A solid colour melamine wardrobe looks simple on a drawing: flat doors, one colour, clean lines. That simplicity is exactly why orders go wrong. With no grain and little moulding to hide behind, every dimension, edge and colour has to be right the first time. Before you place an order, here are the questions worth putting to your supplier.

1. Is the wardrobe made to your measurements, or to a standard module?

Ask early whether the unit is built around your room or whether you are being sold a fixed module that has to be trimmed into place on site. Santerson's Solid Color Melamine Wardrobes are made-to-measure: the sizing, layout and finish are specified to suit each space and each project, and the dimensions and selected specifications are confirmed with you before production.

Practical follow-up questions: who takes the site measurements, who produces the shop drawings, and at what point do you sign them off? In a villa or apartment fit-out, signed drawings are the cheapest insurance you can buy.

2. Which solid colour, and how is that colour being confirmed?

"Solid colour" covers a very wide range of neutrals, greys and deep tones, and the same name can look different from one board run to another. Ask for a physical finish sample in the exact colour you have chosen, viewed in the lighting of the actual room. Then ask what happens across a multi-room order: are all door panels produced in one production batch so that a bedroom set and a hallway set match?

If you are also ordering Matte Finish Melamine Wardrobes or Textured Melamine Wardrobes elsewhere in the same project, request those samples at the same time and check the sheen levels side by side. Matte surfaces also show fingerprints and scuffs differently from a textured surface, which matters in a shared family hallway.

3. What is the substrate, and how are the edges finished?

Melamine is a decorative surface layered onto a board core. The two things that decide how the wardrobe wears are the core board and the edge banding. Ask which board is used for the carcass and doors, and how the edges are banded — continuous machine-applied banding with a tight joint line holds up far better in daily use than a hand-finished edge.

Then ask about the details that get left out of a quotation: internal shelf edges, the back panel thickness, and how cut-outs for skirting boards or pipes are sealed. These are small items individually, and they are the ones that fail first.

4. What layout and interior fittings are included in the price?

A wardrobe price is only comparable when the inside is specified. Ask what is included as standard and what is charged extra: hanging rails, shelf runs, drawers, soft-close hardware, pull-out baskets, lighting, and any mirrored or glass inserts.

  • How many drawers and rails are priced, and at which widths?
  • Which hinge and slide brand is quoted, and can it be upgraded?
  • Are the doors hinged or sliding, and is there enough clearance for the chosen opening on site?
  • Is integrated interior lighting included, and where does the transformer sit for servicing?

Where a standard layout does not suit the room, ask about bespoke work. Santerson's Custom Furniture Design and Prototyping service covers custom furniture design and prototyping, bespoke material finishes and textures, 3D modelling, and OEM manufacturing with flexible minimum order quantities — useful when a project needs a specific colour or handle detail repeated across several room types.

5. How is the wardrobe delivered, and who installs it?

Built-in joinery is where logistics and site trade have to meet, so treat delivery as part of the product. Ask whether the wardrobes arrive flat-packed or assembled, how panels are protected for ocean freight, and which port or site door the delivery reaches. Santerson handles freight by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery.

Then pin down the installation sequence: who prepares the walls and floors beforehand, whether on-site installation is included, how snags are inspected at handover, and what spare parts are available later for a replaced door panel or drawer front. Confirm the warranty terms in writing, including what is excluded.

6. What is quoted, and what changes the price later?

Ask for an itemised quotation rather than one line per wardrobe. The items that move a price after the order are usually the ones left out of it: hardware upgrades, non-standard depths, delivery to a restricted site, and revisions made after drawings have been signed off.

Ask your supplier to state the change-control point in writing — the moment after which a drawing revision is charged. That single clause settles most disputes before they start.

7. Can you see this product type in a completed project?

Ask for photographs and drawings of the same wardrobe type already installed, ideally in a similar room and setting. Published project work is a useful starting point: Santerson's Australian Villa Furniture Projects page includes villa cabinetry and joinery projects in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Ask which of those involved the finish you are specifying, and check the scope of each case rather than assuming a like-for-like match.

Before you send your enquiry

A complete enquiry gets a comparable quotation. Include room photographs and measurements, ceiling heights and where they vary, wall construction, the skirting and cornice detail, the number of doors you expect, your preferred opening type, and the colour or finish sample reference you are working from. If you are furnishing several rooms at once, send the full room list so the wardrobes, interior fixtures and cabinetry can be produced in one coordinated batch.

Santerson is a China-based furniture and building materials manufacturer operating since 2008, supplying custom and OEM products for villa, hospitality and office projects worldwide. Send your drawings and finish references to the team and we will confirm dimensions, specification and pricing for your project before production begins.