A floating modular system looks simple on a mood board: a run of wall-hung units, clean shadow gaps, some open shelving balanced against closed storage. On site it is one of the least forgiving things to get right, because everything about it — bearing, level, service runs, finish edges — is fixed to the wall before the first unit arrives. The customized furniture listing for this system — the Santerson Floating Modular Systems page — is a configurable product: layout, dimensions, materials and finishes are set per project rather than chosen from a fixed catalogue size. That freedom is exactly why the pre-production conversation matters. The questions below are the ones we ask buyers, designers and contractors on villa and hospitality projects, and the answers you give us change what we build, how it packs and who installs it.

1. Wall construction and fixing method

Wall-hung units carry their load into the substrate, so the wall build-up is the first item on the agenda, not a detail left to the installer. Tell us what is behind the finished surface — masonry, concrete, light-gauge steel stud with lining boards, timber framing, or a tiled or stone-clad background — and whether the design calls for concealed brackets, a French-cleat rail or a recessed face frame.

Two practical outcomes follow from this. Where the substrate cannot take the point loads of a fully loaded unit, we add a backing batten or transfer plate behind the wall finish so the load lands on solid material rather than plasterboard. Where services are already in the wall, we shift the hanging points instead of asking the site team to move pipework or trunking at the last minute.

2. Layout, proportions and how the run is broken up

Send us the wall elevation with room dimensions, not just a reference photograph. We need overall run length and height, plus the position of doors, windows, skirting, radiators, switches, sockets and any ceiling rebate that limits the top unit.

  • Module widths: whether you want regular bays or deliberately unequal composition — for example a wide low drawer bank under a window with narrower tall units at the end of the run.
  • Open-to-closed ratio: how much display shelving you actually intend to keep tidy. On lived-in villas we usually push more volume behind doors than the first sketch suggests.
  • Unit break positions: where a joint is acceptable and where it must be hidden, because that decides whether we deliver one assembled box or a case with an internal dividing panel.
  • Adjacent trades: stone benchtops, fireplace surrounds, plaster returns and joinery from another supplier all need the interface dimension agreed before drawings are signed off.

If the same logic needs to continue into a bedroom or study, we build the matching shelving in the same batch so material batch, edge treatment and door profile stay consistent — see Santerson Floating Modular Shelves, or for a run that has to reach the ceiling instead of floating, Santerson Floor to Ceiling Modular Systems.

3. Materials, finishes and edge detail

Our Custom & OEM Service covers bespoke material finishes and textures, so the finish conversation goes deeper than a colour name. For carcasses we work with engineered boards and laminates; for doors you can specify lacquered surfaces in matte or high-gloss, wood veneer, acrylic, melamine or textured panels. Please send finish references as physical samples or as manufacturer codes with the sheen level stated — a photograph of a door under studio lighting is not enough to match a run of six.

Decide these at the same time as the colour, because each one changes the drawing:

  • Door profile and edge: flat slab, rebated panel or a routed shape; square edge or a small radius on high-traffic corners.
  • Handle strategy: handleless groove, integrated pull, pivot knob or push-to-open — the groove depth has to suit the hand and the drawer weight.
  • Exposed versus concealed edges: which faces are visible from the room, so we edge only what needs edging and finish the return properly.
  • Grain direction: running vertical or horizontal across a run changes how joints read, and it must be shown on the elevation.

4. Interior configuration and hardware

What sits inside is where daily use is won or lost. Tell us the intended contents — glassware, books, linen, tableware, files, bar stock, AV equipment — because that sets shelf spans, drawer depths and load ratings. Long spans carrying heavy books behave differently from the same span carrying decorative objects.

Element What to specify
Shelving Fixed or adjustable; pitch of the adjuster holes; whether shelf heights need to clear a specific item such as a decanter or a record sleeve.
Drawers Depth, runner type, soft-close, full extension, and any dividers or cutlery trays.
Doors Hinge hand, opening angle, reveal between doors, glass type if glazed, and whether shelves behind the door are visible when open.
Display areas Niche depth for objects, plus integrated cabinet lighting with the driver located where it can be reached.
AV and equipment Device dimensions, ventilation gaps, cable routes and remote-control line of sight through any glazing.

