A finish sample is the cheapest decision you will make on an outdoor swim spa, and also the one most often skipped. Once the shell of an outdoor swim spa has been formed and the cabinet panel cut to size, changing a colour or a surface texture means rework, replacement parts, or a unit that ships and gets argued about on site. Before we open production for your WS-115EⅢ-U, here is exactly what we send you, what you should be checking on it, and what still needs confirming on paper.
Why the finish sample comes before the order confirmation
WS-115EⅢ-U is a configurable unit in our outdoor swim and hydrotherapy range. The catalogue lists it at 5280 × 2200 × 1250 mm, with water jets, LED lighting and ozone among the features shown for this model, and options such as control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Because that list is assembled per project rather than fixed, two WS-115EⅢ-U units can leave our line looking quite different. The sample review is the point where those differences get settled in writing instead of being discovered later.
For villa gardens, terrace installations and resort grounds — the settings this size of unit usually goes into — the finish also has to sit next to finishes you have already bought: decking, stone coping, pool tiles, exterior paint. A sample lets you hold our surface against those materials in daylight before anything is committed.
What we prepare for your review
Send us the finish direction you want — a colour reference, a project drawing, or simply the surrounding materials — and we return physical pieces rather than a screen image. On a unit like this there are typically three separate surfaces to sign off:
- The shell interior. This is the surface you see and touch from inside the water. Check the colour under both wet and dry conditions, since a shell reads darker when it is filled.
- The cabinet exterior. The cladding that stays visible on the terrace. Panels are made to size for the selected configuration, so once the finish is fixed the panel order follows.
- Hardware and trim tones. Jets, control panel surround, steps and lighting fittings each carry their own tone, and a mismatch between them is more obvious in daylight than on a brochure photo.
Alongside the pieces you receive our written note of which option each sample corresponds to. Keep that note; it becomes the reference for production inspection.
How to check the samples properly
A few practical checks are worth running before you sign:
- Judge it where it will be installed. Photograph the sample in the actual location, at the time of day the spa will be used. North-facing terraces and covered pergolas shift colours noticeably.
- Compare against your fixed finishes, not against memory. Hold the sample against your decking board, coping stone or tile offcut. If they are being bought separately, get those samples to hand before signing ours.
- Look at it wet and dry. Fill a shallow tray and submerge part of the shell sample. Colour depth and gloss change under water.
- Check texture, not just colour. Run your hand over the surface. A smooth or lightly textured finish behaves differently underfoot and under cleaning.
- Sign the version, not the idea. Approve the specific piece we sent, with its reference number, by email. Verbal agreement on "the grey one" is where disputes start.
One more thing worth checking while the samples are still in your hands: confirm what is actually included in the quoted configuration. Heat pumps, insulation and sand filtration appear as options across this range rather than as standard fittings on every model, so if your specification assumes them, have that confirmed before you sign anything off.
What still needs confirming alongside the finish
Finish approval does not close out the technical side, and it is worth handling both in the same exchange. For WS-115EⅢ-U the catalogue shows a control system of 1 set, 3 water pumps, 1 filter pump, 24 jets, 2 LED lights and a total power figure of 9.65 kW, while the swim training system is not listed for this configuration. Treat those as catalogue figures for the standard specification: which equipment is included in your quote, and what electrical supply your site can provide, should both be confirmed against your selected configuration before production opens. If you are weighing up a different length or depth — we list several other sizes in the same range, including WS-115AⅢ-U and WS-115FⅢ — tell us now, because the sample set changes with the model.
If your project needs a non-standard shape or a hydrotherapy pool built around a specific footprint rather than a catalogue model, our customizable shape outdoor spa line follows the same sample-first approach.
Where this sits in our project workflow
Sample review fits between detail confirmation and production. Our custom and OEM service covers bespoke material finishes and textures alongside sizing, so a finish request that falls outside the standard options is handled here rather than later. Once you approve, that approved reference becomes the production standard for your order: the unit goes into manufacturing with it attached, and any change you want after that point needs to be raised before cutting starts, because we will have to quote its effect on the schedule.
For buyers coordinating several product groups on one project — spa, outdoor furniture, cabinetry, lighting — sample approval is also the moment when finish consistency across categories gets checked together. As a one-stop furniture and building materials supplier, we would rather reconcile those tones once, on samples, than across three separate deliveries.
Ready to start your sample set?
Send us the model you are specifying, the site conditions, and any finish references you already hold. We will confirm which configuration options apply to WS-115EⅢ-U for your project and prepare the samples for review before production planning begins. Contact us to open a sample request.