A swim spa quotation goes wrong long before the factory prices it, usually because the buyer sent a photograph instead of a specification. If you are specifying Outdoor Swim Spa WS-PC05ST-L for a villa terrace, a resort garden or a therapy area, the brief you send decides whether the quotation you receive is comparable with the next one. The list below follows the order we need information in, and it marks clearly what only you can decide.

Start with how the unit will be used

The same shell serves very different purposes, and each one changes the equipment list. Tell us which of these describes your project, in plain words rather than marketing language:

  • Daily lap swimming against a current, where the swim training system is the core item and its setting matters more than the jet count.
  • Hydrotherapy and muscle recovery, where jet layout and water temperature stability drive the specification.
  • Children's play or guest leisure at a villa or resort, where depth, access steps and supervision sightlines matter.
  • A mixed arrangement with a swim channel at one end and a lower, seated relaxation zone at the other, as on our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool.

Also state who operates the unit and how often. A resort pool used by dozens of guests each week needs a different filtration and sanitisation approach from a family spa used three times a week.

Send the site conditions, not just the model number

WS-PC05ST-L is a self-contained acrylic unit with catalog dimensions of 5490 × 2400 × 1470 mm. Those figures are what we work from, but your site determines whether the unit can be installed at all. Please include in your brief:

  • Whether the spa sits on a terrace, deck, plinth, sunken pit or indoor plant room, and the finished floor level around it.
  • Access route from the delivery vehicle to the final position, including gate widths, stair runs, lift dimensions and any overhead obstruction. A five-metre shell cannot be flexed around a corner.
  • Drainage arrangement, overflow route and whether a pump pit is available for maintenance water.
  • Structural confirmation from your engineer that the slab or deck carries a full water load plus occupants. We do not certify the supporting structure.
  • Local electrical supply: phase, voltage and frequency, plus where the isolator and dedicated circuit will be run. Total power for this model is listed as 6.55 kW in the catalogue, and final requirements depend on the configuration you select.
Send drawings if they exist: a site plan with dimensions, an electrical single-line sketch, and photographs of the prepared base. A three-photo set answers more questions than a long email.

Separate what is fitted from what is optional

Catalogue entries list both, and buyers often compare quotations that include different items. Here is the catalogue record for WS-PC05ST-L so you can copy it into your brief and mark your choices:

Catalog dimensions5490 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4 pcs
Total power6.55 kW
Water pumpNot listed in the catalogue for this model
Features shownWater jets, LED lighting, Ozone, Swim training system

Catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each option for the configuration you choose rather than assuming it fits. Two items decide running cost more than any other: the heat pump sizing against your climate and target water temperature, and the level of insulation around the shell and cover if the spa is used year-round in a cool season.

If you are comparing footprints within the same series, Outdoor Swim Spa WS-PC05ST-S carries the same equipment pattern in a 5000 × 2400 × 1470 mm shell, which suits tighter terraces. The full range sits under Swimming Pools and Swim Spas.

Say what must be changed, and what must not

Standard shells cover many projects. Where they do not, our Custom Furniture Manufacturer and OEM team works to your drawings, from material and finish choices through to branding. In the brief, state clearly:

  • Shell or cabinet finish, colour and cladding to match surrounding architecture.
  • Jet type and placement changes for therapy use, and whether seating positions need to change with them.
  • Cover specification, lockable controls, handrail positions and step orientation for public or guest use.
  • Any dimension that must change because of the site, with the reason stated so we can check what the shell allows.

Where a change affects pressure, flow or electrical loading, say so in the brief and we will confirm feasibility before pricing rather than after. If your project groups the spa with other outdoor elements, our Outdoor Furniture for Villas and Resorts range is specified at the same time so finishes and decking details match.

Set out delivery, installation and handover expectations

Tell us where the unit lands and who does what on site. We arrange Furniture Logistics and Door-to-door Delivery, including packaging, container loading and export paperwork, and we provide Furniture Installation and After-sales Support with inspection and snagging at handover. Your brief should still name:

  • Incoterms you want quoted, the destination address and whether a crane or tail-lift is needed at the site.
  • Who prepares the base, runs power and provides the water connection: normally your contractor, not us.
  • Your required on-site date, working back from it to production and transit rather than hoping for a slot.
  • Spare parts you want shipped with the unit, such as cartridges and light modules, so they arrive in the same container.

For villa and resort projects where the spa is one item among many, our Turnkey Interior Project Solutions team coordinates it with cabinetry, outdoor furniture and finishes in a single programme, which removes the usual argument about who was responsible for the delay.

What a complete brief contains

  • Model reference and intended use, with user type and frequency.
  • Site plan, access route, base photographs, drainage arrangement and structural sign-off from your engineer.
  • Electrical supply details and the installed power you can support.
  • The catalogue specification copied in, with options marked as wanted, rejected or to be advised.
  • Required dates for production, shipment and on-site installation.
  • Named decision-maker on your side, so answers come back to one person.

Send that and the first quotation is usually the last one you need. Values above follow our current catalogue entry; we confirm dimensions, equipment list and electrical requirements against your selected configuration before production begins.

Questions buyers ask us

Can WS-PC05ST-L go indoors?

Yes, when the room provides adequate ventilation, a drained floor and the required electrical circuit. Humidity control is your engineer's decision, and we advise the clearances our installation team needs for service access.

Why does my current quotation not match another supplier's?

Because one includes a heat pump, UV sterilisation or insulation and the other does not. Mark each option as included or excluded in your brief and ask for the same breakdown, and the comparison becomes meaningful.

Do you supply only standard sizes?

Standard shells are available across the range, including a shorter 5000 mm version of this model. Where the site demands a different footprint or finish, we handle it as a custom build against your drawings.

Talk to us before you finalise the specification

Send your site photographs and marked specification to PHILLIP on +86-13928214007 (phone/WhatsApp) or santerson@qq.com, and we will confirm equipment options, power requirements and lead time for your configuration. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8). Our factory is in Longjiang, Shunde, Foshan, China, with offices in Vietnam, Singapore and South Africa.