A glass sliding door wardrobe is one of the easier built-in items to specify badly. The render looks right, the supplier sends a price, and then the on-site dimensions do not match, the glass type was never confirmed, or the internal layout arrives with shelves where you needed hanging space. A quote request that carries complete information removes most of that risk before production starts.

SANTERSON manufactures made-to-measure built-in wardrobes as part of its furniture and interior fixtures range, so every enquiry is quoted from your drawings and specifications rather than from a standard catalogue size. The checklist below covers what to send with your request and what you should expect back.

Before You Write: Confirm the Door Type Is Right for the Room

Sliding doors need clear wall run. Two panels travelling over each other require roughly twice the panel width of opening, plus track depth on both sides of the carcass. If your alcove is shallow or the wall is interrupted by a doorway or column, compare the same layout with hinged or corner alternatives before requesting a price.

Glass frontage suits bedrooms, dressing rooms and hotel guest rooms where you want reflected light and a visual read of what is inside. Frosted, smoked, bronze, ribbed and mirrored glass each behave differently in a small room, so decide the direction first and let the quote follow it.

What to Include in Your Quote Request

Send these six items together. Anything missing comes back as a question, and each round trip adds days to the timeline.

  • Room dimensions. Overall width, height and depth of the wardrobe run, plus floor-to-ceiling variation, skirting, architraves, cornices, power points and any bulkhead. Give finished-floor levels, not structural slab levels.
  • A sketch or drawing. A marked-up plan or elevation with dimensions is enough. If you have architectural drawings from the project, send the relevant sheets instead of redrawing them.
  • Door and glass specification. Number of panels, sliding direction, glass type and tint, frame colour if you want an aluminium-framed door, and whether handles are required or a handleless edge is preferred.
  • Internal layout. Long-hang and short-hang zones, drawer banks, shelves, trouser rack, lighting, and the height of each hanging area. State who uses the wardrobe and what it stores; this drives proportions more than aesthetics do.
  • Carcass material and finish. Board type, edge treatment, interior finish colour, and any matching requirement to existing joinery such as custom minimalist bedroom wardrobes or kitchen cabinetry in the same project.
  • Project context. Quantity of wardrobes, delivery city and port, install window, and whether the site is a private residence, an apartment development or a hotel fit-out. This determines packing, freight mode and how units are split for transport.

How the Specification Turns Into a Price

Made-to-measure wardrobes are quoted by configuration, not by linear metre. These are the variables that move the number most:

VariableWhat you decideEffect on the quote
Glass typeClear, frosted, smoked, bronze, ribbed or mirrored; tempered as specifiedFrontage and hardware grade change together; heavier frontage needs a matching track and roller set
Panel count and sizeTwo, three or four panels across the runMore, narrower panels cost more than two wide panels over the same opening
Carcass heightBelow-ceiling or full height to a soffitFull-height runs need scribes, filler panels and careful level tolerance work on site
Internal fit-outShelves versus drawers versus hanging zonesDrawer banks, soft-close runners and interior lighting are the main cost drivers inside the box
Finish matchingStandard finish or matched to existing joineryMatched colour and grain require a sample round before production is released
Quantity and packingOne wardrobe or a repeated apartment layoutRepeated layouts pack and ship more efficiently; single bespoke units carry more handling per unit

The Sliding Door Wardrobes collection also covers high gloss sliding door wardrobes, matte lacquer fronts, mirror fronts and timber-fronted sliding doors. If you are comparing finishes across rooms, request the quote for all of them in one enquiry so the carcass specification stays identical and only the door frontage changes.

What a Complete Quotation Should Return

Check the document you get back against this list. A quotation that answers these points is ready for approval; one that does not will cause problems at handover.

  • Dimensioned elevation drawings for each wardrobe, with panel split and door travel marked.
  • Written specification of carcass board, edge banding, glass type and thickness, hardware brand or grade, and finish reference.
  • Internal layout drawing showing every hanging height, drawer bank and shelf.
  • Unit breakdown for shipping, with the packing list and total volume, so your freight forwarder can price the consignment.
  • Delivery terms stating the port or door address covered, and what is excluded.
  • Installation notes: track setting tolerance, wall preparation, and who sets out the site levels.

For apartment developments and hotel rooms, ask for the layout as a repeatable module with one or two variants. Repeating an approved configuration across many rooms keeps pricing and production consistent, which is where turnkey project solutions save the most coordination effort.

Questions Worth Asking Before You Approve

  • Which tolerance range does the site opening need to fall inside, and who is responsible for bringing it into that range?
  • Is a pre-production sample of the glass and carcass finish available for sign-off?
  • How are sliding panels and spare rollers packed and identified for on-site assembly?
  • What happens if a panel is damaged in transit — replacement panel only, or a full door set?
  • Which drawings are released to production after your approval, and can changes still be made at that point?

Get those answers in writing with the quotation. The specification you approve is the one that gets built.

Send Your Drawings for a Wardrobe Quotation

Submit room dimensions, a marked-up elevation and your preferred glass frontage, and the specification is quoted as made-to-measure production with freight arranged to your site. Enquiries receive a reply within 24 hours during business hours (Monday to Saturday, 8:00 AM to 6:00 PM GMT+8).

Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com

Send dimensions, door and glass specification, internal layout and delivery location in one enquiry. The quotation comes back with drawings and a packing breakdown you can hand straight to your installer and freight forwarder.