A swim spa that measures five metres long can be exactly right on one villa terrace and completely wrong on the next. Before you commit to a shell, cabinet finish or jet package, the site conditions and the project brief have to be settled — because those two things decide whether Outdoor Swim Spa WS-PC05CH is the correct model or merely the closest one in the catalogue. The paragraphs below walk through the project details that actually move the specification, using our configurable outdoor swim and hydrotherapy range as the reference point.

The short version: footprint and clearance, water depth versus intended use, the power supply available at the boundary, and how much of the equipment list you want fixed before order confirmation. Those four answers narrow a 60-model range faster than any brochure comparison.

1. The slab, the deck and the clearance you actually have

Catalogue dimensions for this model are 5000 × 3000 × 900 mm — a five-by-three-metre footprint with a shallow 900 mm shell height. That profile sits well on a terrace or a raised timber deck where a deeper spa would overwhelm the balustrade line or require retaining work. The first thing we ask a project team to send is not a mood board; it is an annotated site plan showing the pour edge, existing structural members, access routes for delivery, and the distance to the nearest wall or glazed façade.

Clearance matters more than the footprint itself. Service panels, the filter pump and the control system all need reach after installation, and a spa set flush into a deck with no access hatch becomes a maintenance problem within a year. If the space is irregular — an angled courtyard, a curved pool surround, a rooftop with a plant room intruding — we produce the shell in a customised shape instead of forcing a rectangle into it. Our Customizable Shape Outdoor Spa covers square, round, oval and curved layouts on an acrylic shell with structural reinforcement.

2. Water depth decides who the spa is really for

900 mm of water depth suits hydrotherapy, soaking and casual play far better than lap swimming. An adult cannot swim a proper stroke in that depth, so if the brief says "daily training without a pool", this is the wrong starting point. In our range the models that carry a listed swim training system sit in deeper shells — the 5000 × 2400 × 1470 mm configuration of the WS-PC05ST, for example, or the longer 7000 mm and 8000 mm units in the same family. Note that a deeper shell changes far more than the water level: the WS-PC05ST is rated at a materially higher total power draw and carries fewer jets, so trading depth against jet count is a real decision rather than a free upgrade. Where a client wants both a training current and a shallow lounging bench, we normally split the programme into two zones rather than compromise on one.

For hospitality projects the depth question has a second layer: how many bathers at once, whether children will use it unsupervised, and what the operator's own supervision rules are. A shallow shell with 30 jets across the interior reads very differently in a five-room boutique hotel than on a private estate, and the seating positions should be laid out around real usage patterns rather than jet count.

3. What the catalogue sheet lists — and what still needs confirming

Here is the specification as published for this model, before any project-specific changes:

ModelWS-PC05CH
Catalogue dimensions5000 × 3000 × 900 mm
Jet total30 pcs
Water pump / filter pump1 pc each
Control system1 set
LED lights1 pc
Total power2.45 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this model

Treat that table as a starting configuration, not a delivered scope. The published figures do not fix which equipment is included in your order or what the electrical installation has to provide, and both of those must be settled in writing against the drawings before production begins. A quotation that simply repeats catalogue numbers is the most common source of disputes on spa packages.

4. Power, insulation and climate at the site

A 2.45 kW total power figure is a modest load, but it is only meaningful once you know what the building can deliver: single-phase or three-phase at the boundary, the length of the cable run, earthing arrangements, and whether an electrician has already routed a dedicated circuit. On renovation projects we regularly see the spa specification finalised after the electrical drawings are frozen, which forces surface-mounted trunking that no designer intended.

Climate changes the equipment list too. Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — but availability and compatibility vary by model, so an option shown on one datasheet is not automatically offered on another. A spa in a cold-climate villa needs insulation and a heat pump sized against real ambient temperatures; the same shell on a covered courtyard in a warm region may need neither, and that decision belongs to the consultant, not to the catalogue.

5. How this unit fits a wider procurement package

Very few swim spas are ordered alone. On the villa and hospitality projects we deliver, the water feature is coordinated with poolside loungers, cabana daybeds, pergolas and hardtop structures, exterior wall cladding, and the flooring that runs up to the spa edge — all of which come from one supplier's production schedule. Coordinating those items under a single order removes the interface arguments between separate vendors: who levels the base, who protects the shell before handover, who replaces a damaged jet insert after the builder has finished.

Our Swimming Pools and Swim Spas range spans shallow relaxation shells through to eleven-metre units, so a single project can specify different models for different villas or room types without changing supplier. Where the architect wants a non-standard size or finish, our custom and OEM service covers bespoke dimensions, material finishes and branding — with flexible minimum order quantities rather than a fixed catalogue lot.

The six details to fix before you request a quotation

  • Site plan with dimensions and access routes — including the pour level, deck finish and clearance for service access.
  • Intended use — hydrotherapy and soaking, family use, or swim training. This decides shell depth before anything else is chosen.
  • Electrical supply at the boundary — phase type, available capacity, circuit routing and who owns that work.
  • Equipment scope in writing — pumps, jets, ozone, lighting, filtration, sterilisation, insulation, heat pump and steps, item by item.
  • Local climate and exposure — covered or open air, frost risk, wind and sun exposure, which drive insulation and heating choices.
  • Interface responsibilities — base preparation, delivery route, crane or lift requirements, and the handover inspection list.

Send us the plan and those six answers and we will confirm whether this model fits your project or which alternative in the range does. We quote against your drawings, not against a catalogue page, and every included item is listed line by line before production starts.

SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects since 2008. Contact PHILLIP on +86-13928214007 or santerson@qq.com to discuss a swim spa package for your project.