A wall system that moves is harder to specify than a wall that does not. Before a quotation for Santerson Acoustic Sliding Panels can be built around your space, someone has to decide what the panels are supposed to do, where they travel, and how far they may travel. The list below is the set of measurements and project inputs we ask buyers, designers and contractors to send with an enquiry, so that one round of drawings replaces three rounds of email.
Start with the opening, not the panel
Send the clear opening width and height in millimetres, measured at three points across the width and at two points down the height. Out-of-plumb walls and uneven floors are normal on site, and the smallest of the three readings is what governs a made-to-measure system. Note the ceiling type as well — a plasterboard ceiling, an exposed slab and a suspended grid each take a different track support detail.
Then state how the panels are expected to move: stacked to one side, bi-parted from the centre, or parked into a pocket. The parking position determines the stack depth, and stack depth is the number most often discovered too late. A run of panels that cannot park without covering a doorway or a light switch has been specified wrongly, however good the finish looks.
Fix the reference levels and the floor condition
Confirm which finished floor level the heights are measured from, and whether that level is already final or still to be built up. A 25 mm change in the finished floor changes every panel height on the drawing. If panels run floor to ceiling, say so explicitly — a full-height panel needs a structural head condition above it, and that condition has to be verified before production rather than at installation.
Describe the floor covering along the track line: timber, tile, stone or carpet, and whether a threshold is allowed. Track fixings and thresholds are decided by the floor build-up, not by the panel.
Decide what the panels must do acoustically
"Acoustic" is a job description before it is a material choice. Write down the situation you are solving: a meeting room that needs privacy from an adjacent lounge, a bedroom opened to a study, a media corner in a villa living area, or a partition between two functions in one room. Then state what has to be blocked — speech, television, music — and whether the separation is needed only when the panels are closed.
Gaps matter as much as the panel core. Perimeter seals, meeting stiles and the track line are where sound travels, so tell us whether the closed wall needs to seal against the side walls and the head. For any configuration where a measured performance level is required for the project, we confirm the construction and its tested data for that specific build during specification; the catalogue page does not carry a single blanket figure for every size and finish combination.
Specify the finish against the room, not the sample
Sliding panels are read as wall, so match them to what surrounds them. Send the wall finish schedule — paint colour reference, veneer or laminate selection, stone or glass details — and tell us which surfaces must continue across the closed panels without a visible break. Where the same space also uses Santerson Acoustic Panels on fixed walls, we can align the finish of the moving leaves with the fixed panelling so that the closed wall presents one continuous face.
Send hardware preferences too: handle style, whether a flush pull is required so nothing projects into a circulation route, and the locking or latching requirement if the closed wall needs to be secured. If the panels double as storage fronts or conceal a media position, say so — that changes both core and hardware, and in some layouts Santerson Sliding Storage Panels is the more direct answer.
Add the surrounding project information
Along with dimensions, send the room's function and occupancy, the number of panels you expect to operate daily, and any other openings in the same wall — doors, windows, skirting changes, trunking. If the panels sit opposite glazing, note the solar exposure, because finish choice near glass is a decision people revisit after handover.
For multi-unit or multi-room work, list each opening separately with its own measurements and finish reference. Identical-looking openings on the same floor plan regularly differ by tens of millimetres on site, and made-to-measure panels follow the site readings, not the drawing grid.
How the enquiry becomes a production drawing
With those inputs, SANTERSON prepares the layout, panel split, stack position and finish schedule for your confirmation before anything is cut. Our interior design and project coordination service covers space planning, drawings and production coordination with on-site guidance; where the panels are part of a wider fit-out — cabinetry, wall panelling, doors, flooring — they are coordinated in the same package rather than ordered as an isolated item.
Send your opening dimensions, parking preference, acoustic intent and finish schedule to us, and we will return a configuration drawing with the panel build for that specific span. If you are still deciding between fixed and moving acoustic treatment, tell us which; we will recommend the option that suits the geometry rather than the one that sells more easily.