A concealed door looks simple on a drawing: a flush panel, no visible frame, no hardware, a clean wall. In the bill of quantities it is one of the least simple items to buy, because almost everything that makes it work sits inside the wall and is fixed before the joinery ever arrives. If your brief only says "concealed door, paint grade", the trade will fill the gaps with its own assumptions, and you will discover them on site when the floor levels are already set. This guide sets out what to put in a procurement brief for Santerson Decorative Concealed Doors so that the opening, the wall build-up and the finish are all agreed before production starts.

What you are actually buying

The decorative concealed door is listed in the Windows & Doors range and sits alongside Santerson Handleless Concealed Doors and Flush Wall Aligned Doors. The product page describes a made-to-measure door for residential projects, where the finish, layout and dimensions are specified per space, with material and finish options listed under configuration. That is the honest scope: it is a configurable, project-specific item rather than a catalogue unit with a fixed specification sheet.

Two practical consequences follow. First, you specify this door by describing the wall it belongs to, not by picking a model number off a price list. Second, anything technical — core build-up, hardware set, gap tolerance, load rating — is confirmed for your order rather than assumed from marketing images. Treat the product page as the starting point of a specification conversation and keep every figure you agree in the brief.

The six decisions to fix before you request a quotation

1. Opening size and the datum it comes from. Send clear opening width and height, plus the finished floor level the door is measured from. Made-to-measure sizing means the manufacturer works to your numbers, so state whether the dimensions are structural opening or finished opening, and say which drawing revision they came from. If a wall is still being set out, note that too — a concealed door ordered against a superseded setting-out drawing is an expensive mistake.

2. Swing, handing and hinge side. Confirm the opening direction, which face the hinges sit on, and whether the leaf is single or double. Concealed hardware means the handing cannot be corrected later by swapping a visible butt hinge, so have the architect's door schedule reviewed against the room layout before you lock it in.

3. The wall build-up around the leaf. A flush result depends on the substrate and the lining behind it being agreed with everyone: the framing contractor, the plasterer and the door supplier. Record what the wall is made of, where the reinforcement for the frame sits, and who supplies the architrave-free junction detail. If your project also uses Integrated Door & Paneling, decide early whether the door is being bought as part of a panelled wall system or as a standalone opening — the two routes change who coordinates the joint.

4. Finish and how it will be matched. The decorative route usually means the leaf takes the same finish as the surrounding wall: paint, veneer or another surface treatment. Name the finish explicitly and say what it is being matched to. Where a timber-look surface is specified, Wood Veneer Panels in the Paneling Systems range are the natural companion item, and asking for the door leaf and the panelling to be produced together keeps grain direction and tone consistent across the wall.

5. Hardware expectation. Concealed doors are usually specified with hidden hinges and either a concealed pull or no visible handle at all, which is the reason Santerson Handleless Concealed Doors are listed separately from the decorative version. Say what you expect the leaf to look like when closed, and what operating feel you want when open — flush pull, edge pull or magnetic push. Then ask the supplier to confirm the hardware set they are quoting for that result.

6. Threshold, floor covering and clearance. State the floor build-up at the opening and the final floor covering, because the undercut and the swing clearance depend on both. Where the same wall carries a Custom Niche Paneling reveal or a return, note it — the panel edge and the door edge need one detail, not two.

A brief template you can paste into your enquiry

  • Project type and location, plus the drawing revision the dimensions come from
  • Schedule of openings: width, height, swing, handing, quantity per room or unit
  • Wall build-up and frame reinforcement arrangement, with the junction detail reference
  • Specified finish and what it must match; veneer species and grain direction where relevant
  • Hardware expectation: concealed hinges, pull type, closed-leaf appearance
  • Floor build-up, floor covering, undercut and swing clearance at the threshold
  • Who signs off the setting-out, and who installs on site
  • Delivery split by phase or unit, and how each opening is labelled on site

Write the schedule room by room rather than as one long list. Concealed doors fail at handover when nobody can tell which leaf belongs to which opening, and a room-based schedule with matching labels solves that before it becomes a snag.

Where this fits in a wider package

Concealed doors rarely sit alone. On villa and apartment work they are usually bundled with the other joinery that reads as one wall: storage walls, media walls, wardrobes and panelling. Buying them inside a single furniture and building materials project procurement package gives you one party reconciling dimensions across the whole elevation, which is where consistency of reveal, shadow gap and finish actually comes from. The Windows and Doors range covers hinged, sliding, pocket and French doors as well, so openings that need to read as a set can be specified together instead of being split across three suppliers with three different tolerances.

If your project is coordinated through a turnkey route, the door schedule becomes one line in a larger package that also covers design coordination, production and site support. Either way, keep the door schedule as its own document — bundling the purchase should never mean blurring the specification.

What to confirm before you release the order

Ask for a shop drawing that shows the leaf in the wall build-up, with dimensions, gaps and the finish edge detail marked. Check it against your door schedule line by line, then have the framing contractor and the finishing trade sign the same sheet. Confirm the material and finish you are being quoted for each opening, since configurable listings can carry different options per item. And keep a record of every agreed figure in one place: with made-to-measure work, the written confirmation is the specification.

Get those six decisions into the brief and the concealed door stops being a site problem. The wall reads clean because somebody decided it would — early, on paper, and against a drawing everyone had signed.