A woven mesh pendant is one of the most specified decorative fixtures in restaurant and lounge interiors, because the thin cable shade reads differently from every seat in the room. It also exposes how little control a buyer has when the fixture arrives straight off a catalogue shelf: shape, scale, suspension length and finish are all fixed by someone else's drawing. This article explains how OEM furniture manufacturing works for our Modern Woven Mesh Pendant Light, what you send us, what we return to you, and where the commercial risk sits at each step if you are buying for a restaurant group, a hotel F&B outlet or a residential living room programme.
What OEM sourcing means here, in plain terms
OEM (original equipment manufacturer) sourcing means the fixture is built to your documentation rather than to ours. In practice the difference for a pendant light is narrow but decisive:
- Catalogue purchase — you take the hanging lamp as published, in one of the available shapes and colour options, and accept the standard suspension arrangement.
- OEM production — you supply the dimension drawing, the finish schedule and the mounting detail; we produce against that pack under our factory name, and the fixture carries your brand markings, packaging and labelling where required.
- Custom design — the geometry itself is new. That is a separate service line on our Custom & OEM Service page and starts with design work, not production.
The woven mesh pendant sits comfortably in the second category. Its shade is assembled from thin cables and connecting nodes, so shape, diameter and drop are variables your designer will want to control — a 600 mm cluster over a four-top and a 1200 mm single pendant over a bar counter are not the same production order even when they come from the same family.
Stage 1: what you send us
The quality of everything downstream depends on this pack. For a geometric mesh pendant we ask project buyers for:
| Item | Why it matters for this fixture |
|---|---|
| Room elevation or reflected ceiling plan | Sets the drop, the number of pendants and whether they hang in a cluster, a row or a single feature position. |
| Dimension drawing per variant | Shade diameter, overall height, cable length and canopy position. Mesh shades are read against table height and sightlines, so scale is the first thing to fix. |
| Finish schedule | Cable colour, node finish and canopy finish. Multiple shapes and colours are available on this model, so the schedule removes ambiguity at order confirmation. |
| Lamp and driver preference | Wattage, colour temperature, dimming protocol and whether the driver is remote or inside the canopy. This drives the mounting detail and the spare-parts list. |
| Ceiling build-up and load path | Plasterboard, timber batten, solid slab or steel deck. The fixing detail is agreed with your engineer before we ship, not after. |
| Branding and packaging brief | Label positions, carton marking, batch numbering — relevant when a group runs its own store programme or resale channel. |
| Delivery terms and site sequence | Site address, phasing and receiving hours. Lighting is usually installed late in a fit-out, so the delivery window matters more than the order date. |
If you do not have drawings yet, send photographs, a mood reference and the room dimensions instead. One-stop Furniture and Building Materials Supplier scope covers design consultation, product specification, production coordination and site follow-up, so pendant variants that have to match joinery, wall panelling or ceiling details can be resolved in one programme rather than across several suppliers.
Stage 2: what we return before any metal is cut
A quotation alone is not an approval. Our sequence on the Custom & OEM page runs from design proposal to detail confirmation to production, and for a pendant that means:
- A marked-up shop drawing showing every dimension, the canopy, the cable routing and the finish callouts.
- A material and finish sample reference so the cable colour and metallic node finish are agreed physically rather than from a screen.
- A pre-production sample for the variant you intend to order in volume. For mesh pendants this is where cable tension, node alignment and the shadow pattern the shade throws are checked — the fixture changes character once it is lit, not when it is unlit on a bench.
- Written confirmation of quantities per variant, packing method and container loading plan.
Sign the drawing. Every later change costs production time, and change requests after the sample stage are where lighting programmes normally lose their installation window.
Stage 3: production, inspection and packing
Once details are locked, the order enters production with quality control at assembly rather than only at the end. For this fixture we check:
- Shade geometry — diameter, height and symmetry of the woven pattern across every unit in the batch.
- Cable tension and node security, so the shade holds shape after suspension under its own weight.
- Finish consistency between units, including canopy and cable colour.
- Electrical assembly, driver seating, wiring continuity and a lit run before packing.
- Packing: pendant shades are open-frame and catch on carton corners, so the packing method is designed around the shade, not the other way round.
Minimum order quantities are flexible on this service line, but they are set per project and per variant. Confirm the number you can actually install per site before committing to a finish — it is cheaper to consolidate finishes across rooms than to carry dead stock in a spare-parts store.
Stage 4: shipping, installation and after-sales
We arrange sea, air or rail freight with the export paperwork handled on our side, including commercial invoices, packing lists and certificates of origin, under the Logistics & Door-to-Door Delivery service. Import duties, local wiring regulations and licensed electrical installation remain with you and your local contractor — we do not represent that our fixtures carry certification for a specific market unless the documentation for that order says so.
On site, the practical sequence is: verify ceiling set-out against the approved drawing, install blocking or the agreed fixing before the ceiling closes, hang and level each pendant to the marked drop, then commission dimming with the same control gear used across the floor. Our Installation & After-sales Support service covers site guidance, snag inspection, spare parts and replacement; ask for a spare-parts order at the same time as the main order — drivers, cable sets and a small number of complete shades are far easier to ship with the original container than to reproduce later.
Where this fixture earns its place
The illusionary geometric mesh shade casts ever-changing real and virtual shadow across the surfaces behind it, which is why it works in restaurants and lobbies rather than as general room lighting. Use it as atmosphere over tables, counters and seating groups, and pair it with functional light elsewhere. If one model does not carry the whole scheme, our wider Lighting Products range covers pendants, wall lights, floor lamps and ceiling fixtures for the same project — including a Modern Pinecone Petal Pendant Light for layered metal character over dining and lobby areas, and a Modern Crystal Ball Pendant Light where a softer, sparkling cluster is wanted.
A short checklist before you send an enquiry
- Room name, ceiling height and what the pendant hangs over.
- Quantity per variant, split by site or floor.
- Preferred shape and colour direction, plus anything to avoid.
- Dimming and control system already specified for the building.
- Required delivery address and the date fixtures must be on site.
- Any documentation your client or authority requires with the shipment.
Send us the drawings, or send us the room
Tell us the space, the quantity and the date the fixtures must arrive, and we will come back with a proposal, shop drawings and a production plan for the pendant variants you need. Contact SANTERSON to start an OEM enquiry.