A drawer-heavy modular wardrobe looks simple on a rendering. Rows of fronts, a clean line, done. The cost and the risk sit in what you cannot see: how deep each drawer is, what carries the load, how the carcass meets an uneven slab, and which details the quotation actually covers. For a commercial project — apartment handovers, serviced apartments, hotel guest rooms or villa developments — that gap between the picture and the deliverable is where change orders are born. Here is how to read a proposal properly before you sign it.
Start from the room program, not from the product photo
Our Drawer Focused Modular Wardrobes are made to measure, with the layout, dimensions and finish specified per project. That flexibility is an advantage only when you give the factory something concrete to work against. Before comparing prices, fix three things internally:
- Who uses the unit and for what. A guest-room wardrobe for two-night stays does not need the same drawer count as a long-stay serviced apartment.
- What the drawer bank must actually hold: folded clothing, linens, safe and luggage storage, or a mix.
- How many identical units there are, and how many different room types each layout has to serve.
A proposal that answers these three points is worth more than a cheaper one that shows a single generic elevation for every room type.
Read the layout drawing before you read the price
Ask for dimensioned elevations and a plan of each wardrobe type, with every drawer bank drawn at working depth. Then check four details on the drawing:
- Clear opening. Drawer fronts are only useful if the drawer opens without hitting the adjacent wall, bed, or door handle. On a tight guest room this is the most common late-stage complaint.
- Drawer distribution. A bank of four shallow boxes behaves differently from two deep ones. Deep drawers suit folded knitwear and linens; shallow top drawers suit accessories and are the first thing guests rummage through.
- What sits above and below. Hanging modular units and drawer units are often combined on site. Confirm whether one proposal covers both, or whether the hanging section is quoted by a different trade.
- Finish continuity. Check that the carcass edges, drawer fronts and any adjacent Combination Modular Wardrobes are specified in the same material and colour reference, so joinery across a floor looks like one design.
Check what is quoted and what is left out
Most disputes trace back to scope lines on the quotation, not to product quality. Read the exclusions column as carefully as the totals.
| Item | What a clear proposal states |
| Carcass and panels | Board type, thickness, edge treatment, and the finish reference for each visible surface |
| Runners and hardware | Runner brand or grade, load rating, soft-close or push-open, and whether hinges and handles are included |
| Internal fittings | Which trays, dividers, shoe racks, lighting or mirrors are in the price and which are options |
| Site conditions | Who supplies the level survey, packing out for uneven floors, and skirting or architrave cuts |
| Interface work | Whether flooring, wall finishes and cornices are completed before or after installation |
| Delivery and install | Packaging, container loading, delivery point, and who carries the units to the room of installation |
If any row above is blank, ask for it in writing. Our project services cover manufacturing, quality control, logistics and site coordination, so the scope conversation can be settled once instead of re-opened at every floor.
Judge the hardware by duty cycle, not by brand name
Drawer-focused joinery fails at the runners long before it fails at the panels. In a commercial setting the same bank is pulled daily for years, and housekeeping loads drawers unevenly. Two practical checks:
- Match the runner's stated load rating to the intended use. Linen storage in a hotel floor is heavier than guest clothing, and a runner chosen for wardrobes will sag under bed-linen stock.
- Confirm soft-close or self-close per unit type, and that replacement runners of the same grade can be ordered later. Ask which parts are held as spares; worn runners are the easiest repair to plan for and the hardest to improvise six months after handover.
Our installation and after-sales support covers on-site fitting, inspection with a snag list, spare parts and ongoing maintenance. The response times quoted on our site are company targets rather than guarantees, so write the ones your project depends into the contract.
Order one mock-up unit before the production run
For any repeat-order joinery, a single assembled sample answers more questions than any specification sheet. Set it up in conditions close to the real room and check:
- Drawer alignment across a full open-close cycle, with weight in the drawer.
- How the finish reads under your actual lighting — a matte lacquer that looks warm on a sample board can look flat once installed at scale.
- Edge and corner performance under trolley impact and cleaning chemicals used by your team.
- Whether the carcass can be packed out level against a real, imperfect wall.
Compare suppliers on coordination, not only on unit price
Wardrobes rarely arrive alone. Flooring, wall panelling, doors and lighting reach the same rooms in the same window, and each interface is a chance for damage or delay. A supplier who also produces interior fixtures and finishes can sequence those trades into one production and shipping plan instead of leaving your site manager to reconcile three separate deliveries.
Ask each bidder how they handle a change to a room dimension after production starts, how they label crates by room number, and what documentation comes with the shipment. Those answers tell you more about the next six months than the headline price does.
A short pre-contract checklist
- Dimensioned drawings for every room type, with drawer depths and clearances marked.
- Hardware schedule: runner grade, load rating, closing action, spare-parts availability.
- Finish references for carcass, fronts and edges, matched to adjacent joinery.
- Exclusions list reviewed line by line, including site preparation and interface trades.
- Approved mock-up unit, documented before mass production.
- Delivery labelling, install sequence and snag process agreed in writing.
Work through those six points and a drawer-focused modular wardrobe proposal becomes comparable across bidders — and far less likely to surprise you on site.