A swim spa of this size is not a catalogue item you order off a shelf. It arrives as crates, it needs a prepared base and an electrical supply, and the equipment inside it is chosen, not fixed. If you are a builder, a developer or a procurement lead specifying one for a villa, resort or residential scheme, the OEM route is usually where the real decisions get made. Here is how that process works for our Outdoor Swim Spa WS-130CⅣ-U, step by step, and what you should have settled before a purchase order is raised.
What OEM sourcing actually means here
OEM sourcing means the manufacturer builds to your specification rather than shipping a single standard configuration. For an outdoor swim spa, that covers the pump and jet package, the water treatment and heating options, the control system, finishes and colour, plus how the unit is broken down for transport and what documentation travels with it. It does not mean inventing a new shell from scratch on a short schedule; it means selecting from validated options and having them documented in one place before production starts.
We are a China-based manufacturer of furniture and building materials that has operated since 2008, and swim spas sit inside a wider supply scope alongside outdoor furniture for villas and resorts, bathroom fixtures, lighting, panelling and flooring. That matters for OEM work: when the pool shell, the surrounding deck furniture, the sun loungers and the changing-area joinery come from one factory, you get one specification set, one production window and one shipment plan instead of five vendors arguing over a site programme.
How the OEM process runs
Seven stages, and each one leaves a document behind. If a stage produces no signed paper, it has not happened yet.
Step 1: Confirm the base unit against your site
Before any option discussion, check that the standard envelope fits. The catalogue entry for WS-130CⅣ-U lists a length of 11830 mm, a width of 3000 mm and a height of 1430 mm. Those figures describe the assembled unit; access routes, turning radii, gate widths and the lift or crane needed to lower it onto a deck are your side of the equation, and we need them in writing early because they change how the unit is modularised.
The specification shown for this model also lists a control system (1 set), 4 water pumps, 1 filter pump, 23 jets in total, 5 LED lights and a total power figure of 11.85 kW. Treat that as the reference configuration on the product page, not as your final build: the same 11830 × 3000 × 1430 mm envelope is offered in neighbouring variants with different pump counts, jet totals, lighting counts and power draws, and one of them may suit your load budget better than this one. Quote the model code exactly when you ask for a comparison, because a one-character difference in the suffix changes the equipment list.
| Catalogue dimensions | 11830 × 3000 × 1430 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 23 pcs |
| LED lights | 5 |
| Total power | 11.85 kW |
| Features shown on the page | Water jets, LED lighting, Ozone |
Step 2: Fix the equipment and options list in writing
This is where an OEM order either holds together or falls apart at handover. The catalogue lists control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so an option that exists on one code may not be pre-plumbed on another. Ask us to confirm each line item against the exact model you are buying, and ask for the same answer in a written specification sheet rather than in a chat message.
Three details deserve particular attention:
- Swim training system. The specification for WS-130CⅣ-U does not list a swim training system, while the closely related code without the -U suffix is shown with one. If your client's brief says "lap swimming", do not assume either way: state the requirement and let us confirm which configuration carries the swim unit.
- Power and electrical supply. Total power on the reference sheet is 11.85 kW. Your electrician needs that number, plus voltage, phase and circuit protection requirements for the delivered configuration, before the first fix on site. Heating and filtration options change the load, so lock the options list first and issue the electrical drawing second.
- Water treatment. Ozone is shown as a feature on this model; UV sterilisation appears in the optional-accessories list. Decide which you are specifying and for how many running hours per day, because it drives both the equipment package and the maintenance schedule you hand to the building operator.
Step 3: Branding, finishes and private labelling
Our Custom & OEM Service covers bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation, including engraving, embossing, logos and packaging. Applied to a swim spa, that typically means cabinet and cladding colour, trim details, control-panel labelling, and the way the crates and manuals are branded when the unit reaches a developer who wants their own name on the amenity rather than ours. Confirm the finish samples and the minimum order quantity for your project before the production slot is booked; branding applied after painting usually means a second pass and a longer lead time.
Step 4: Prototyping, drawings and sign-off
For a repeat configuration that already runs in our workshop, this stage is document-based: dimensioned drawings, an equipment schedule, the electrical data sheet and a signed specification. Where the brief calls for something outside the standard range — a customised-shape outdoor spa in an oval or curved plan to sit inside a specific terrace, for example — we add 3D modelling and prototyping before production. Nothing is released to the production schedule until you have countersigned the drawing pack. That single step prevents the majority of site problems, because a swim spa cannot be trimmed on delivery day.
Step 5: Production, quality control and packing
Once the specification is signed, production follows the agreed sequence with inspection points recorded against it. Packing for an item of this size is engineered rather than improvised: panel protection, crate marking by module, and a packing list that matches the assembly sequence your installers will follow. If you are consolidating the spa with other goods — pergolas, loungers, bathroom ceramics or cabinetry from the same programme — tell us at quotation stage, because consolidated loading through our door-to-door delivery service is straightforward when it is planned and rarely works once separate orders have already shipped.
Step 6: Freight, customs and arrival
Freight moves by sea, air or rail, with commercial invoices, packing lists, certificates of origin and the paperwork your import requires. Import terms, duties, Incoterms, insurance cover and transit time are settled case by case for each destination. We do not publish a single guaranteed delivery window, and you should treat any supplier who does with caution. What you should insist on is a named logistics contact, a shipment tracking reference, and cargo insurance arranged at the quotation stage rather than after damage appears on a photograph.
Step 7: Site preparation, installation and after-sales
Delivery is not completion. On the buyer side, the base or plinth must be level and correctly loaded, the power and any heat-pump location must match the issued drawings, and access for future pump and filter servicing must exist after the deck is finished. Book commissioning against a completed site condition, not an optimistic construction programme — a swim spa sitting on a finished deck waiting for a distribution board is a costly holding pattern.
On our side, the installation and after-sales support scope covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. Confirm the installer arrangement for your location and get the written warranty terms and exclusions into the contract before the unit ships, so nothing sits unresolved at handover.
Common questions from procurement teams
Can you match an existing spa we specified from another supplier?
Send the dimensioned drawing and equipment schedule. We compare it against the closest catalogue envelope and tell you plainly where a configuration differs: jet count, pump arrangement, power draw or shell depth. We will not promise a like-for-like substitute where one does not exist.
Is the 11.85 kW figure final?
No. It is the total power shown for the reference configuration on this product page. Heat pumps, additional pumps and treatment options change it. Get the confirmed figure for your build before electrical work starts.
What is the minimum order quantity for OEM work?
Our service page describes flexible minimum order quantities rather than one fixed threshold, because the practical minimum depends on what is being customised. A colour change and a branded control panel are not the same commitment as new tooling. Ask with your project volume and we will answer with a number.
Can the spa be supplied together with the rest of the outdoor package?
Yes, and it is usually the reason buyers start the conversation. Pool or spa, hardtop gazebo, loungers, dining set and the one-stop supply of furniture and building materials can run on one production schedule with one consolidated shipment plan.
If you are specifying WS-130CⅣ-U, or weighing it against a nearby variant in the same range, send us the model code, the site drawings and the equipment list you have been given. We will return three documents that decide whether the installation runs to programme: a confirmed specification, an electrical data sheet and a freight plan.
Send enquiries with the model code and your site drawings through our contact page, and include the destination port so the freight quotation arrives with the production lead time rather than after it.