A full height storage wall looks simple on a drawing: one continuous run of panels from floor to ceiling, no visible gaps, doors that open quietly, shelves where you need them. It is only simple in the rendering. In production it is a made-to-measure joinery package, and the difference between a clean installation and a snag list usually comes down to what was written down before manufacturing started.
SANTERSON manufactures Santerson Full Height Storage Walls as part of the Integrated Storage Walls collection. Sizing, layout, material and finish are all specified per project, which is exactly why a vague enquiry produces an unreliable quotation. The checklist below is the information our production and design teams work from when a storage wall brief comes in.
1. Give the manufacturer the room before you describe the furniture
Storage walls fail at the interfaces: skirting lines that are not straight, ceilings that slope a few millimetres over a four-metre run, doors and light switches that fall where a door leaf is planned. Send the wall first.
- Length, height and depth of the run, taken at several points along the wall rather than one spot — out-of-square walls are common in both new builds and renovations.
- Floor finish build-up: whether the screed, tile or timber flooring is already laid or still to come, and how thick it will be. This decides whether the carcass sits on a plinth or is scribed on site.
- Ceiling type — plasterboard, cornice, exposed slab, or a bulkhead that the wall has to wrap around.
- Positions of switches, power points, air grilles, radiators, skirting and architraves, with distances from both datum corners.
- Photographs of the wall from each end plus a straight-on shot, and a short video walking the wall. These catch defects that a dimension sketch hides.
Our interior design service covers space layout planning, concept design and 3D visual renderings, and we coordinate drawings with production before anything is cut — see Interior Design Services. If you already have an architect's drawing, send it as-is; we work from your drawings rather than asking you to redraw them.
2. Specify the storage logic room by room
The same wall of panels can hide three completely different interiors. Tell us what is being stored, and in what quantity, because hanging heights, drawer stacks and shelf spans are all driven by that.
| What you store | What to write into the brief |
|---|---|
| Hanging clothes | Short-hang versus long-hang bays, number of rails, whether a second rail is wanted in any bay. |
| Folded items and linen | Shelf heights you actually use, and which shelves need to take weight without sagging over their span. |
| Small items | Drawer count and depth per stack, tray dividers, whether soft-close runners are required. |
| Books, display pieces, ceramics | Open bays rather than closed doors — see Santerson Open Display Niches, with shelf spans and the size of the largest item to be displayed. |
| Television and media | Screen size and mounting method, equipment bays that need ventilation and cable routes, remote-control line of sight if doors stay closed. |
| Bulky or awkward items | Suitcases, vacuum cleaners, ironing boards — give the tallest single item so the deepest bay can be sized around it. |
Most projects mix these. Where you want display visible and clutter concealed in the same run, say so; Santerson Mixed Open & Closed Storage is configured that way, with open bays set into an otherwise closed wall.
3. State the door system and the finish you want
Door choice changes both the clearance in front of the wall and the manufacturing detail, so it belongs in the first enquiry rather than at shop-drawing stage.
- Hinged doors need swing clearance; note anything within that arc — a bed, a bedside table, a bathroom basin.
- Sliding doors save the swing but need a pocket or an overlap line. Santerson Sliding Storage Panels are made to measure for the opening and can carry the same finish as the fixed panels.
- Handleless fronts keep the surface flush and unbroken. If you want that look, say so explicitly — profile, edge detail and clearance differ from a handled door.
- Concealed doors are the option when the wall should read as panelling rather than cabinetry; Hidden Cabinets uses flush panels that continue the wall line.
For finishes, send a target — a colour code, an existing door or joinery sample to match, or a photograph of a room you like — and tell us where the wall is. A bedroom wardrobe, a hallway storage wall in a rented apartment and a bathroom vanity wall face different humidity and wear conditions, and the board and surface choice should follow that rather than the picture.
4. The items that cause most rework when they are left out
- Appliances and plumbing. Any integrated appliance, basin or tap in the run must be named with its model data before panels are made.
- Lighting inside the wall. Santerson Integrated Cabinet Lighting is configured to the cabinet design, so niche positions, driver location and switching need confirming before panels are machined. Confirm electrical ratings and installation requirements for your market with your local electrician.
- Fixings into the structure. Tell us what is behind the plasterboard — stud type, timber or steel framing, solid masonry — because tall runs need to be anchored properly.
- Access and delivery. Stair width, lift dimensions, corridor turns and whether panels can be crated to size. A four-metre panel that fits the drawing may not fit the service entrance.
- Site sequence. Whether painting, flooring and electrical first-fix are complete when installation is scheduled. Installation on an unfinished site produces damage, not savings.
5. Repeat the detail instead of repeating the mistake
For apartment blocks, villa portfolios and hotel rooms, the useful deliverable is a type drawing per room type: one agreed elevation, one agreed internal layout, one agreed finish schedule, then quantities by unit. Deviations get flagged at measurement stage rather than discovered during installation across forty rooms.
SANTERSON works as a one-stop furniture and building materials supplier, so a storage wall can be ordered against the same drawings as the wardrobes, kitchen cabinetry, doors, vanities, flooring and lighting in the same project. That single set of dimensions travels through site survey, 3D design, manufacturing, quality control and on-site installation — the workflow described under Turnkey Solutions — which is where coordination savings actually come from.
Where a project needs something not in the catalogue, our Custom & OEM Service covers bespoke design and prototyping, material and finish selection, and brand or private-labelling options. Minimum order quantities and current capacity are confirmed per project.
A short brief template that gets an accurate quotation
- Project name, location, and whether it is a single residence or multiple units.
- Room-by-room wall dimensions taken at multiple points, plus photographs.
- Floor and ceiling condition, and the planned finish build-up.
- Storage content per bay: hanging, shelving, drawers, display, media, bulky items.
- Door system, handleless or handled, and the finish target or sample reference.
- Appliances, plumbing and internal lighting to be integrated.
- Target installation date and the site readiness sequence around it.
- Access constraints: lift, stair, service entrance, crate size limits.
Send that and we can price the wall properly, flag the interface risks early, and produce shop drawings you can approve before manufacturing begins. Freight by sea, air or rail, customs documentation and door-to-door delivery are arranged through our logistics service; installation and after-sales support follow on site.
If you have a wall to solve, send the dimensions and photographs of the room — not just the cabinet idea — and we will come back with a layout, a finish proposal and a quotation built on the same numbers.