A flat-front, handle-free kitchen in a warm neutral tone looks simple from the outside. That simplicity is exactly what makes it hard to price. Two quotations for cabinets that look identical on a mood board can sit far apart, because the difference lives in the panel build, the edge treatment, the hardware and the information you supplied when you asked. This guide walks through what to send us so that a quote for Minimalist Slab Melamine Cabinets is accurate the first time, and what you should expect to see itemised in return.
Why minimalist slab fronts are harder to quote than decorated doors
A shaker or moulded door hides a great deal. The frame absorbs small differences in panel thickness, the routed profile carries most of the visual character, and a router template already exists for the shape you want. A slab front has nowhere to hide. It is one flat surface across its full width and height, so the substrate, the laminate, the edge band and the way the panel is mounted all become visible decisions with price consequences.
Melamine-faced board is the usual starting point for this style, and our custom minimalist kitchen cabinets range is built around flat panels with hidden handles or touch-to-open fronts. When you ask for a quotation, you are really specifying four things: the board behind the decorative surface, the decorative surface itself, how the four edges are finished, and how the door is opened and supported. A quote that names only a colour code cannot price any of them properly.
What to send with your enquiry
The more of the following you can attach, the closer the first number will be to the final one. If some items are still open, say so explicitly and we will quote the options side by side instead of guessing on your behalf.
- Room drawings or measured dimensions. A plan view with wall lengths, plus elevations showing window sills, ceiling height, sockets, switches and any existing pipework. Photographs of the space from each wall help where no drawing exists.
- The layout you want. Base units, wall units, tall housing for ovens, a pantry column, an island. Tell us which appliances are built in and give their model numbers or cut-out dimensions; appliance cavities drive cabinet sizes more than anything else on the drawing.
- Finish direction with a reference. A colour name alone is not enough across suppliers. Send a photograph, a RAL or Pantone reference, or a sample of an existing panel. For warm neutrals, our Wood Grain Melamine Cabinets and Two Tone Melamine Cabinets pages are useful for showing the effect you mean.
- Sheen level. Matte and high gloss take different production routes and different care routines. Compare Matte Melamine Cabinets with High Gloss Melamine Cabinets and tell us which one you are actually specifying.
- Opening method. Handleless with a routed pull channel, handleless with touch-to-open, or a discreet edge pull. Our handleless minimalist kitchen cabinets are built around continuous surfaces and soft-close fittings, and each method has its own hardware cost.
- Interior fit-out. Shelf layout, drawer counts and widths, cutlery organisation, bin housings, lazy Susan corners, integrated lighting in glass display units. List what goes inside, not just what you see outside.
- Quantity and scope. One apartment kitchen, or the same specification repeated across several apartments or hotel rooms? Repeat quantities change how we schedule production and pack the shipment.
- Delivery address and delivery terms. The port or site address, and whether you want door-to-door delivery handled for you or prefer to arrange freight from the port yourself.
- Programme dates. When the site needs the cabinets on the ground, and any earlier date needed for a sample or approval unit.
The specification details that move the price
Once we have your drawings, these are the points we will confirm with you before issuing a firm figure. Each one is a real cost line, and seeing them separately is how you compare two suppliers honestly.
Panel construction. The substrate behind the melamine surface, its thickness, and whether the panel is moisture-resistant in wet zones such as under the sink.
Edge treatment. Thin PVC edge, thicker ABS edge, or a wrapped edge that turns the corner onto the face. Wrapped edges suit pale and woodgrain tones where a visible edge line would break the surface.
Door size and grain direction. Tall slab doors need flatness control across a long span. On woodgrain finishes, the direction of the grain across neighbouring doors has to be decided at cutting, not on site.
Carcass and interior material. The visible front and the box behind it are specified separately, as is the thickness and edging of shelf boards.
Hinges, slides and lifts. Soft-close on every door and drawer, load rating on runners, lift-up fittings on wall units opened upwards. Hardware grade is one of the largest single differences between quotations.
Built-in appliance provisions. Ventilated oven housings, tall housing panels cut to appliance dimensions, and provision for a refrigerator column.
Worktop and splashback. Whether you want these supplied with the cabinetry or sourced locally. If supplied, send the thickness and edge profile you expect.
Packaging and loading. Panel weights, carton layout and container loading plan matter more as quantities grow, and they are what keep a delivered set undamaged.
How to request a custom quote through our OEM route
SANTERSON has been manufacturing furniture and building materials in China since 2008, and cabinetry sits within a wider range that also covers interior fixtures, flooring, wall and ceiling finishes, lighting and outdoor furniture. For a kitchen, that matters when the cabinets have to match what is already specified elsewhere in the same building: a wardrobe run in the bedrooms, doors and skirting, a feature wall panel, or joinery in a lounge.
Our custom and OEM service covers made-to-measure sizing, material and finish selection, prototyping before full production, and private labelling where you are supplying under your own brand. Minimum order quantities are agreed per project rather than applied as a fixed number, so tell us the quantity you actually have when you request a custom quote.
The working sequence on our interior design services page is brief and proposal first, then quotation and detail confirmation, then production, shipment and follow-up. The one-stop solution service covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, and final installation and handover.
What a complete quotation from us contains
- A unit-by-unit breakdown with dimensions, so you can see what you are paying for rather than a single lump sum.
- Panel and edge specification written out, including the substrate and the moisture-resistant board where it applies.
- Hardware listed by function and grade, with soft-close items identified.
- Worktop, splashback and appliance provisions shown as separate lines or marked clearly as excluded.
- Packaging and container loading plan, plus the freight options for your address under logistics and door-to-door delivery.
- A production schedule with the sample or approval stage marked, so you know when sign-off has to happen.
Questions worth asking before you commit
A quotation is easier to compare if you already know what the supplier will and will not take responsibility for. Ask these directly:
- Which party measures on site, and who carries the cost if an opening differs from the drawing?
- Is a sample panel or a single approval unit available before full production, and what does it cost?
- What tolerance is allowed for walls that are out of plumb, and how are scribes and filler panels handled?
- Who installs, and does installation guidance or on-site support come with the shipment under installation and after-sales support?
- What is covered for hinges and slides, and how are replacement parts supplied later?
- Which documents come with the shipment, and which import paperwork do you handle yourself?
Prices, schedules, freight terms and warranty terms are confirmed per project. We quote against your drawings and selected specifications rather than publishing fixed figures.
Send us your drawings and we will price them properly
Start with a plan, an elevation or photographs of the space, plus the finish reference and appliance list. If you are furnishing several apartments, villas or hotel rooms from one specification, send the unit mix as well — that is what lets us price production, packing and delivery as one programme instead of one kitchen at a time.
Talk to our team about custom cabinetry for your project. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Enquiry form: Contact us. Browse the full range at SANTERSON products.