A quote for smoked glass aluminum cabinets often comes back in one of two forms: a tidy number that hides half the decisions, or a page-long description that still leaves the frame profile, the glass make-up and the hardware unstated. Both create the same problem on site. The unit arrives, somebody asks what was actually agreed, and nobody can answer from the paperwork. The specification below is the list of items we need confirmed before production starts, written so a buyer, an interior designer and a factory workshop read the same document.

Start with the room, not the door

Aluminium frame cabinetry sits in wet and high-use zones — kitchen walls next to the sink, laundry joinery, bathroom vanities, pantry towers. That context drives the rest of the sheet. Note the room type, the wall finish behind the unit, whether the wall is true and square, and where services run. Frame depth, filler widths and how the carcass is fixed all follow from those answers.

  • Room and exposure: kitchen, laundry, pantry, bathroom vanity or a built-in wardrobe run in the bedrooms.
  • Finished floor level and finished ceiling height, plus the location of doors, skirting and cornices that the unit has to return around.
  • Position of water, waste, power, rangehood ducting and any appliance that will be built in.
  • Wall construction and flatness tolerance, because an aluminium frame shows a bowed wall more clearly than a painted panel does.

Send the drawings you already have — elevations, a reflected ceiling plan if there is feature lighting above the run, and photographs of the existing condition. Where a dimension on the drawing is not confirmed on site, mark it as provisional instead of guessing; we will flag it during the review.

Name the glass you actually want

"Smoked glass" describes a tint family, not one product. Two projects can order the same words and receive visibly different panels. Put the make-up on the sheet in plain terms so the sample and the production batch match.

ItemWhat to state
Tint and toneGrey/smoked tone, and how deep it reads. A photo reference of the panel you approved is worth more than a colour name.
Surface treatmentClear smoked, frosted/acid-etched, ribbed or laminated. Frosted and ribbed glass diffuse light differently from clear tinted glass behind the same frame.
Thickness and safety make-upPanel thickness, tempered or laminated construction, and whether the panel is exposed to frequent contact (children, commercial traffic, a shared laundry).
Edge treatmentPolished edge, seamed edge or an edge that sits fully inside the rebate. Visible edges are a design decision, so decide them before quoting.
Visibility intentHow much of the contents should show. If glass fronts are there to display glassware, choose clearer glass; if they hide stored items, choose a deeper tint or an etched face.
Interior lighting interactionWhether there is lit shelving behind the panel. Tinted glass in front of a light source needs the fitting specified with it, including where the driver sits and how it is accessed.

Related finishes in the same collection are worth comparing on one sample board rather than on screen: frosted glass aluminium cabinets and glass front aluminium frame cabinets behave differently under the same lighting, and a physical board settled in one review meeting removes most of the arguments later.

Specify the frame and how it meets the glass

The frame is where the cost and the look are decided. State the profile on three counts: width, depth and finish.

  • Profile width — a slim sightline and a heavier rebate need different aluminium extrusions and different glass rebates; both change the price.
  • Frame colour and finish — anodised, powder-coated or wood-effect, with the reference stated by name and shown on a sample.
  • Mitre quality and hardware — corner joint type, hinge or slide system, soft-close where required, and whether handles are integrated or omitted for a handleless look.
  • Frame-to-carcase relationship — which carcass the door hangs on, and whether the carcass and the frame come from one supplier so tolerances match.

If part of the run needs solid doors and only the upper section is glazed, say so explicitly. Mixed fronts in one elevation are common — aluminium frame with solid panel is specified for the closed sections while the display bays stay glazed — and a single line item covering "all doors" is where variation orders start.

Lock down sizing, layout and interface details

Our kitchen cabinetry in this collection is made to measure: finish, layout and dimensions are set per project rather than picked from a fixed module list. That flexibility only pays off if the numbers arrive complete.

  • Overall run length, height and depth at every elevation, with critical minimums called out (appliance clearances, walkway width, door swing).
  • Internal fit-out: shelf heights, drawer stack configuration, pull-out trays, pantry racking, lazy-susan or corner mechanisms, and any cut-outs for appliances.
  • Interface items — benchtop thickness and material, splashback edge condition, plinth or full-height return, scribe details at the ceiling.
  • Where a matching wardrobe run continues into bedrooms or a dressing room, specify it as part of the same package so frame colour, glass tint and hardware carry across; see smoked glass aluminium frame wardrobes for the wardrobe version of the same look.
Confirm before production: dimensions and selected specifications are re-checked against site conditions at each project. Any dimension taken from a drawing rather than measured on site should be listed as to-be-verified, so nobody treats it as fixed.

Put the commercial terms in the same document

A specification that stops at materials is incomplete for an imported package. Add the items that decide whether the delivery date holds.

ItemWhy it belongs on the sheet
Sample approval recordDate, approver and the physical sample reference for glass tint, frame finish and hardware.
Split of responsibilitiesWho supplies benchtops, appliances, sinks, taps and lighting, and who installs each.
Packaging and set-outCrate marking keyed to elevation labels, so the site team knows which crate is which run.
Delivery terms and destinationPort or site delivery, who handles customs clearance and local cartage, and the storage plan if the site is not ready.
Change controlThe cut-off after which a glass or frame change re-opens the order; late tint changes are the most expensive ones.
Snag and replacement routeHow a damaged panel is reported and replaced, and what spare panels to hold on site for a glazed run.

Freight, customs paperwork and door-to-door delivery are part of our service scope, and the exact terms — incoterms, duties, transit time and who carries each leg — are confirmed project by project rather than assumed from marketing material.

A short pre-production checklist

  • Room, wall condition and service locations recorded; provisional dimensions marked as such.
  • Glass tint, surface treatment, thickness, safety make-up and edge treatment named, with an approved physical sample.
  • Frame profile width, finish reference, joint type and hardware set stated per door type.
  • Glazed bays and solid-front bays separated in the schedule, elevation by elevation.
  • Internal fit-out, cut-outs and interface details listed.
  • Matching wardrobe or laundry runs tied to the same finish references.
  • Sample approval date, responsibility split, packaging marks, delivery terms and change cut-off recorded.

Send that sheet with your drawings and you will get a quotation that can be compared line for line against another supplier's — which is the point of specifying at all. If you are assembling a wider package around smoked glass aluminium cabinets, including lighting, wall finishes and joinery for the same building, we can coordinate those as one production and delivery plan.

Talk to our project team about your cabinetry package — room dimensions, drawings and the finish references you have approved are enough to start a made-to-measure quotation. Contact details are on our contact page.