When a villa or apartment programme specifies Santerson Decorative Interior Doors, the door is not picked off a shelf. It is manufactured to the opening sizes, finish schedule and hardware layout of that particular project. For buyers, contractors and interior fit-out teams, the practical question is what happens between the first drawing pack and the day the doors are hung on site. The steps below follow the service stages SANTERSON publishes for custom and OEM work.

What “OEM” means for a decorative interior door

A decorative interior door is a visible surface in every room, so two projects rarely order the same one. In an OEM arrangement the manufacturer builds to your documentation rather than to its own catalogue: your panel layout, your colour or veneer, your frame detail, and where relevant your branding on packaging and labelling. SANTERSON describes this as custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation or private labelling.

For a buyer that distinction matters commercially. You are buying a configurable product with made-to-measure sizing and material and finish options, quoted against your drawings — not a fixed stock item with a published price. The same logic applies whether you are ordering a feature door for one villa or a repeating door set across an apartment block.

Stage 1: Brief, drawings and the door schedule

Everything starts with information the factory can build from. A useful enquiry pack for decorative interior doors normally contains:

  • a room-by-room door schedule: opening width and height, wall build-up and floor finish levels, quantity per type;
  • the intended leaf style — flush, paneled or decorative — plus the direction of swing and whether the frame is to sit proud of or flush with the wall;
  • a finish reference: paint colour system, laminate or veneer species and grain direction, glass type where the design includes glazing;
  • hardware assumptions — hinge positions, lock prep, ironmongery you intend to supply yourself versus items sourced with the door.

SANTERSON’s interior design service covers space layout planning, concept design and 3D visual renderings, and project design coordination including drawings and production coordination. Where your own drawings are already complete, that stage collapses into a technical review instead.

Stage 2: Specification, prototyping and quotation

The factory reads the pack and comes back with questions before it prices anything. Typical points resolved at this stage are core and substrate construction, edge detail, frame width, whether decorative mouldings are applied or routed, and how finishes will be sampled and approved. The Custom & OEM service mentions 3D modelling and prototyping, material choices such as wood, metals, engineered stone and laminates, and branding options including engraving, embossing, logos and packaging.

Expect the quotation to settle only once these variables are confirmed. A door with a specified veneer matched across a whole floor, for example, is priced differently from one where any similar grain is acceptable. Three habits save time at this stage:

  • approve a physical finish sample before volumes are released, and keep it on site as the reference for inspection;
  • record which approved sample each door type refers to, so substitutions can be refused at delivery;
  • freeze the schedule before production starts — late changes to sizes or swing direction affect both cost and the production sequence.

Stage 3: Production and quality control

SANTERSON is a China-based furniture and building materials manufacturer, so doors are produced within the same operation that makes the joinery, wall panelling and cabinetry they will sit next to — useful when you want matching veneers and consistent paint systems across trades. The company describes turnkey scope from design and production through to door-to-door delivery, with manufacturing and quality control named as a defined stage of project work.

During manufacture the buyer’s role is narrow but real: sign off approved samples, answer shop-drawing queries promptly, and confirm any tolerance decisions where site openings differ from the drawings. Where openings vary, made-to-measure sizing is exactly what makes an OEM order work — but only if the measured figures are the ones used on the shop drawing.

Stage 4: Packaging, freight and customs

Doors, frames and architraves are bulky and easily damaged at the corners, so packing is part of the specification. SANTERSON’s logistics service lists global freight forwarding by sea, air and rail, packaging and container loading, customs paperwork such as commercial invoices, packing lists, certificates of origin and import permits, shipment tracking, and door-to-door delivery.

Before you commit to an Incoterm, confirm for your own project the freight mode, transit time, insurance arrangement, duties and the exact point where delivery responsibility ends. Import rules and duty treatment vary by destination, and a landed-cost comparison is only as good as the assumptions inside it.

Stage 5: Receiving, storage and installation

Inspection works best when it is planned rather than improvised. On arrival, check each consignment against the packing list while the packaging is still available, photograph any damage before signing, and record leaf numbers against the door schedule so the site team knows where each unit goes.

Storage conditions then decide how well the doors stay true: keep leaves flat and dry, acclimatised to the internal environment, and off the floor until hanging. SANTERSON lists on-site installation, inspection and snags, warranty coverage, spare parts or replacement, and ongoing maintenance as after-sales services. Ask which of these apply to your project, in which territory, and what the warranty covers and excludes before installation begins.

Buying doors inside a wider package

Doors rarely fail on their own; they fail at the junction with wall finishes, flooring and skirting. Sourcing them through an one-stop furniture and building materials supplier lets one team coordinate the door leaf with wall panel systems, engineered flooring and built-in joinery, which reduces the number of trades arguing over tolerances. For hospitality work, that coordination is also why a matching veneer can be carried from a guest-room door into the wardrobe front and the headboard panel.

Related door types in the same range include Santerson Flush Interior Doors, Santerson Flush Hinged Doors and Santerson Modern Slim Frame French Doors. Specifying them together keeps frame details and finishes consistent from room to room.

What to send when you start an enquiry

A short, complete pack gets a usable answer faster than a long conversation. Include the door schedule with measured openings, the finish references, your target installation window, the destination for delivery, and the quantity bands you are working to — the first phase now, the full programme later. From there the process is the one already described: technical review, sample approval, confirmed quotation, production, freight, then inspection and hanging.

Because every configuration is project-specific, prices, lead times and service coverage are quoted case by case rather than published. Send your drawings and schedule to SANTERSON for a specification review and a quotation built on your own numbers.