Open modular wardrobes work well in villas, apartments and hotel bedrooms because the storage layout can be adjusted room by room instead of being locked into one fixed cabinet run. Because each set is made to measure, the quality of your enquiry decides how quickly you get a usable price. The information below is what our team needs to turn a drawing or a set of site dimensions into a quotation for open modular wardrobes and the matching built-in joinery around them.

Start With the Room, Not the Product Code

The Modular Wardrobes collection covers several layout directions, and buyers often mix them in one bedroom. Before writing to us, decide which pattern your space needs:

Naming the pattern you prefer is not a commitment. It gives us a starting point, and we will confirm dimensions and selected specifications for each project before production begins.

What to Send in Your Enquiry

A quote request that includes the following items usually comes back with a clear price and a build-up, rather than more questions:

ItemWhy it matters
Room elevation or floor plan, even a hand sketch with measurementsSets the overall width, height and depth of each wardrobe run and shows where skirting, cornices and architraves interfere.
Finished floor level and ceiling heights per roomFloor-to-ceiling runs need different detailing than a set that stops below a window head or a bulkhead.
Internal layout preference: hanging, shelves, drawers, or a mixDrives the carcass split and hardware count, which is where most of the price difference sits between layouts.
Material and finish selectionOur wardrobe collections are listed in melamine, lacquer, veneer and solid wood finishes, so state the surface you want: it changes both price and production time.
Quantity of sets and the number of rooms or unitsMulti-unit projects are packaged and shipped differently from a single villa bedroom.
Delivery city, site access notes and who receives the goodsLets us quote freight and door-to-door delivery to your site rather than to a port only.
Programme dates: on-site measurement, installation and handoverProduction is scheduled against the site programme, so early dates keep the joinery off the critical path.

Confirming Materials and Finishes

Wardrobe fronts age visibly, so finish selection deserves a decision rather than a note in passing. If you want a seamless, ultra-simple surface, our custom minimalist bedroom wardrobe option uses flat panels and an optional handleless front for apartments, villas and hotel bedrooms. For a warmer timber look in the same made-to-measure format, walnut solid wood wardrobes are specified on villa projects where the joinery has to sit alongside timber flooring and wall panelling.

Where a bedroom opens into a dressing area, wardrobe fronts rarely stand alone. The same panel language can be carried through boutique style walk in wardrobes, island units and niche shelving so the storage wall, the door reveals and the panelling read as one detail. Send photographs of the adjoining finishes if you want the tones matched.

How the Quote Is Prepared

Wardrobe enquiries follow the same sequence as our other custom work, from custom and OEM service through to site handover:

  1. Brief and proposal. We review your drawings, ask about anything the drawing leaves open, and propose a layout with material options.
  2. Quotation and detail confirmation. You receive priced layouts. Dimensions, finishes, hardware and internal fittings are confirmed in writing before any cutting starts.
  3. Production and shipment follow-up. Panels are made to the approved drawings, packed for the site, and shipped with logistics and door-to-door delivery arranged to your address.
  4. Installation and after-sales. On-site installation and inspection are coordinated with your builder, followed by installation and after-sales support for snags and spare parts.

For projects that need more than wardrobes, the same drawings can carry kitchen cabinetry, vanities, doors and panelling in one package. That is where a turnkey furnishing scope saves coordination time: one factory handles the joinery trades instead of several suppliers interpreting the same drawing set.

Questions Buyers Ask Before Committing

Can you quote from a plan alone? Yes, for budget and tender stages. Final production dimensions come from site measurement or an approved as-built drawing, because modular carcasses are built to the confirmed opening sizes.

Can one enquiry cover several room types? Yes. List rooms separately with their own elevations and quantities; we price each run so you can compare or phase them.

What if the site dimensions change after the order? Tell us before production release. Once panels are cut to approved drawings, changes are handled as a variation rather than a free edit.

Send Your Enquiry

SANTERSON is a China-based furniture and building materials manufacturer working with project customers since 2008. Our published project cases include villa work in Sydney, Melbourne, Perth and North Turramurra. Send your drawings, room list and target programme through our contact page, or reach us directly on WhatsApp at +86-13928214007 (PHILLIP) or by email at santerson@qq.com. We reply with layout options and a priced quotation for your open modular wardrobe package.