A U-shaped corner wardrobe wraps storage around two walls and the return between them, so it carries more hanging, shelving and drawer volume than a straight run of the same floor length. That is exactly why a quote for one cannot be priced from a single measurement. The layout has to resolve door clearances, an internal corner junction and a finish that matches the rest of the joinery package. This guide sets out what to send when you request a custom quote for U shaped corner wardrobes, and what comes back.

Before you write to a supplier: fix the brief

Most slow quotation cycles happen because the first enquiry answers only one question — how big is the alcove. A U-shaped layout has three runs and two internal corners, so start with the plan.

  • Room drawing with three run lengths. Give the clear wall-to-wall dimension of each leg, plus the depth you can give up at each side. Note ceiling height, skirting, cornice, and any downlight or bulkhead that cuts into the top line.
  • Door swing and circulation. Hinged doors need room to open; sliding doors need track depth and an overlap zone. Mark the bed, doorway and bathroom entry so the layout can be checked against traffic flow.
  • What the corner junction does. Decide whether the deep return is a blind carcass with shelves accessed from both legs, or a fitted carousel and pull-out. This single choice moves the price more than the finish does.
  • Internal zones by habit. Long hanging for coats and dresses, double hang for shirts, drawer banks for folded items, open shelving for daily access. Send the split you actually want rather than accepting a default grid.

What to include in your enquiry

SANTERSON builds these pieces made-to-measure, with sizing, material and finish specified per project, so the more of the following you supply on day one, the closer the first number is to the final one.

ItemWhat to send
DimensionsA scaled plan or a site sketch with each run length, overall depth, and height. Photographs of the two corners and any uneven wall help us allow for scribe lines on site.
Layout typeU shaped, L shaped corner wardrobes, or a walk-in variant — and whether the third leg is full height or stops at a dressing-table height.
Door styleHinged, sliding or open. Sliding door corner wardrobes suit rooms where a hinged leaf would foul the bed; hinged doors give full visual access to every bay at once.
Material and finishBoard substrate, door face (lacquer, veneer, melamine, glass or aluminium frame), handle or handleless edge, and any matching skirting, architrave or niche panelling.
Internal fittingsHanging rail heights, drawer count and widths, tray and shelf depths, lighting to interior bays, plus soft-close hardware preference.
Project contextSingle apartment or repeated units across a development; delivery address and port of entry; who installs on site.
A note on dimensions: for built-in wardrobes, take each measurement at three points along the run — floor, mid-height and ceiling. Older villas and apartments rarely return square corners, and a U-shaped unit has two of them to absorb. We confirm final dimensions against your drawings before production starts.

How the quotation comes back

Enquiries through our custom and OEM service follow the same route as a project order: brief and drawings, then a design proposal with 3D visualisation, then a quotation with itemised specifications you can check line by line. You receive carcass sizes, door make-up, hardware schedule and finish references — not one rounded figure — so substitutions are visible and comparable.

Where the wardrobe sits inside a wider fit-out, we price it alongside the cabinetry, wall panelling, doors and flooring in the same package. That is how joinery on villa and apartment projects in Sydney, Melbourne and Perth stays consistent across rooms: one production coordination, one set of tolerances, one shipment.

Questions worth asking before you accept

  • Which tolerance is allowed between the drawn wall line and the built carcass, and who supplies scribe panels on site?
  • Is the internal corner supplied as one fixed return or as two butt-jointed carcasses, and how is the join finished?
  • What is the packaging specification for a three-run unit travelling by sea, and how are the runs labelled for assembly?
  • Who carries out installation and snagging at the destination, and what handover documentation comes with the unit?

If you would like a layout reviewed before pricing — or you have drawings ready — send them through our contact page. We quote from drawings, and a 3D rendering of the U-shaped run is prepared with the proposal so you can see the corner junction working before anything goes into production.

Whether the room calls for a full-height open corner wardrobe or a closed three-run built-in, send the plan first. The quote is faster and more accurate when the geometry arrives with the enquiry.