Textured sliding panels solve a problem that flat wall finishes cannot: they give a room depth and pattern while still opening to reveal storage, a doorway or a screen behind them. That combination is why Santerson Textured Sliding Panels appear in villa media walls, bedroom closet fronts and room-dividing partitions. Because the panels move on a track and carry a surface texture that catches light, the installation plan matters more than it does for a fixed wall panel. A drawing that shows only the finished elevation will leave out the openings, clearances and hardware decisions that decide whether the wall works after handover.

The plan below is the sequence we use on residential wall system projects, from the first site survey to the final adjustment. It applies whether you specify one closet front or a full sliding partition across an open-plan living area.

1. Start with how the panels will be used, not how they look

Texture is the visible decision, but function sets out the panel sizes and the track layout. Before any drawing is issued, write down what each section of the wall has to do:

  • What sits behind the panels — hanging storage, a television recess, an appliance, a doorway, or an open display niche that stays on show while the rest closes.
  • How many panels must pass each other — a two-panel closet front and a four-panel partition need different track depths and different stacking zones.
  • Which direction traffic comes from — a panel that is convenient to slide from a bed side can be blocked by a door swing or a stair landing on the opposite side.
  • Who operates it daily — panel weight and handle position should suit the people using the wall, not just the drawing scale.

These answers drive panel width. Wide panels reduce visible joints but need heavier hardware and more clearance to stack; narrow panels are easier to operate but multiply the vertical lines in the texture. Decide function first and the width conversation becomes arithmetic instead of opinion.

2. Survey the substrate before sizing anything

Sliding panel systems are made to measure, so the survey is where accuracy is won or lost. A plan should record what the site actually gives you:

  • Floor level and finish height — the running track follows the floor line. Where screed or flooring has been laid unevenly, note the deviation so the bottom guide can be set out on site rather than assumed.
  • Ceiling build-up — record the depth of any bulkhead, cove lighting or services above the wall, because they limit how high a panel can travel and where an overhead track can be fixed.
  • Wall plumb and flatness — a textured front hides minor surface faults behind it, but it does not hide a wall that is out of plumb in plan; the stack zone will show the error.
  • Position of sockets, switches and fixed services — sliding fronts pass in front of them, so their set-out needs to sit inside a panel bay or in a fixed return, never under an opening edge.
  • Adjacent openings — skirting, architraves, radiators and door reveals that project from the wall reduce the usable run.

Where the wall meets other Santerson finishes — fixed textured panels, veneer cladding or a media wall — record the junction detail you want, because the fixed work and the sliding work are produced in the same package but installed in a different order.

3. Fix the track layout and clearances on paper

This is the drawing most often left out of a project file. The installation plan should show, in dimension:

Item to fix in the planWhy it belongs there
Track position in planShows whether panels run parallel to the wall face or return into a pocket, and how the track relates to floor finishes laid later.
Stack zoneThe area where panels park when open. It must be clear of furniture, door swings and light fittings for the whole life of the room.
Panel overlap at the closed positionDetermines whether the texture reads as a continuous surface or shows a shadow gap when shut.
Bottom guide or floor trackA recessed floor track needs a channel cut into the sub-floor; a surface guide is fixed after finishes. Choose before the floor is signed off.
Fixing substrate for the head trackRecord what the track bolts into — timber blocking, steel backing or a designed ceiling section. Nothing in the catalogue carries the load if the substrate is not built.
Access to servicesIf the panels cover lighting drivers, sockets or an appliance behind them, note how maintenance access is retained.

For a wall that also carries a screen, review Santerson Sliding Panel TV Systems at the same time as your plan: cable routes, ventilation to recessed equipment and the viewing angle have to be resolved before panel widths are frozen.

4. Specify the texture, material and finish selections together

Texture changes how a panel behaves in a room, so it should be selected with the material rather than chosen from a sample board at the end. Deep relief reads strongly under side light and can look flat under downlights; a fine texture does the opposite. Record on the plan:

  • The material and finish selected for each panel face, and which side is visible when the panel is parked open.
  • Edge treatment at the leading edge — this is the line your eye follows every time the wall moves.
  • Handle or recessed pull detail, and whether it interrupts the texture.
  • Lighting set-out relative to panel bays, so grazing light falls where you want relief visible.

Where a project needs the same surface without movement, matching Santerson Textured Panels can be produced in the same finish so fixed and sliding sections read as one wall. Where the brief calls for a room divider rather than a storage front, Santerson Partition Sliding Systems should be planned with its own track and floor conditions.

5. Sequence the installation around the other trades

A realistic plan states who does what, in order:

  • First fix — blocking and backing for head tracks, any recessed floor channel, and services routed behind the panel line.
  • Wet trades and floor finishes — completed and protected before the track is set out, since the finished floor level is the datum for the whole system.
  • Fixed walling and joinery — returns, niches and fixed panels installed so the sliding front can pass in front of them without fouling.
  • Track installation — set out on site against the finished floor and checked for level along the full run.
  • Panel hanging and adjustment — panels hung, then adjusted for vertical alignment and smooth travel across the whole stack.
  • Final check with the client — every panel opened and closed through its full travel, with soft-close or hardware operation demonstrated in front of the owner.

Our project workflow covers these stages from design coordination through production, logistics and on-site installation support; see Our Services for the scope we take on a wall system package.

6. Record what must be confirmed before production

Made-to-measure panels are cut once. The installation plan should carry a short confirmation block listing the items that need sign-off, so nothing is left to a site assumption:

  • Final opening widths and heights, taken after floor and ceiling finishes are complete.
  • Panel count, width of each panel and stacking direction.
  • Track type, hardware set and any soft-close or assisted mechanism for the selected panel weight.
  • Material, finish and texture selection per face, including the parked face.
  • Substrate responsibility — who installs blocking and backing, and when.
  • Junction details to floor, ceiling, adjacent fixed panels and any door reveal.

Common gaps we see in panel-wall plans

  • No stack zone shown. The wall opens on paper and hits a wardrobe or a sofa in the finished room.
  • Track fixed to nothing. Drawings show a head track but no backing behind the ceiling lining to bolt it to.
  • Floor datum assumed. A recessed bottom guide is drawn before the floor build-up is decided, and the channel never arrives.
  • Texture selected without lighting. An expensive relief surface installed where no light grazes it, so the effect disappears.
  • Sockets behind an opening edge. A switch becomes unreachable at exactly the position the panel parks.

Each of these is resolved on paper for the cost of a site visit, and costs far more once panels are in production. If you send us the elevation, the floor build-up and a note on what each section must do, we will return a panel layout with track set-out and hardware options marked for review before manufacture.