For hospitality work we also confirm the housekeeping reality: whether doors need to stay open flat for cleaning, whether glass fronts are acceptable in high-traffic corridors, and whether locks or stays are required on guest-facing units.

5. Lighting and electrical coordination

Integrated lighting has to be designed with the case, not added after it. Decide which bays are lit, whether the light is top-shelf downlight, vertical wash or a hidden strip behind a shadow gap, and where the driver and any sensor sit — drivers need access panels, and recessed drivers in a wall-hung carcass must be reachable without taking the unit down. If the scheme also needs loose fixtures elsewhere in the room, our lighting products range is built in the same batch, so metal tones and trims line up between the cabinet strips and the pendants or wall lights.

Then hand us the electrical detail: voltage, local supply standard, switching method, dimming protocol if the system ties into room control, and where the site electrician will terminate. We prepare cable routes and drilled back panels to match; a mismatch found after painting is expensive to fix.

6. Site conditions that decide tolerances

Floating systems expose wall imperfection, so we want the site reality before manufacturing: finished floor level, whether screed or floor finishes are still to go down, wall plumb and square within the run, and the setting-out line you want us to work to. Where walls are out of plumb we can scribe, add a filler bay, or design a shadow gap that absorbs movement — but only if we know in advance.

Also confirm what sits above: ceiling height, cornices, recessed lighting downstands and any structural beam. These determine the top module and often the whole visual proportion of the composition.

7. Sampling, drawings and sign-off

Our stated cooperation steps are project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For a floating modular run we use that sequence to produce shop drawings with setting-out dimensions, elevation views, hardware schedules and finish callouts, for your countersignature before cutting. Where the specification is new — an unusual veneer, a bespoke handle groove, an unusual glass fixing — we would rather make one sample corner or one mock-up bay than argue about it on site.

Sign-off points to name in advance: approved finish sample, approved setting-out drawing, approved hardware schedule, and the agreed method for checking level and reveal on delivery.

8. Packing, delivery sequence and installation

Modular units are unpacked, carried and lifted in the order they will be hung, so packing is a design decision. Tell us the access route: lift dimensions, stair widths, corridor turns, whether the goods arrive before or after floor finishes and paint. We pack by bay with numbered labels matched to the setting-out drawing, and glazing and lit sections travel separately where that reduces damage.

Agree who sets out and fixes the rails, and at what stage the wall is accepted as ready. Our installation and after-sales support covers on-site fitting, inspection and snag resolution; if your own crew installs, we send fixing details and a tolerance guide with the shipment so both sides work from one document. Our logistics and door-to-door delivery service handles freight documentation and container loading, but the site date still has to be realistic for a made-to-measure item.

9. Commercial terms worth settling early

Because these systems are made per project, quantity and phasing affect price more than on catalogue items. Settle: the total number of bays after value engineering; whether one run is split across phases or rooms; minimum order quantities for a bespoke finish or glass type; Incoterms and who carries duty; replacement-part arrangements for hinges, runners and drivers; and the spare-parts list you want held on site.

If your company intends to repeat this system across several units — an apartment scheme or a villa portfolio — say so at the first enquiry. Repeating one approved module set through OEM furniture manufacturing keeps later batches consistent and avoids paying for new prototyping each phase.

A short brief template you can copy

Send us these eleven items and we can quote properly:

  1. Wall elevation with overall length, height and finished floor level.
  2. Substrate type and fixing method you prefer.
  3. Open/closed split per bay, with drawer counts.
  4. Finish references with sheen level and grain direction.
  5. Handle or handleless strategy.
  6. Contents list, so we can set spans and load ratings.
  7. Lighting intent, driver access and switching arrangement.
  8. Interfaces with stone, plaster, fireplace and other joinery.
  9. Access route and delivery window relative to site trades.
  10. Who sets out, fixes and signs off on site.
  11. Quantity, phasing and whether the system repeats across units.

Closing: what a good enquiry looks like

Bring us the wall, the contents and the finish references, and we will return drawings that show every dimension and joint before anything is cut. That single exchange is what turns a floating modular system from a rendering into something that hangs true years later.