A compact laundry fit-out looks simple on a drawing: two appliances, a cabinet, some storage. On site it is one of the most argumentative corners of a bathroom or utility project, because plumbing, power, ventilation, joinery tolerances and tiling all meet in a space that may be barely wider than the machine itself. An installation plan is what keeps those trades from meeting for the first time on the day of handover. Below is what we ask buyers, contractors and designers to have settled before a Compact Laundry Solutions unit leaves the factory.
1. The exact appliance schedule, not an assumed one
Everything else in the plan hangs off this. Confirm the make, model and loading type of each machine before the cabinet is drawn, because the recorded depth, the door swing, the hinge side and the service clearance all change with the appliance. A stacked configuration behaves very differently from a side-by-side one: Stacked Laundry Units need a clear vertical load path and an access point to the upper machine, while WasherDryer Cabinets spend floor width instead of height.
Write the appliance dimensions and connection points into the same drawing that shows the cabinet, so nobody compares two different documents on site.
2. Measured clearances: rough opening versus finished opening
Record three numbers, not one. The structural opening, the finished opening after tiling and plaster, and the appliance envelope with hoses and doors included. Finish build-up is where compact spaces fail — a wall that was 650 mm before tiling is smaller afterwards, and the machine arrives at the end of the programme.
Also fix the door and drawer swing on paper: which side the appliance door opens, whether the cabinet doors are hinged or sliding, and what needs to be removable for servicing. Our Laundry Integration pieces are made to measure, so layout, dimensions, material and finish are specified per project rather than chosen from a fixed size list.
3. Services: water, drainage, power and ventilation
- Hot and cold supply locations, and whether stopcocks stay reachable once the cabinet is closed.
- Drain route and standpipe height, including how the trap is reached if it sits behind a panel.
- Outlet positions for each appliance, kept clear of the cabinet carcass and not buried behind the machine.
- Ventilation for a dryer and for any enclosed cupboard, plus access to filters.
- Waterproofing and floor fall where the laundry shares a wet area with a bathroom.
Mark these on the joinery drawing as well as the services drawing. A single coordinated sheet prevents the classic fix: an outlet box that is exactly where the cabinet back panel goes.
4. Storage and workflow around the machines
The machines are only half of a compact laundry. Decide what has to live in the corner: detergent, hooks, folding surface, ironing storage, linen. Laundry & Storage Combo layouts pair the appliance zone with closed storage so the room still reads as a bathroom fit-out rather than a plant corner. Pull Out Laundry Hampers and Multi Function Tall Cabinets carry the daily traffic upward, which is usually the right trade in a narrow plan.
Specify the working surface height and depth at the same time as the cabinet run. A folding ledge added after installation rarely aligns with either the appliances or the tiling line.
5. Materials and finish for a damp room
State the board, edge and surface specification in writing, along with the expected exposure: splash zone, tumble-dryer heat, condensation from a hot shower nearby. Confirm the finish sample against the adjacent bathroom joinery before production, so doors, worktops and tall cabinets read as one set on handover.
6. Sequence, access and responsibility
A compact laundry fails on programme when the cabinet arrives before the tiling, or the appliances arrive after the handover. The plan should show the order of works — first fix, services test, wet trades, joinery installation, appliance connection, final inspection — and name who does each step.
Cover delivery too: lift size, corridor width, floor protection, storage location on site. For projects we supply, the sequence runs from design and production through door-to-door delivery to installation and after-sales support, so the same team can be asked for the missing item instead of three separate suppliers.
7. Snag list and handover pack
Close out with something a client can actually check: door alignment, drawer run, secure fixings, no movement under spin cycle, hoses accessible, outlets reachable, finishes free of damage. Attach the as-installed dimensions, the selected finishes, the appliance schedule and the care instructions. That pack is what makes a warranty claim or a later replacement straightforward instead of a return visit for measurements.
If your laundry corner is smaller than the catalogue suggests it should be, plan it as a made-to-measure piece from the start. Send the drawing and the appliance list, and we will return a layout you can hand to the trades.