A single villa or boutique-hotel fit-out rarely stops at one door type. The same package that carries Santerson Wooden Sliding Doors usually also carries hinged doors, pocket doors, built-in wardrobes, sliding wall panels and the joinery that ties them together. That is where budgets slip: not on any one item, but on the seams between items — repeated opening measurements, mismatched finishes, hardware quoted twice or forgotten entirely. This guide sets out how to scope and price a multi-product door package so the number you approve early is the number you pay at production.

Why Sliding Doors Are Priced as Part of a Package

Santerson Wooden Sliding Doors are made to measure for residential door projects, with finish, layout and dimensions specified per project. The same configuration logic applies across the Windows and Doors range — flush sliding doors, wood veneer hinged and pocket doors, folding doors, concealed doors — and across the built-in ranges that sit next to them, such as Wooden Sliding Panels and Wooden Sliding Door Wardrobes.

Because each of those items is specified individually, a door line quoted in isolation hides three costs that only appear when the package is seen as a whole: the finish schedule that has to match across ranges, the track and wall preparation that one trade hands over to another, and the opening details that get measured twice if nobody owns them. Grouping the items into one scope lets you buy those shared elements once.

Step 1 — Build a Door Schedule Before You Ask for a Price

A door schedule is the cheapest control you have, and it is the document every later quotation is measured against. For each opening, record:

  • Room or zone, and the quantity of leaves required.
  • Opening width and height, plus the clear floor line the door must sit on.
  • The operating principle — surface-mounted sliding, flush sliding, pocket, hinged or folding.
  • Finish reference, so a wardrobe front and a door leaf in the same room are specified to the same surface.
  • Whether the opening also carries built-in furniture, panelling or a media wall.

Doors that share a wall or a finish family should be scheduled together. A sliding door that closes off a study, a set of sliding panels in the same hallway and a wardrobe with matching sliding doors read as three separate line items to most suppliers, and as one production run to a Built-in Furniture supplier that makes all of them.

Step 2 — Decide What Drives the Unit Rate

Once the schedule is fixed, four variables do most of the work on price. Naming them up front keeps revisions from turning into re-quotation.

Cost driverWhat to specifyWhere it can inflate the package
Opening size and non-standard heightsMeasured width, height and floor line for every opening in the schedule.Each deviation from a repeated module becomes its own production detail.
Finish familyOne finish reference applied consistently to doors, wardrobe fronts and panelling in the same zone.Several near-matching finishes across ranges means several surface runs.
Layout and number of leavesLeaf count, stacking direction and how the door relates to adjacent joinery.Late layout changes touch the door, the wall and the furniture around it.
Track, hardware and wall preparationWho supplies the track and hardware, and who prepares the wall or floor to receive them.Unassigned scope is bought twice by two trades, or left out entirely.

Product pages for these configurable items list made-to-measure sizing and material and finish options, and they ask that dimensions and selected specifications be confirmed for each project. Treat that as the trigger to freeze the schedule: every change after this point moves both the door and whatever it meets.

Where a product page and a specification block use different names or figures for the same item, do not fix that name or figure in your purchase documents. Carry the drawing reference instead, and confirm the exact designation on the production detail before sign-off.

Step 3 — Put the Shared Elements in One Scope of Work

With drivers identified, write one scope that covers every wood-fronted element in the affected zones rather than one scope per product family. In practice this means:

  • One finish schedule covering Santerson Flush Sliding Doors, wooden sliding doors, veneer hinged and pocket doors, plus wardrobe fronts and sliding panels in the same rooms.
  • One opening schedule, so an opening measured for a sliding door is not re-measured when a built-in unit is added beside it.
  • One hardware line per operating type, sized against leaf count and weight from the schedule.
  • One interface list naming what the site team prepares — floor lines, wall pockets, headroom for tracks — and what arrives with the product.

This is also where you decide whether the package stays inside one supplier's production plan. Coordinating doors, built-in furniture and interior fixtures through a single One-stop Furniture and Building Materials Supplier removes the reconciliation work between separate quotations — matching veneer tones, aligning reveal lines, agreeing who owns the track.

Step 4 — Use Custom & OEM Where Repetition Saves Money

In multi-unit work — several villas in one development, a floor of guest rooms, a cluster of apartments — the same door detail repeats many times. The Custom & OEM Service covers bespoke finishes and textures, prototyping and flexible order quantities, which is where repetition pays: one approved prototype, one finish reference, then repeated production against it. Confirm the minimum order quantity and current capacity for your specific package before you design around a bespoke finish.

For those projects, interior design support — space planning, furniture layouts, 3D renderings and drawing coordination with production — means the schedule and the visuals come from the same source. That single point of coordination is what keeps the door schedule and the joinery drawings from diverging mid-project.

Step 5 — Budget the Logistics Line, Not Just the Product

A door package arrives in crates that have to reach the same building as flooring, cabinetry and lighting. Freight by sea, air or rail, customs paperwork, packaging and container loading, and door-to-door delivery are all part of the delivered cost, and container mix affects it directly: doors shipped with matching joinery usually travel better than doors shipped alone, because the packing plan is designed once. Confirm import terms, duties, insurance and delivery scope for your own destination rather than assuming a published service description applies unchanged.

Then place installation in the same budget line as snagging. Sliding doors need their tracks, floor lines and reveals checked with the surrounding finish in place, which is exactly the inspection and handover sequence described under Installation & After-sales Support. Warranty terms, response times and exclusions vary — read them for your package before you rely on them.

A Worked Budget Sequence

The order below is what keeps a multi-product door budget stable from first estimate to production:

  • Freeze the opening schedule for all zones in scope, including openings that will also carry built-in units.
  • Fix one finish family per zone and issue it as a single reference list.
  • Group sliding doors, pocket and hinged doors, wardrobe fronts and sliding panels into one enquiry with the shared schedule attached.
  • Assign track, hardware and wall preparation to a named party in writing.
  • Approve one prototype or finish sample per family before releasing quantities.
  • Plan the container mix around the whole package, then budget installation and snagging with it.

Follow that sequence and a change late in the process affects one drawing rather than four quotations — which is the difference between a door budget that holds and one that quietly grows every time a finish is revisited.

Frequently Asked Questions

Can sliding doors and wardrobes be ordered together?

Yes. Sliding door wardrobes, sliding panels and room doors can be specified against one opening and finish schedule, so the fronts in a bedroom and the door serving it are produced to the same reference.

When should dimensions be confirmed?

After the opening schedule is frozen and before production release. Configurable product pages state that dimensions and selected specifications must be confirmed for each project, so treat the confirmed schedule as the release condition.

What should a quotation include beyond the leaves?

Track and hardware per operating type, packing for the container mix you have chosen, delivery terms to your destination, and the site preparation the doors depend on. If any of these are missing, ask which party owns them.

Talk to Us About Your Door Package

Send us your opening schedule, finish references and room list, and we will scope Santerson Wooden Sliding Doors alongside the doors, built-in furniture and interior fixtures they sit against — one schedule, one production plan, one delivered cost.

Contact SANTERSON — Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com