A matte lacquer finish looks quiet and expensive precisely because it hides nothing. Soft, even light across the door face is what buyers respond to, and it is also what exposes a badly set-out room: an out-of-plumb wall, a floor that falls away toward a doorway, or a ceiling that will not let a full-height carcass land square. The finish does not cause those problems, but it refuses to forgive them. That is why the installation plan matters more for matte lacquer wardrobes than for a pre-finished freestanding piece.
For a project where the joinery is made to measure and shipped internationally, the plan is also the document that keeps ordering, freight and site labour in sequence. Here is what we build into every wardrobe installation plan we prepare, and what you should expect to see before your doors are cut.
1. A measured survey of the actual room, not the drawing
Tolerances on finished slab heights, plaster lines and ceiling levels are where a made-to-measure run goes wrong. Ask for a survey taken on site once the floor finish, skirting, plasterboard and any wall lining are in place, and record:
- Floor-to-ceiling height at several points across the run, not one average figure.
- Wall plumb and square, noted by direction, so scribing is designed rather than improvised on the day.
- The exact position of switch plates, outlets, air grilles, downlights and curtain recesses that will sit against or above the cabinetry.
- Door and window reveals, radiators or pipework, and any return the wardrobe has to close against.
- Floor finish build-up if tiling or screed is still to come, so the carcass base height is set with the completed level in mind.
Where the run turns a corner, survey the corner itself. An L-shaped corner wardrobe only works if the two legs meet at a recorded angle; assuming 90 degrees is the fastest way to end up with a visible scribe line at the turn.
2. Confirmed layout and internal configuration
The plan should show what goes inside before it shows what goes outside. Hanging lengths for long garments, shelf spacing for folded storage, drawer heights, a mirrored or glass-front section, lighting in the interior — each decision changes carcass depth and door size, so fix them before production rather than during installation.
Our wardrobe range is specified per project — made-to-measure sizing, material and finish options, and a layout tailored to the space. That flexibility is an advantage only when the configuration is frozen in writing. If your plan lists nothing but overall dimensions, it is not yet a production document.
3. Door type, opening clearance and circulation
The door decision is a floor-area decision as much as an aesthetic one. Note on the plan which system each bay uses and check the swing or slide against the room:
| Door type | What the plan must record |
|---|---|
| Hinged | Clearance for the full arc, handle projection, and whether the door clears the bed, the ensuite entry or a vanity when open. |
| Sliding | Track depth, overlap between panels, wall length available for the pocket, and access to the bay behind. |
| Walk-in / open | Whether an enclosure is needed at all, sightlines from the bedroom, and dust control for open hanging. |
Matte fronts suit a flat, handleless look, but then the plan needs to say how the door is actually opened — routed pull, push mechanism or recessed profile — because that hardware has to be built in, not added later. If you are weighing finishes as well as openings, our matte sliding door wardrobes page shows how the same low-sheen look behaves on a sliding elevation.
4. Substrate, structure and fixing method
A full-height wardrobe is heavy and it carries lateral load every time a drawer is pulled. The plan should state what the carcass is fixed to and how:
- Wall construction — masonry, stud partition, or plasterboard over a cavity — and the corresponding fixings and noggins required.
- Whether a scribe frame, filler panel or ceiling soffit is used to absorb unevenness instead of forcing the carcass square.
- Base treatment on tiled or timber floors: plinth, adjustable legs, or a raised toe with a moisture barrier where the floor is wet.
- Anti-tip and restraint details for tall units, especially in homes with children.
If the design continues onto adjacent walls as panelling or a headboard wall, note that junction too. Lacquer panels meeting lacquer doors have to be aligned on the same datum line, and that alignment is decided on paper.
5. Finish schedule and site conditions
Lacquer is a sprayed, cured finish, so the plan should carry the same level of detail as a paint specification:
- The approved colour or sheen reference for each elevation, including internal faces where they are visible with doors open.
- Which surfaces are lacquered, which are edge-banded or laminated, and how two materials meet at a reveal.
- Sequence relative to wet trades: wardrobes should be installed after painting, tiling and flooring are complete, so overspray, dust and moisture never meet the finished face.
- Ventilation and humidity during installation and handover, and whether the room is heated and dry or still curing.
- Cleaning and handling protocol for the installers, with protective film removed only at handover.
6. Delivery route, packaging and handling to the room
Tall door panels cannot be negotiated around a narrow stair. Record the delivery path in advance — lift size, stair width, turning landings, corridor doors — and confirm that panels will pass through every opening on that path at their packed dimensions. For imported joinery, the plan should also cover:
- Packaging specification and container or parcel breakdown, with panel weights stated so site labour is sized correctly.
- Arrival date checked against the site programme, with storage inside the building — dry, level and off the floor — until installation.
- A check-in step on arrival: piece count, panel condition, edge and face damage photographed before anything is signed for.
Freight forwarding, customs documentation and door-to-door delivery are part of our project service, so the delivery plan can be written alongside the production schedule rather than bolted on afterwards.
7. Installation sequence, labour and snag list
Set out the day in order: carcasses levelled and fixed first, doors hung and adjusted next, then hardware, interior lighting and finally cleaning. The plan should name who does each step and what is inspected afterwards — door alignment and gap consistency, drawer runners, soft-close behaviour, scribe lines, and any mark on a lacquered face.
Ask for a snag list at handover with sign-off against it, plus the spare-parts route: replacement hinges, runners, handles and a matched touch-up for the finish. Installation support and after-sales are named parts of our project service, so those lines can be agreed in advance rather than discovered on site.
8. Cost lines that get missed
| Line item | Why it belongs in the plan |
|---|---|
| Scribing and filler panels | Older buildings are rarely square; allowance here avoids variation orders. |
| Internal fittings and lighting | Priced separately from carcasses and doors, and ordered with them. |
| Freight, duties and inland delivery | Quoted against the delivery address, not assumed to be included. |
| Site preparation | Electrical moves, packing out walls, extra flooring height. |
| Storage and protection on site | Especially where other trades are still working after joinery arrives. |
If you want a second look before committing, send us the room dimensions, wall construction and your intended layout. We will confirm sizing, finish options and configuration for matte lacquer wardrobes against your drawings, flag the site conditions that need resolving first, and put the whole plan — production, delivery and installation — into one schedule. Contact PHILLIP to start that review.