Before we can quote production, we need four things from your side:
- Verified site dimensions. Overall wall width, height and depth envelope, plus the position of skirting, cornices, doors, radiators and any return corners. Where the media wall meets other finishes, note who is responsible for the junction.
- Screen and equipment schedule. Display size and mounting method, plus soundbar, console, set-top box or media player requirements, so shelf depths, ventilation gaps and cable routes can be designed around them.
- Wall substrate and fixing condition. The load-bearing capacity of the wall and the substrate type determine the fixing detail. If the wall is still open, we can advise before plasterboard goes up; if it is finished, we work from what is verifiable on site.
- Storage split. Open display, closed cabinets, drawers and any integrated lighting change both the carcass build and how the unit is packed for shipping.
Because the published listing shows the configurable options rather than a full technical sheet, we treat dimensions, materials, hardware, fixing method and lighting specification as items to confirm in writing for each project. That confirmation sheet, not the catalogue image, is what protects the order later.
Step 1: Drawings and production approval
Once the brief is set, we convert it into production drawings: elevations of the wall, carcass sections, finish call-outs and a marked dimension sheet showing clear openings for the screen and equipment. You approve the drawings before cutting starts. For villa and apartment orders this is usually one approval round; where the media wall has to coordinate with adjacent joinery, flooring or ceiling details, we run it together with those trades so that reveals and shadow gaps are settled once.
This stage is also where you decide on the format. If the screen should sit inside a full-height backdrop rather than a floating panel, the Santerson Full Height Media Walls in our Media & TV Walls collection is the version to specify, and it changes the shipping split as well: full-height panels are taller, heavier and more sensitive in transit than modular wall-mounted units.
Step 2: Manufacturing and pre-shipment inspection
Production follows the approved drawings. For project orders we manufacture to the confirmed finish and dimension sheet, then check the finished carcasses against it before packing: panel squareness, edge banding and finish condition, door and drawer alignment, hardware set, and the cut-outs for cable access. Anything that would be visible after installation is checked here, because correcting a finish or an alignment issue in the factory costs one inspection, while correcting it on site at the end of a project costs a mobilisation.
If your order includes other joinery from the same programme — kitchen cabinetry, wardrobes, sideboards, niche panelling — we can produce those against the same finish schedule and consolidate them into one shipment. Buyers sourcing several interior elements for one building usually find this is where an international order becomes easier to manage: one production window, one inspection, one set of packing lists.
Step 3: Packing design for long, flat panels
A media wall packed like loose furniture is the shipment most likely to arrive with damage: long panels are vulnerable along their edges, finished corners chip on impact, and glass-fronted elements take the worst of it when a load shifts. Our packing approach for wall-mounted units is built around that reality:
- Component-level protection. Carcasses, doors, shelves and back panels are packed separately with edge protection on all four sides of every panel, so an impact on one corner does not travel through the unit.
- Panel orientation and bracing. Tall panels are crated to stay vertical or flat according to their size and are blocked so they cannot slide against each other during handling.
- Hardware and small parts packed separately. Hinges, runners, mounts and fixings go in labelled boxes referenced on the packing list, so nothing is loose inside a crate where it can press against a finished face.
- Numbered crates matched to the drawings. Each crate is marked with the room or wall reference from the approved layout, which is what makes unloading and sequencing possible on a busy site.
We also record gross weight, crate dimensions and total volume for every shipment, so you can plan the receiving side: whether the crates fit through the entrance and lift, where they will be stored, and how many people the unload needs. Storage conditions matter more than most buyers expect — panels left in an unheated or damp corridor before installation can move or mark the finish.
Step 4: International freight, documents and customs
For international project orders we arrange forwarding by sea, air or rail, prepare the shipping paperwork and deliver door to door. For a media wall order the practical decisions are these:
- Mode of transport. Full container loads for whole-apartment or villa packages; groupage or consolidated loads when only a few wall units are being reordered or added late. Air is normally reserved for small, urgent items such as replacement doors or hardware, not full carcasses.
- Delivery terms and the last leg. Confirm how far our delivery goes under your chosen Incoterms and who handles the final carry-in from kerb to room. On upper-floor apartments this is often where a project stalls.
- Documents. Commercial invoice, packing list and origin documentation are prepared with the shipment; import permits and clearance requirements depend on the destination country, so we confirm them for your specific order rather than assuming they are the same as last time.
- Insurance. Marine insurance is an option worth taking explicitly for panelled and glass elements. Declared value and coverage scope should be agreed before loading, not after damage appears.
Transit time, duties and clearance are destination-specific, so we state them per order in writing instead of quoting general figures. More detail on how freight is arranged is on our Furniture Logistics and Door-to-door Delivery page.
Step 5: Site readiness before the crates arrive
The most common cause of a delayed media wall installation is not the shipment — it is the room. Before delivery, confirm on site:
- wall finishes behind and around the unit are complete, and the wall is confirmed as ready to carry the fixing detail agreed in the drawings;
- cable runs, sockets, aerial and network points are where the approved drawing shows them, and have been tested;
- the screen and equipment are on site or scheduled to arrive before fixing, so cut-outs and recesses can be checked against the actual items;
- a clear, dry storage area exists for numbered crates, and access from the loading point is usable.
If any of these are unresolved when the crates land, the units sit. We schedule installation around site readiness rather than vessel arrival, because a unit installed into an unfinished wall usually has to come off again.
Step 6: Installation, snagging and handover
Installation follows the approved layout: setting out on the wall, fixing the carcasses to line and level, hanging doors and drawers, fitting the screen into its recess, then threading and dressing cables. The final pass is a snag check — door alignment, finish condition after handling, hardware operation and stability of the mounted assembly. We provide Furniture Installation and After-sales Support as part of project delivery, including inspection of snags, spare parts and replacement for transit or handling damage, and maintenance guidance. Warranty terms, response times and what is excluded are confirmed per order; we set them out in the project paperwork rather than describing them in general terms here.
For spares, keep the crate numbering sheet and the drawing reference with your handover documents. If a door or shelf needs replacing two years later, an order placed against the original drawing reference is far faster than one described from photographs.
A short checklist for buyers
| Stage | What you provide | What we confirm back |
|---|---|---|
| Enquiry | Wall photographs, rough dimensions, screen size | Layout options and what still needs measuring |
| Drawings | Verified dimensions, equipment schedule, finish choice | Production drawings and specification sheet for signature |
| Production | Approved drawings, deposit as agreed | Pre-shipment inspection record, crate list, weights and volume |
| Freight | Delivery address, importer of record details | Transport mode, terms, documents, insurance option, tracking |
| Site | Finished wall, tested cable runs, storage area, access | Delivery window and installation sequence |
| Handover | Site access, agreed snag list | Installed unit, snag closure, spare-part reference |
Where a project needs the media wall coordinated with other built-in elements across the same building, our Turnkey Interior Project Solutions cover design coordination, production and delivery as one programme — which is usually the simpler way to keep finishes consistent from room to room.
Send us the wall dimensions, a screen size and the storage split you want, and we will come back with layout options, a specification sheet and a delivered-price basis for your destination. Enquiries start from our contact page.